INTERIM ORDERS - 2008

<<--Back

Thermal

 
Petition  No
Subject
Date of Hearing
Date of Order

25/2008

Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW). NTPC Limited, New Delhi
13-05-2008 15-05-2008

53/2008
I.A. No. 4/2008

Approval of provisional tariff for Mejia Thermal Power Generating Station Unit No. 5 of 250 MW Damodar Valley Corporation, Kolkata
- 30-04-2008

24/2008
31/2008

1. Approval of revised fixed charges after considering the impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 for Ramagundam Super Thermal Power Station, Stage-III (500 MW).
2.Determination of impact of additional capital expenditure incurred during 2004-05, 2005-06 and 2006-07 on fixed charges of Talcher Thermal Power Station, Stage-I (460 MW) NTPC Limited, New Delhi
22-04-2008 28-04-2008

125/2007
In
126/2007

1.Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2004-05 to 2006-07 and impact of year-wise lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS -I (600 MW).Neyveli Lignite Corporation Limited, Chennai.Tamil Nadu Electricity Board, Chennai.
2.Approval of revised fixed charges considering the impact of additional capital expenditure incurred during the period 2004-05 to 2006-07 and impact of year-wise pooled lignite price for the period 2004-09 determined on energy charges and capacity charges for NLC TPS -I (Expansion) (2x210 MW).Neyveli Lignite Corporation Limited, Chennai.
22-11-2007 14-01-2008

Hydro

Petition  No
Subject
Date of Hearing
Date of Order

22/2008

Review of the order dated 13.12.2007 in Petition No. 107/2006-Approval of final tariff in respect of Dhauliganga Hydroelectric Project Stage-I (4x70MW) of National Hydroelectric Power Corporation Limited for the period from 1.10.2005 to 31.3.2009. National Hydroelectric Power Corporation Limited
22-04-2008 22-04-2008

141/2006

Approval of provisional generation tariff of Dulhasti Hydroelectric Project (3x130 MW) from the date of commercial operation till determination of final tariff. National Hydroelectric Power Corporation Ltd., Faridabad
- 28-03-2008

63/2006

Approval of generation tariff in respect of Tehri Hydroelectric Project Stage-I (4x250 MW) for the period 22.9.2006 to 31.3.2009. Tehri Hydro Development Corporation Ltd.
- 28-03-2008

158/2004

Approval of generation tariff of Bairasiul Hydroelectric Project for the period 1.4.2004 to 31.3.2009. National Hydroelectric Power Corporation Ltd.
- 26-03-2008

155/2007

Approval of final tariff of Vindhyachal STPS, Stage-III,(1000 MW) for the period from 1.12.2006 to 31.3.2009. NTPC Limited, New Delhi
12-02-2008 13-03-2008

20/2008

Approval of final generation tariff of Nathpa Jhakri Hydroelectric Project for the period 1.4.2004 to 31.3.2007 and provisional generation tariff for the period 2007-09. Satluj Jal Vidyut Nigam Limited, Shimla
- 05-03-2008

67/2003(Suo motu)

Amendment of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2004
- 08-02-2008

Transmission

Petition  No
Subject
Date of Hearing
Date of Order

91/2008
along with I.A.
18/2008

Approval of incentive based on availability of transmission system of Western Region for the year 2007-08. Power Grid Corporation of India Limited, Gurgaon
- 11-08-2008

I.A.
15/2008
In
87/2007

Determination of final charges for sub-load Despatch Centre at Modipuram under UPPCL. Power Grid Corporation of India Limited, Gurgaon
- 01-08-2008

I.A.
14/2008
143/2005

Approval of tariff for Unified Load Despatch & Communication (ULDC) Scheme in Southern Region for the period from 1.4.2004 to 30.6.2017 and additional capitalization after date of commercial operation during 2001 to 2004. Power Grid Corporation of India Limited, Gurgaon
- 30-07-2008

