INTERIM ORDERS - 2008
Thermal
| Petition No |
Subject |
Date of Hearing |
Date of Order |
25/2008 |
Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW). NTPC Limited, New Delhi |
13-05-2008 |
15-05-2008 |
53/2008 I.A. No. 4/2008 |
Approval of provisional tariff for Mejia Thermal Power Generating Station Unit No. 5 of 250 MW Damodar Valley Corporation, Kolkata |
- |
30-04-2008 |
24/2008 31/2008 |
1. Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 for Ramagundam Super Thermal Power Station, Stage-III (500 MW). 2.Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Talcher Thermal Power Station, Stage-I (460 MW) NTPC Limited, New Delhi |
22-04-2008 |
28-04-2008 |
125/2007 In 126/2007 |
1.Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2004-05 to 2006-07 and impact of year-wise lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS -I (600 MW).Neyveli Lignite Corporation Limited, Chennai.Tamil Nadu Electricity Board, Chennai. 2.Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2004-05 to 2006-07 and impact of year-wise pooled lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS -I (Expansion) (2x210 MW).Neyveli Lignite Corporation Limited, Chennai. |
22-11-2007 |
14-01-2008 |
Hydro
Transmission
| Petition No |
Subject |
Date of Hearing |
Date of Order |
 91/2008 along with I.A. 18/2008 |
Approval of incentive based on availability of transmission system of Western Region for the year 2007-08. Power Grid Corporation of India Limited, Gurgaon |
- |
11-08-2008 |
I.A. 15/2008 In 87/2007 |
Determination of final charges for sub-load Despatch Centre at Modipuram under UPPCL. Power Grid Corporation of India Limited, Gurgaon |
- |
01-08-2008 |
I.A. 14/2008 143/2005 |
Approval of tariff for Unified Load Despatch & Communication (ULDC) Scheme in Southern Region for the period from 1.4.2004 to 30.6.2017 and additional capitalization after date of commercial operation during 2001 to 2004. Power Grid Corporation of India Limited, Gurgaon |
- |
30-07-2008 |
I.A. 13/2008 74/2006 |
Approval of charges for Unified Load Despatch and Communication (ULDC) Scheme in Eastern Region for the period from 1.9.2005 to 31.8.2020. Power Grid Corporation of India Limited, Gurgaon |
- |
30-07-2008 |
I.A. 12/2008 147/2005 |
Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in North Eastern Region for the period 1.4.2004 to 30.6.2018 and additional capitalization after date of commercial operation during 2003-04. Power Grid Corporation of India Limited, Gurgaon |
- |
29-07-2008 |
81/2008 In 9/2008 |
Approval of incentive based on availability of 400 kV D/C Gorakhpur-Lucknow transmission line, 400 kV D/C Barielly-Mandola transmission line and 400 kV D/C Muzaffarpur-Gorakhpur transmission line (50% share), associated with Tala Hydro Electric Power Project, East-North inter-connector and Northern Region Transmission System for the year 2007-08. Powerlinks Transmission Limited, New Delhi |
- |
29-07-2008 |
82/2008 In 10/2008 |
Approval for incentive for the year 2007-08 in respect of 400 kV D/C Siliguri Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)- Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorakhpur (50%) transmission line associated with Tala Hydro Electric project, East-North interconnector and Northern Region transmission system. Powerlinks Transmission Limited, New Delhi |
- |
29-07-2008 |
162/2005 |
Approval of incentive based on availability of transmission system for the year 2004-05 for Northern Region Power Grid Corporation of India Ltd., Gurgaon |
17-06-2008 |
23-06-2008 |
48/2000 |
Transmission tariff for 400 kV Bongaigaon-Malda transmission line between Eastern and North-eastern Regions. Power Grid Corporation of India Ltd., Gurgaon |
15-05-2008 |
09-06-2008 |
51/2008 |
Determination of provisional transmission tariff for LILO of 400 kV Lucknow (UPPCL)-Sultanpur (UPPCL) Transmission line at Lucknow (Power Grid) along with associated bays under Northern Region System Strengthening Scheme-I for the period 1.1.2008 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
22-05-2008 |
26-05-2008 |
36/2008 |
Determination of provisional transmission tariff of LILO of 1st Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station and LILO of 2nd Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station associated with 220 kV Interconnection with Jharkhand State Electricity Board system at Ranchi sub-station in Eastern Region for the period from date of commercial to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