I.A.
13/2008
74/2006

Approval of charges for Unified Load Despatch and Communication (ULDC) Scheme in Eastern Region for the period from 1.9.2005 to 31.8.2020. Power Grid Corporation of India Limited, Gurgaon
- 30-07-2008

I.A.
12/2008
147/2005

Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in North Eastern Region for the period 1.4.2004 to 30.6.2018 and additional capitalization after date of commercial operation during 2003-04. Power Grid Corporation of India Limited, Gurgaon
- 29-07-2008

81/2008
In
9/2008

Approval of incentive based on availability of 400 kV D/C Gorakhpur-Lucknow transmission line, 400 kV D/C Barielly-Mandola transmission line and 400 kV D/C Muzaffarpur-Gorakhpur transmission line (50% share), associated with Tala Hydro Electric Power Project, East-North inter-connector and Northern Region Transmission System for the year 2007-08. Powerlinks Transmission Limited, New Delhi
- 29-07-2008

82/2008
In
10/2008

Approval for incentive for the year 2007-08 in respect of 400 kV D/C Siliguri Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)- Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorakhpur (50%) transmission line associated with Tala Hydro Electric project, East-North interconnector and Northern Region transmission system. Powerlinks Transmission Limited, New Delhi
- 29-07-2008

162/2005

Approval of incentive based on availability of transmission system for the year 2004-05 for Northern Region Power Grid Corporation of India Ltd., Gurgaon
17-06-2008 23-06-2008

48/2000

Transmission tariff for 400 kV Bongaigaon-Malda transmission line between Eastern and North-eastern Regions. Power Grid Corporation of India Ltd., Gurgaon
15-05-2008 09-06-2008

51/2008

Determination of provisional transmission tariff for LILO of 400 kV Lucknow (UPPCL)-Sultanpur (UPPCL) Transmission line at Lucknow (Power Grid) along with associated bays under Northern Region System Strengthening Scheme-I for the period 1.1.2008 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
22-05-2008 26-05-2008

36/2008

Determination of provisional transmission tariff of LILO of 1st Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station and LILO of 2nd Ckt of Patratu-Hatia-Chandil 220 kV D/C transmission line at Ranchi sub-station associated with 220 kV Interconnection with Jharkhand State Electricity Board system at Ranchi sub-station in Eastern Region for the period from date of commercial to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
15-05-2008 21-05-2008

43/2008

Determination of provisional transmission tariff for (i) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays (ii) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II, Phase-I Transmission System in Northern Region for the period 2004-09. Power Grid Corporation of India Limited, Gurgaon
15-05-2008 16-05-2008

35/2008

Determination of provisional transmission tariff for LILO of 400 kV S/C Korba-Raipur transmission line at Bhatapara sub-station along with associated bay equipment including ICT-I of Bhatapara sub-station under Sipat-II transmission system of Western Region for the period from 1.12.2007 to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
15-05-2008 16-05-2008

43/2008

Determination of provisional transmission tariff for (i) 400 kV D/C Biharshariff-Balia transmission line Ckt-I with associated bays (ii) 400 kV D/C Biharshariff-Balia transmission line Ckt-II with associated bays under Kahalgaon Stage-II, Phase-I Transmission System in Northern Region for the period 2004-09. Power Grid Corporation of India Ltd., Gurgaon
15-05-2008 16-05-2008

44/2008

Determination of provisional transmission tariff for (i) 220 kV S/C Unchahar-Raibareilly transmission line along with associated bays at Raibareilly, LILO of 220 kV D/C Unchahar-Lucknow transmission line at Raibareilly and 100 MVA, 220/132 kV ICT III at Raibareilly along with associated bays and (ii) 100 MVA, 220/132 kV ICT II at Raibareilly sub-station along with associated bays for the period from date of commercial operation to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon
15-05-2008 16-05-2008