15-05-2008 |
21-05-2008 |
43/2008 |
Determination of provisional transmission tariff for (i) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays (ii) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II, Phase-I Transmission System in Northern Region for the period 2004-09. Power Grid Corporation of India Limited, Gurgaon |
15-05-2008 |
16-05-2008 |
35/2008 |
Determination of provisional transmission tariff for LILO of 400 kV S/C Korba-Raipur transmission line at Bhatapara sub-station along with associated bay equipment including ICT-I of Bhatapara sub-station under Sipat-II transmission system of Western Region for the period from 1.12.2007 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
15-05-2008 |
16-05-2008 |
43/2008 |
Determination of provisional transmission tariff for (i) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays (ii) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II, Phase-I Transmission System in Northern Region for the period 2004-09. Power Grid Corporation of India Ltd., Gurgaon |
15-05-2008 |
16-05-2008 |
44/2008 |
Determination of provisional transmission tariff for (i) 220 kV S/C Unchahar-Raibareilly transmission line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow transmission line at Raibareilly and 100 MVA, 220/132 kV ICT III at Raibareilly along with associated bays and (ii) 100 MVA, 220/132 kV ICT II at Raibareilly sub-station along with associated bays for the period from date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon |
15-05-2008 |
16-05-2008 |
63/2008 |
Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2004 for determination of transmission tariff due to additional capitalization incurred during 2005-06 and 2006-07 for Hiriyur sub-station (including 315 MVA Auto Transformer) LILO of Davangere-Hoody 400 kV D/C transmission line at Hiriyur and additional bays at Kolar and Hosur sub-stations for second circuit of Kolar-Hosur 400 kV D/C transmission line under system strengthening Scheme-II in the Southern Region for the period 1.4.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon |
- |
06-05-2008 |
23/2008 |
Determination of provisional transmission tariff for 765 kV Sipat-Seoni Ckt -I, 765/400 kV ICT-I at Seoni ( New sub-station) and LILO of 400 kV Bhilai-Satpura transmission line at Seoni & 400/220 kV ICT-I at Seoni sub-station along with two 220 kV transmission line bays commissioned under Sipat-I Transmission System in Western Region. Power Grid Corporation of India Limited, Gurgaon |
22-04-2008 |
30-04-2008 |
160/2007 I.A. No. 45/2007 |
Determination of final transmission tariff for (i) LILO of one circuit of 400 kV D/C Farakka-Jeerat line at Subhashgram and establishment of 400/220 kV Sub-station (New) at Subhashgram including 1 x 315 MVA, ICT-II for the period 1.3.2007 to 31.3.2009. (ii) 315 MVA, 400/220 kV, ICT-I at Subhashgram sub-station (New) for the period from 1.4.2007 to 31.3.2009 under strengthening scheme for Eastern Region (formerly part of Tala supplementary Scheme) in Eastern Region Power Grid Corporation of India Ltd., Gurgaon |
21-02-2008 |
28-02-2008 |
165/2007 |
Determination of provisional transmission tariff for LILO of 400 kV S/C Lucknow -Moradabad transmission line at Bareilly (Power Grid) along with associated bays under Northern Region system strengthening scheme-I in Northern Region for tariff block 2004-09 period. Power Grid Corporation of India Limited, Gurgaon |
20-02-2008 |
20-02-2008 |
158/2007 |
Determination of provisional transmission tariff for Ckts IV & III of 400 kV D/C Satna-Bina transmission line under Vindhyachal Stage-III transmission system in Western Region for the period up to 31.3.2009.Power Grid Corporation of India Limited, Gurgaon |
22-01-2008 |
23-01-2008 |
133/2007 135/2007 IN 136/2007 137/2007 |
1.Determination of final transmission tariff up to DOCO and additional capitalization from DOCO to 31.3.2007 for system strengthening scheme in Northern Region (formerly part of Tala Supplementary Scheme) for the period 2004-09.2.Determination of final transmission tariff for 400 kV D/C Agra-Bassi transmission line (CKT-III and II) along with associated bays under Northern Region System Strengthening Scheme-II in Northern Region for the tariff period 2004-09.3.Determination of final transmission tariff for Tala-Siliguri Transmission System in Eastern Region for period 1.10.2005 to 31.3.2009 and remaining transmission system for the period 1.5.2006 to 31.3.2009.4.Determination of final transmission tariff of 2nd 315 (3x105 MVA), 400/220 kV transformer at Indravati (OHPC) switchyard in Eastern Region for the period 1.5.2006 to 31.3.2009.Power Grid Corporation of India Limited, Gurgaon, |
17-01-2008 |
18-01-2008 |
141/2007 |
Determination of final transmission tariff of (i) 400 kV Siliguri sub-station (extension) (relevant portion), 400 kV Purnea sub-station (extension) (relevant portion) (excluding 400/220 kV, 315 MVA ICT at Purnea sub-station), 40% Fixed Series Compensation (FSC) and 5% to 15% Thyristor Controlled Series Compensation (TCSC) on each Ckt of Purnea-Muzaffarpur 400 kV D/C line at Purnea (DOCO 1.5.2006), (ii) 400/220 kV, 315 MVA ICT at Purnea sub-station (DOCO 1.6.2006) , (iii) 400/220 kV Muzaffarpur sub-station (New) (Excluding 2no, 400 kV bays at Muzaffarpur with line reactors for Muzaffarpur Gorkhpur line and ICT-II at Muzaffapur sub-station), 220 kV Muzaffarpur sub-station (BSEB Kanti) Extension (DOCO 1.9.2006) and provisional transmission tariff of 400/220 kV, 315 MVA ICT-II at Muzaffarpur sub-station (DOCO 1.6.2007) associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from DOCO to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon. |
10-01-2008 |
16-01-2008 |
105/2007 68/2007 |
Review of the order dated 18.6.2007 in Petition No.68/2007- Direction to CTU for grant of long-term open access on the existing ER-WR corridor, i.e. 400 kV Raipur-Rourekela transmission line including 220 kV Korba Budhipadar transmission line for transfer of 400 MW power from DVC stations at Mejia and Chandrapur.Power Grid Corporation of India Ltd., Gurgaon. |
13-09-2007 |
14-01-2008 |
147/2007 148/2007 in149/2007 |
1.Approval of final transmission tariff for 400 kV D/C Muzaffarpur-Gorkhpur transmission line in Eastern-Northern inter-connector, associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.Powerlinks Transmission Ltd., New Delhi. 2.Approval of final transmission tariff for 400 kV D/C Siliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.Powerlinks Transmission Ltd., New Delhi 3.Approval of final transmission tariff for 400 kV D/C Gorakhpur-Lucknow transmission line and 400 kV D/C Bareilly-Mandola line associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the period from 1.8.2006 to 31.3.2009 and 1.5.2006 to 31.3.2009 respectively.Powerlinks Transmission Ltd., New Delhi |
10-01-2008 |
14-01-2008 |
168/2007 I.A.No. 47/2007 |
Approval of incentive based on availability of 400 kV D/C Silliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorkhpur transmission line (50% share), in Eastern Region associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the year 2006-07.Powerlinks Transmission Limited, New Delhi. |
- |
02-01-2008 |
169/2007 I.A. No. 48/2007 |
Approval of incentive based on availability of 400 kV D/C Gorkhpur- Lucknow transmission line , 400 kV D/C Bareilly-Mandola line and 400 kV D/C Muzaffarpur-Gorkhpur transmission line (50% share), associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the year 2006-07.Powerlinks Transmission Limited, New Delhi. |
- |
02-01-2008 |
Licensing
UI/RLDC
| Petition No |
Subject |
Date of Hearing |
Date of Order |
 55/2008 (Suo motu) |
Default in payment of Unscheduled Interchanges (UI) charges for the
energy drawn in excess of the drawal schedule. MP Power Trading Corporation Limited |
12-08-2008 |
14-08-2008 |
55/2008 along with I.A. 8/2008 |
Default in payment of Unscheduled Interchange (UI) charges for the energy drawn in excess of the schedule, MP Power Trading Company Limited, Jabalpur |
31-07-2008 |
05-08-2008 |
60/2008 |
Petition for direction RRVPNL to pass order on concurrence as per Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008 Gujarat Flurochemicals Limited, Dist. Panchmahal (Gujarat) |
26-06-2008 |
08-07-2008 |
55/2008 (Suo motu) |
Default in payment of Unscheduled Interchanges (UI) charges for the energy drawn in excess of the drawal schedule. MP Power Trading Corporation Limited |
- |
04-07-2008 |
12/2008 (Suo motu) |