63/2008

Approval under Regulation 86 of CERC (Conduct of Business) Regulations 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2004 for determination of transmission tariff due to additional capitalization incurred during 2005-06 and 2006-07 for Hiriyur sub-station (including 315 MVA Auto Transformer) LILO of Davangere-Hoody 400 kV D/C transmission line at Hiriyur and additional bays at Kolar and Hosur sub-stations for second circuit of Kolar-Hosur 400 kV D/C transmission line under system strengthening Scheme-II in the Southern Region for the period 1.4.2005 to 31.3.2009. Power Grid Corporation of India Ltd., Gurgaon
- 06-05-2008

23/2008

Determination of provisional transmission tariff for 765 kV Sipat-Seoni Ckt -I, 765/400 kV ICT-I at Seoni ( New sub-station) and LILO of 400 kV Bhilai-Satpura transmission line at Seoni & 400/220 kV ICT-I at Seoni sub-station along with two 220 kV transmission line bays commissioned under Sipat-I Transmission System in Western Region. Power Grid Corporation of India Limited, Gurgaon
22-04-2008 30-04-2008

160/2007
I.A. No. 45/2007

Determination of final transmission tariff for (i) LILO of one circuit of 400 kV D/C Farakka-Jeerat line at Subhashgram and establishment of 400/220 kV Sub-station (New) at Subhashgram including 1 x 315 MVA, ICT-II for the period 1.3.2007 to 31.3.2009. (ii) 315 MVA, 400/220 kV, ICT-I at Subhashgram sub-station (New) for the period from 1.4.2007 to 31.3.2009 under strengthening scheme for Eastern Region (formerly part of Tala supplementary Scheme) in Eastern Region Power Grid Corporation of India Ltd., Gurgaon
21-02-2008 28-02-2008

165/2007

Determination of provisional transmission tariff for LILO of 400 kV S/C Lucknow -Moradabad transmission line at Bareilly (Power Grid) along with associated bays under Northern Region system strengthening scheme-I in Northern Region for tariff block 2004-09 period. Power Grid Corporation of India Limited, Gurgaon
20-02-2008 20-02-2008

158/2007

Determination of provisional transmission tariff for Ckts IV & III of 400 kV D/C Satna-Bina transmission line under Vindhyachal Stage-III transmission system in Western Region for the period up to 31.3.2009.Power Grid Corporation of India Limited, Gurgaon
22-01-2008 23-01-2008

133/2007
135/2007
IN
136/2007
137/2007

1.Determination of final transmission tariff up to DOCO and additional capitalization from DOCO to 31.3.2007 for system strengthening scheme in Northern Region (formerly part of Tala Supplementary Scheme) for the period 2004-09.2.Determination of final transmission tariff for 400 kV D/C Agra-Bassi transmission line (CKT-III and II) along with associated bays under Northern Region System Strengthening Scheme-II in Northern Region for the tariff period 2004-09.3.Determination of final transmission tariff for Tala-Siliguri Transmission System in Eastern Region for period 1.10.2005 to 31.3.2009 and remaining transmission system for the period 1.5.2006 to 31.3.2009.4.Determination of final transmission tariff of 2nd 315 (3x105 MVA), 400/220 kV transformer at Indravati (OHPC) switchyard in Eastern Region for the period 1.5.2006 to 31.3.2009.Power Grid Corporation of India Limited, Gurgaon,
17-01-2008 18-01-2008

141/2007

Determination of final transmission tariff of (i) 400 kV Siliguri sub-station (extension) (relevant portion), 400 kV Purnea sub-station (extension) (relevant portion) (excluding 400/220 kV, 315 MVA ICT at Purnea sub-station), 40% Fixed Series Compensation (FSC) and 5% to 15% Thyristor Controlled Series Compensation (TCSC) on each Ckt of Purnea-Muzaffarpur 400 kV D/C line at Purnea (DOCO 1.5.2006), (ii) 400/220 kV, 315 MVA ICT at Purnea sub-station (DOCO 1.6.2006) , (iii) 400/220 kV Muzaffarpur sub-station (New) (Excluding 2no, 400 kV bays at Muzaffarpur with line reactors for Muzaffarpur Gorkhpur line and ICT-II at Muzaffapur sub-station), 220 kV Muzaffarpur sub-station (BSEB Kanti) Extension (DOCO 1.9.2006) and provisional transmission tariff of 400/220 kV, 315 MVA ICT-II at Muzaffarpur sub-station (DOCO 1.6.2007) associated with Tala HEP, East-North Inter-connector and Northern Region Transmission system from DOCO to 31.3.2009. Power Grid Corporation of India Limited, Gurgaon.
10-01-2008 16-01-2008

105/2007
68/2007

Review of the order dated 18.6.2007 in Petition No.68/2007- Direction to CTU for grant of long-term open access on the existing ER-WR corridor, i.e. 400 kV Raipur-Rourekela transmission line including 220 kV Korba Budhipadar transmission line for transfer of 400 MW power from DVC stations at Mejia and Chandrapur.Power Grid Corporation of India Ltd., Gurgaon.
13-09-2007 14-01-2008

147/2007
148/2007
in149/2007

1.Approval of final transmission tariff for 400 kV D/C Muzaffarpur-Gorkhpur transmission line in Eastern-Northern inter-connector, associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.Powerlinks Transmission Ltd., New Delhi.
2.Approval of final transmission tariff for 400 kV D/C Siliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur (BSEB) transmission line in Eastern Region associated with Tala Hydro Electric Project, East-North inter-connector and Northern Region transmission system for the period from 1.9.2006 to 31.3.2009.Powerlinks Transmission Ltd., New Delhi
3.Approval of final transmission tariff for 400 kV D/C Gorakhpur-Lucknow transmission line and 400 kV D/C Bareilly-Mandola line associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the period from 1.8.2006 to 31.3.2009 and 1.5.2006 to 31.3.2009 respectively.Powerlinks Transmission Ltd., New Delhi
10-01-2008 14-01-2008

168/2007
I.A.No. 47/2007

Approval of incentive based on availability of 400 kV D/C Silliguri-Purnea transmission line, 400 kV D/C Purnea-Muzaffarpur transmission line, 220 kV D/C Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) transmission line and 400 kV D/C Muzaffarpur-Gorkhpur transmission line (50% share), in Eastern Region associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the year 2006-07.Powerlinks Transmission Limited, New Delhi.
- 02-01-2008

169/2007
I.A. No. 48/2007

Approval of incentive based on availability of 400 kV D/C Gorkhpur- Lucknow transmission line , 400 kV D/C Bareilly-Mandola line and 400 kV D/C Muzaffarpur-Gorkhpur transmission line (50% share), associated with Tala Hydro Electric Power, East-North inter-connector and Northern Region transmission system for the year 2006-07.Powerlinks Transmission Limited, New Delhi.
- 02-01-2008

Licensing

Petition  No
Subject
Date of Hearing
Date of Order

14/2008

Application for grant of inter-State trading licence in electricity to Chhattisgarh Energy Trading Company (P) Ltd. Chhattisgarh Energy Trading Company (P) Ltd, New Delhi
15-07-2008 07-08-2008

73/2008
In
15/2008

Review of order dated 28.4.2008 dismissing the application for grant of category 'A' licence for inter-State trading in electricity made by Bala Techno synthetics Ltd. Bala Techno Industries Ltd. Kolkota
29-07-2008 01-08-2008

16/2008

Application for grant of inter-State trading licence in electricity to Indiabulls Power Generation Limited. Indiabulls Power Generation Limited, Gurgaon
22-07-2008 23-07-2008

13/2008

Application for grant of inter-State trading licence in electricity to Indiabulls Power Trading Limited. Indiabulls Power Trading Limited, Gurgaon
22-07-2008 23-07-2008

32/2008

Application for grant of transmission licence to Parbati Koldam Transmission Company Limited. Parbati Koldam Transmission Company Limited
24-06-2008 11-07-2008