Default in payment of Unscheduled Interchanges (UI) charges for the energy drawn in excess of the drawal schedule. Meghalaya State Electricity Board |
- |
04-07-2008 |
74/2006 |
Approval of charges for Unified Load Despatch and Communication Scheme in Eastern Region for the period from 1.9.2005 to 31.8.2020. Power Grid Corporation of India Limited, Gurgaon |
26-06-2008 |
03-07-2008 |
87/2007 |
Determination of final charges for Sub-Load Despatch Centre at Modipuram under UPPCL. Power Grid Corporation of India Limited, Gurgaon |
26-06-2008 |
03-07-2008 |
143/2005 147/2005 |
1. Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in Southern Region for the period 1.4.2004 to 30.6.2017 and additional capitalization after date of commercial operation during 2002-03 to 2004-05. 2. Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in North Eastern Region for the period 1.4.2004 to 30.6.2018 and additional capitalization after date of commercial operation during 2003-04 to 2004-05. Power Grid Corporation of India Ltd. |
10-06-2008 |
18-06-2008 |
33/2008 |
Petition for permission to notionally inject the electricity generated by wind power projects into Northern Regional grid as unscheduled interchange. Gujarat Fluorochemicals Limited, Ranjit Nagar |
- |
19-03-2008 |
04/2008 |
Petition for permission to notionally inject the electricity generated by Petitioner's power plant into the Southern Regional grid as unscheduled interchange. Global Energy Limited, Mumbai |
21-02-08 |
22-02-2008 |
117/2007 |
Directions to the NR constituents to honour the power transfer limits and curb the overdrawals from the grid so that the entire NEW electricity grid is secure.Northern Regional Load Despatch Centre, New Delhi |
- |
15-02-2008 |
10/2008 |
Open Access for inter-State transmission of power generated by Nava Bharat Ventures Ltd through M/s. Reliance Energy Trading Ltd, to the distribution utilities in Andhra Pradesh.Nava Bharat Ventrues Ltd, Hyderabad |
- |
30-01-2008 |
General
| Petition No |
Subject |
Date of Hearing |
Date of Order |
77/2008 I.A. 7/2008 |
Approval of incentive based on availability of transmission system of North Eastern Region for the year 2007-08. Power Grid Corporation of India Limited, Gurgaon |
- |
09-07-2008 |
50/2008 |
Miscellaneous petition to order to refund the excess tariff collected on the capitalization of outstanding liability not materialized and consequent withdrawal of such excess capitalization in respect of Ramagundam Super Thermal Power Station, Stage I & II (2100 MW) and other NTPC stations during the tariff period 2001-04. Tamil Nadu Electricity Board |
24-06-2008 |
25-06-2008 |
33/2008 |
Petition for permission to notionally inject the electricity generated by wind power projects into Northern Regional grid as unscheduled interchange. Gujarat Fluorochemicals Limited, Ranjit Nagar, Gujarat |
24-04-2008 |
17-06-2008 |
64/2008 67/2008 |
1. Fixation of and adjudication on the transmission charges of Gujarat transmission system used for transmission of the power from the State of Gujarat to Union Territory of Diu and Daman under Sections 62 and 79 of the Electricity Act 2003 2. Fixation of and adjudication on the transmission charges of Gujarat transmission system used for transmission of the power from the State of Gujarat to Union Territory of Dadra and Nagar Haveli under Sections 62 and 79 of the Electricity Act, 2003. Gujatat Energy Transmission Corporation Ltd., Vadodra |
27-05-2008 |
04-06-2008 |
68/2008 |
Petition for apportionment of UCPTT rate of 35 Paise per kWh of North Eastern Region for the period 1.2.2000 to 31.3.2007 in view of the Judgment dated 4.1.2008 in Appeal No. 98 of 2007 of the Appellate Tribunal for Electricity. Power Grid Corporation of India Ltd., Gurgaon |
22-05-2008 |
04-06-2008 |
41/2008 |
Petition for sale of power in to the Western Regional grid as unscheduled interchange. Jindal Power Ltd, New Delhi |
27-05-2008 |
27-05-2008 |
107/2007 |
Petition for direction to U.P Power Corporation Ltd (UPPCL) for payment of compensation amount to M.P Power Trading Co. Ltd (MPTRADECO) due to retention of MP's share of power/non-supply of it from Rihand and Matatila Hydel Power Stations to MPSEB and resumption of MP's share of power from Rihand and Matatila Hydel Power Stations. Madhya Pradesh Power Trading Company Ltd., Jabalpur. |