28/2008

Application for grant of transmission licence for Western Region System Strengthening Scheme-II (Project-C) to Western Region Transmission (Gujarat) Pvt. Ltd. Western Region Transmission (Gujarat) Pvt. Ltd., Mumbai
08-05-2008 27-06-2008

27/2008

Application for grant of transmission licence for Western Region System Strengthening Scheme-II (Project-B) to Western Region Transmission (Maharashtra) Pvt. Ltd. Western Region Transmission (Maharashtra) Pvt. Ltd.,Mumbai
08-05-2008 27-06-2008

29/2008

Application for grant of inter-State trading licence in electricity to Adhunik Alloys & Power Limited.
13-05-2008 13-05-2008

32/2008

Application for grant of transmission licence to Parbati Koldam Transmission Company Limited. Parbati Koldam Transmission Company Limited
08-05-2008 09-05-2008

3/2008

Application for grant of inter-State trading licence in electricity to Jain Energy Limited. Jain Energy Limited, Kolkata
18-03-2008 18-03-2008

157/2007

Application for grant of transmission licence to Essar Power Transmission Company Limited. Essar Power Transmission Company Limited.
12-02-2008 29-02-2008

3/2008

Application for grant of inter-State trading licence in electricity to Jain Energy Limited. Jain Energy Limited, Kolkata
20-02-2008 20-02-2008

58/2007

Application for grant of an Inter-State Trading Licence to Maharashtra Industrial Development Corporation (MIDC).Maharashtra Industrial Development Corporation
22-01-2007 22-01-2008

124/2007

Application for grant of inter-State trading licence in electricity to Vandana Global Limited.Vandana Global Limited, Raipur
11-12-2007 21-01-2008

112/2007

Application for grant of inter-State trading licence in electricity to Indrajit Power Technology Pvt. Ltd.
Indrajit Power Technology Pvt. Ltd.,Mumbai
18-12-2007 17-01-2008

UI/RLDC

Petition  No
Subject
Date of Hearing
Date of Order

55/2008 (Suo motu)

Default in payment of Unscheduled Interchanges (UI) charges for the energy drawn in excess of the drawal schedule. MP Power Trading Corporation Limited
12-08-2008 14-08-2008

55/2008
along with I.A.
8/2008

Default in payment of Unscheduled Interchange (UI) charges for the energy drawn in excess of the schedule, MP Power Trading Company Limited, Jabalpur
31-07-2008 05-08-2008

60/2008

Petition for direction RRVPNL to pass order on concurrence as per Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations, 2008 Gujarat Flurochemicals Limited, Dist. Panchmahal (Gujarat)
26-06-2008 08-07-2008

55/2008
(Suo motu)

Default in payment of Unscheduled Interchanges (UI) charges for the energy drawn in excess of the drawal schedule. MP Power Trading Corporation Limited
- 04-07-2008

12/2008
(Suo motu)

Default in payment of Unscheduled Interchanges (UI) charges for the energy drawn in excess of the drawal schedule. Meghalaya State Electricity Board
- 04-07-2008

74/2006

Approval of charges for Unified Load Despatch and Communication Scheme in Eastern Region for the period from 1.9.2005 to 31.8.2020. Power Grid Corporation of India Limited, Gurgaon
26-06-2008 03-07-2008

87/2007

Determination of final charges for Sub-Load Despatch Centre at Modipuram under UPPCL. Power Grid Corporation of India Limited, Gurgaon
26-06-2008 03-07-2008

143/2005
147/2005

1. Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in Southern Region for the period 1.4.2004 to 30.6.2017 and additional capitalization after date of commercial operation during 2002-03 to 2004-05.
2. Approval of tariff for Unified Load Despatch and Communication (ULDC) Scheme in North Eastern Region for the period 1.4.2004 to 30.6.2018 and additional capitalization after date of commercial operation during 2003-04 to 2004-05. Power Grid Corporation of India Ltd.
10-06-2008 18-06-2008

33/2008

Petition for permission to notionally inject the electricity generated by wind power projects into Northern Regional grid as unscheduled interchange. Gujarat Fluorochemicals Limited, Ranjit Nagar
- 19-03-2008

04/2008

Petition for permission to notionally inject the electricity generated by Petitioner's power plant into the Southern Regional grid as unscheduled interchange. Global Energy Limited, Mumbai
21-02-08 22-02-2008

117/2007

Directions to the NR constituents to honour the power transfer limits and curb the overdrawals from the grid so that the entire NEW electricity grid is secure.Northern Regional Load Despatch Centre, New Delhi
- 15-02-2008

10/2008

Open Access for inter-State transmission of power generated by Nava Bharat Ventures Ltd through M/s. Reliance Energy Trading Ltd, to the distribution utilities in Andhra Pradesh.Nava Bharat Ventrues Ltd, Hyderabad
- 30-01-2008

General

Petition  No
Subject
Date of Hearing
Date of Order

77/2008
I.A.
7/2008

Approval of incentive based on availability of transmission system of North Eastern Region for the year 2007-08. Power Grid Corporation of India Limited, Gurgaon
- 09-07-2008

50/2008

Miscellaneous petition to order to refund the excess tariff collected on the capitalization of outstanding liability not materialized and consequent withdrawal of such excess capitalization in respect of Ramagundam Super Thermal Power Station, Stage I & II (2100 MW) and other NTPC stations during the tariff period 2001-04. Tamil Nadu Electricity Board
24-06-2008 25-06-2008

33/2008

Petition for permission to notionally inject the electricity generated by wind power projects into Northern Regional grid as unscheduled interchange. Gujarat Fluorochemicals Limited, Ranjit Nagar, Gujarat
24-04-2008 17-06-2008

64/2008
67/2008

1. Fixation of and adjudication on the transmission charges of Gujarat transmission system used for transmission of the power from the State of Gujarat to Union Territory of Diu and Daman under Sections 62 and 79 of the Electricity Act 2003
2. Fixation of and adjudication on the transmission charges of Gujarat transmission system used for transmission of the power from the State of Gujarat to Union Territory of Dadra and Nagar Haveli under Sections 62 and 79 of the Electricity Act, 2003. Gujatat Energy Transmission Corporation Ltd., Vadodra
27-05-2008 04-06-2008

68/2008

Petition for apportionment of UCPTT rate of 35 Paise per kWh of North Eastern Region for the period 1.2.2000 to 31.3.2007 in view of the Judgment dated 4.1.2008 in Appeal No. 98 of 2007 of the Appellate Tribunal for Electricity. Power Grid Corporation of India Ltd., Gurgaon
22-05-2008 04-06-2008

41/2008

Petition for sale of power in to the Western Regional grid as unscheduled interchange. Jindal Power Ltd, New Delhi
27-05-2008 27-05-2008

107/2007

Petition for direction to U.P Power Corporation Ltd (UPPCL) for payment of compensation amount to M.P Power Trading Co. Ltd (MPTRADECO) due to retention of MP's share of power/non-supply of it from Rihand and Matatila Hydel Power Stations to MPSEB and resumption of MP's share of power from Rihand and Matatila Hydel Power Stations. Madhya Pradesh Power Trading Company Ltd., Jabalpur.
13-05-2008 16-05-2008

119/2006

Petition for in principle` acceptance of the project capital cost of project and financing plan of 1040 MW (gross) power project being set up by the Navabharat Power Private Ltd. in Orissa. Navabharat Power Private Ltd, Orissa
13-05-2008 15-05-2008

19/2008

Adjudication of dispute on account of non-payment of long outstanding dues and non-refund of Earnest Money Deposit by ASEB arising out of trading operation of electricity. Adani Enterprises Ltd., Gurgaon
18-03-2008 13-05-2008