13-05-2008 |
16-05-2008 |
119/2006 |
Petition for in principle` acceptance of the project capital cost of project and financing plan of 1040 MW (gross) power project being set up by the Navabharat Power Private Ltd. in Orissa. Navabharat Power Private Ltd, Orissa |
13-05-2008 |
15-05-2008 |
19/2008 |
Adjudication of dispute on account of non-payment of long outstanding dues and non-refund of Earnest Money Deposit by ASEB arising out of trading operation of electricity. Adani Enterprises Ltd., Gurgaon |
18-03-2008 |
13-05-2008 |
46/2008 |
Review of the order dated 22.9.2006 in Petition No. 149/2004 pertaining to determination of generation tariff in respect of Simhadri TPS, (1000 MW) for the period 1.4.2004 to 31.3.2009-Re-determination of the FERV component of Rs. 142.95 crore for the year 2003-04 claimed by NTPC (Simhadri TPS) from AP Discoms Transmission Corporation of Andhra Pradesh Ltd., Hyderabad & Others. |
13-05-2008 |
13-05-2008 |
10/2000 |
Petition for fixation of wheeling charges. Madhya Pradesh State Electricity Board, Jabalpur |
08-05-2008 |
08-05-2008 |
143/2006 |
Petition under Section 79(1) (f) of the Electricity Act, 2003. Indraprastha Power Generation Company Limited |
08-05-2008 |
08-05-2008 |
58/2008 (Suo motu) |
Clarity regarding control areas and demarcation of scheduling responsibility between RLDCs and SLDCs |
- |
07-05-2008 |
41/2008 |
Petition for sale of power in to the Western Regional grid as unscheduled interchange (UI). Jindal Power Ltd, New Delhi |
- |
24-04-2008 |
107/2007 |
Petition for direction to U.P Power Corporation Ltd (UPPCL) for payment of compensation amount to M.P Power Trading Co. Ltd (MPTRADECO) due to retention of MP's share of power/non-supply of it from Rihand and Matatila Hydel Power Stations to MPSEB and resumption of MP's share of power from Rihand and Matatila Hydel Power Stations. Madhya Pradesh Power Trading Company Ltd., Jabalpur |
03-04-2008 |
03-04-2008 |
10/2000 |
Petition for fixation of wheeling charges. Madhya Pradesh Electricity Board, Jabalpur |
11-03-2008 |
13-03-2008 |
11/2008 (Suo Motu) |
Contravention of Commission's order dated 31.12.2007 in Petition No. 156/2007 arising out of non-approval of open access by Southern Regional Load Despatch Centre (SRLDC) on the ground of non-receipt of consent from SLDC-OPTCL. |
28-02-2008 |
28-02-2008 |
107/2007 |
Petition for direction to U.P Power Corporation Ltd (UPPCL) for payment of compensation amount to M.P Power Trading Co. Ltd (MPTRADECO) due to retention of MP's share of power/non-supply of it from Rihand and Matatila Hydel Power Stations to MPSEB and resumption of MP's share of power from Rihand and Matatila Hydel Power Stations. Madhya Pradesh Power Trading Company Ltd. |
22-01-2008 |
27-02-2008 |
24/2007 |
Refusal No 131 of 25.1.2007 by the Western Regional Load Despatch Centre of the open access application filed by Tata Power Trading Company Limited for transmission of 27 MW power through Eastern Regional Load Despatch Centre and Orissa State Load Despatch Centre from Nava Bharat Ventures Ltd, on the ground of "No consent from OPTCL". 1. Nava Bharat Ventures Ltd, Hyderabad
2. Tata Power Trading Company Ltd, Mumbai |
12-02-2008 |
13-02-2008 |
16/2006 IN 152/2007 153/2007 |
1.Dispute relating to apportionment of capacity charges of three NTPC Stations among the beneficiaries for the month of October 1998.2.An application challenging the energy bill of GRIDCO for the period November 1998 in respect of drawal of NTPC power during off-peak hours.3.An application challenging the energy bill of GRIDCO for the period November 1998 in respect of drawal of NTPC power during off-peak hours.Grid Corporation of Orissa Ltd., Bhubaneswar.M/s Ferro Alloys Corporation Ltd….M/s Tata Steel Ltd |
29-01-2008 |
30-01-2008 |
143/2006 |
Petition under Section 79(1) (f) of the Electricity Act, 2003.Indraprastha Power Generation Company Limited.Haryana Vidyut Prasaran Nigam Limited, Panchkula. |
29-01-2008 |
29-01-2008 |
- |
Detailed Procedure For Bilateral Transactions and Related Matters-Open Access Regulations,2008. |
- |
31-01-2008 |
4/2008 |
Petition for permission to notionally inject the electricity generated by power plant into Southern Regional grid as unscheduled interchange.Global Energy Limited, Mumbai. |
- |
14-01-2008 |
| <<--Back |
|
|