46/2008

Review of the order dated 22.9.2006 in Petition No. 149/2004 pertaining to determination of generation tariff in respect of Simhadri TPS, (1000 MW) for the period 1.4.2004 to 31.3.2009-Re-determination of the FERV component of Rs. 142.95 crore for the year 2003-04 claimed by NTPC (Simhadri TPS) from AP Discoms Transmission Corporation of Andhra Pradesh Ltd., Hyderabad & Others.
13-05-2008 13-05-2008

10/2000

Petition for fixation of wheeling charges. Madhya Pradesh State Electricity Board, Jabalpur
08-05-2008 08-05-2008

143/2006

Petition under Section 79(1) (f) of the Electricity Act, 2003. Indraprastha Power Generation Company Limited
08-05-2008 08-05-2008

58/2008 (Suo motu)

Clarity regarding control areas and demarcation of scheduling responsibility between RLDCs and SLDCs
- 07-05-2008

41/2008

Petition for sale of power in to the Western Regional grid as unscheduled interchange (UI). Jindal Power Ltd, New Delhi
- 24-04-2008

107/2007

Petition for direction to U.P Power Corporation Ltd (UPPCL) for payment of compensation amount to M.P Power Trading Co. Ltd (MPTRADECO) due to retention of MP's share of power/non-supply of it from Rihand and Matatila Hydel Power Stations to MPSEB and resumption of MP's share of power from Rihand and Matatila Hydel Power Stations. Madhya Pradesh Power Trading Company Ltd., Jabalpur
03-04-2008 03-04-2008

10/2000

Petition for fixation of wheeling charges. Madhya Pradesh Electricity Board, Jabalpur
11-03-2008 13-03-2008

11/2008 (Suo Motu)

Contravention of Commission's order dated 31.12.2007 in Petition No. 156/2007 arising out of non-approval of open access by Southern Regional Load Despatch Centre (SRLDC) on the ground of non-receipt of consent from SLDC-OPTCL.
28-02-2008 28-02-2008

107/2007

Petition for direction to U.P Power Corporation Ltd (UPPCL) for payment of compensation amount to M.P Power Trading Co. Ltd (MPTRADECO) due to retention of MP's share of power/non-supply of it from Rihand and Matatila Hydel Power Stations to MPSEB and resumption of MP's share of power from Rihand and Matatila Hydel Power Stations. Madhya Pradesh Power Trading Company Ltd.
22-01-2008 27-02-2008

24/2007

Refusal No 131 of 25.1.2007 by the Western Regional Load Despatch Centre of the open access application filed by Tata Power Trading Company Limited for transmission of 27 MW power through Eastern Regional Load Despatch Centre and Orissa State Load Despatch Centre from Nava Bharat Ventures Ltd, on the ground of "No consent from OPTCL". 1. Nava Bharat Ventures Ltd, Hyderabad 2. Tata Power Trading Company Ltd, Mumbai
12-02-2008 13-02-2008

16/2006
IN
152/2007
153/2007

1.Dispute relating to apportionment of capacity charges of three NTPC Stations among the beneficiaries for the month of October 1998.2.An application challenging the energy bill of GRIDCO for the period November 1998 in respect of drawal of NTPC power during off-peak hours.3.An application challenging the energy bill of GRIDCO for the period November 1998 in respect of drawal of NTPC power during off-peak hours.Grid Corporation of Orissa Ltd., Bhubaneswar.M/s Ferro Alloys Corporation Ltd….M/s Tata Steel Ltd
29-01-2008 30-01-2008

143/2006

Petition under Section 79(1) (f) of the Electricity Act, 2003.Indraprastha Power Generation Company Limited.Haryana Vidyut Prasaran Nigam Limited, Panchkula.
29-01-2008 29-01-2008

-

Detailed Procedure For Bilateral Transactions and Related Matters-Open Access Regulations,2008.
- 31-01-2008

4/2008

Petition for permission to notionally inject the electricity generated by power plant into Southern Regional grid as unscheduled interchange.Global Energy Limited, Mumbai.
- 14-01-2008