GRID CODE ORDER
|
|
|
ORDER* ( Heard on 20th, 21st and 23rd July, 1999 ) A.R. RAMANATHAN,
MEMBER: 1. PRELIMINARY The Central Electricity Regulatory Commission (hereinafter called the Commission) issued on 31.3.1999 certain directions to the Central Transmission Utility (CTU). In April 1999, Powergrid Corporation of India Ltd. (Powergrid) in its capacity as the CTU submitted a Draft Indian Electricity Grid Code (IEGC) in compliance of the directions of the Commission, laying down an operating code specifying the policy and procedures to be followed by various participants (agencies) in the Inter-State Transmission System (ISTS). 1.2 As per the directives, the CTU, having jurisdiction for supervision and control over the Inter State Transmission System, was to submit a draft IEGC not later than 7th April, 1999 for approval. Though there was no formal petition, this submission has been considered as a petition in accordance with the provisions of Regulations 24, 25 and 26 of the Commission’s Conduct of Business Regulations (CBR). Accordingly, the Commission designated Powergrid as a Petitioner in this case to present the matter before the Commission. After the submission of the Draft, on 11th June, 99 Powergrid submitted an application proposing certain charges for reactive energy to be considered by the Commission along with the draft IEGC. This application was admitted by the Commission the same day and it was decided to hear the same along with draft IEGC. 1.3 The Commission directed CTU to issue a public notice announcing the submission of the draft IEGC, inviting all interested persons to file objections, if any. Simultaneously, the Commission also directed CTU to send copies of the draft along with a copy of the application for approval of reactive energy charges, to all the present participants in the ISTS, so that they could file their objections if any within the time limits prescribed by the Commission. Replies were to be submitted by all parties concerned in conformity with the relevant provisions of Conduct of Business Regulations (CBR). CTU was also directed to file its Rejoinder to the replies within the prescribed time. The hearing on this petition was fixed for 20th, 21st and 23rd July, 1999, for which notices were duly sent to all parties concerned. At the time of hearing, it was noted that replies have been received from 34 parties in respect of IEGC, and 15 parties in respect of reactive energy charges, which were all dealt with by CTU in its Rejoinder filed on 19th July, 1999. The written pleadings having been completed, the matter was taken up for hearing as per the schedule referred to above. At the hearing, parties referred to as per the list contained herein were represented and made their submissions as per their pleadings. At the request of some of the Respondents, further opportunity was given to make written submissions by 5th August, 1999 and CTU was also given the opportunity to respond to these written submissions. At the end of the hearing, the Commission directed CTU that in the written submissions it should categorically specify reasons where objections/suggestions from Respondents have not been accepted, whether partly or fully. CTU was also directed to file a revised draft of the IEGC within two weeks after 5th August, 1999 i.e. by 19th August, 1999. The present order therefore covers all the written submissions and oral submissions of parties along with the final draft IEGC which was submitted by CTU on 30th August, 1999. The delay in submission was condoned by the Commission based on an application for condonation of delay. 1.4 Before dealing with the draft IEGC, it is necessary for the purpose of record to state that: (a) since the directives dated 31.3.1999 were also circulated along with the Draft IEGC, certain comments were received from few respondents on the directives as well. Some respondents have also stated that CTU has not solicited objections from interested parties before submitting the draft IEGC, as per the directive of the Commission. CTU in its reply has submitted that, considering the number of Utilities in India, it would be able to interact with only one representative from every State and it would be the responsibility of this representative to interact with all concerned parties in the State. Though this is a proposal, the fact remains that in the preparation of the present draft, CTU had not been able to interact with even one agency from each State. However, taking into account the strict time schedule and the fact that opportunity was provided by the Commission to all concerned to react, the complaint of not soliciting objections from interested parties is of little consequence. In any case, on the compliance or non-compliance if any of the directives, the Commission would itself be seized of the matter as we go along and this matter need not be dealt with by us in the present order, so long as such matters do not relate to the draft IEGC. In other words, we shall confine ourselves to the draft IEGC per se. (b) Shri R.N. Srivastava, Ex.Officio Member of the Commission did not associate himself with these proceedings on the ground that the Central Electricity Authority (CEA) of which he is the Chairman has offered comments/objections on the draft IEGC. We should at the outset, make it clear that the IEGC in the final form as approved by the Commission, shall be construed as a document of the CTU. Hence, it should ensure that adequate care is taken to make the Code practical and implementable. This aspect has also been confirmed by CTU in its letter dated 9th April, 1999 while enclosing a copy of the Draft IEGC. *All abbreviations used in this order are as per the Draft IEGC. |
|
|
2. GENERAL – CHAPTER 1 OF DRAFT Chapter 1 of the Draft serves as a Preface to IEGC. This Chapter consist of five sub-paras viz., 1.1: Introduction; 1.2: Objective; 1.3: Scope; 1.4: Structure of the IEGC; 1.5: Glossary & Definitions. 2.1 With particular reference to the contents of this Chapter, certain replies are relevant viz.,(a) CEA has suggested the exclusion of the Planning Code from IEGC and instead suggested a separate Code indicating clearly the role of CEA in Transmission Planning; (b) UPSEB and certain others have suggested the deletion of transmission licensing from IEGC and instead to issue it as to make it a separate regulation; (c) There has also been a suggestion for expansion of all abbreviations as well as for shortening of some of the definitions; (d) a large number of amendments to the definitions have been suggested. CEA has suggested the deletion of the Chapter on the Planning Code. Reasoning of CEA for this suggestion and reaction of CTU as well as our conclusions on this issue are being dealt with in the Chapter on Planning Code and hence are not being dealt with in detail here. 2.2 As regards the proposal for deletion of the Chapter on Transmission Licensing the reply of CTU is that this Chapter has been included in compliance of the Directive dated 31.3.99. A reference to the directives shows that the Commission did direct the inclusion of the following in the IEGC:
Keeping in view the urgent need for huge investment in transmission, and the need to mobilise private and public resources, it is necessary to examine in depth the licensing policy and procedures so that private investment in transmission is effectively and expeditiously introduced. It has been argued by some respondents that CTU as a commercial enterprise already engaged in the business of transmission may have its own interest in putting forward the draft proposals on the procedures for licensing. In some countries the functions of load despatch, transmission operation and investment approvals, are separated. Private investment applications have to be examined in the right perspective. On a scrutiny of the replies to the Chapter on Licensing, we find that adequate attention has not been given by the respondents to the contents of the draft. This is probably because of the lack of exposure of the respondents, or their lack of interest in this area. At the same time, the Commission, on its own, pursued with the CTU the policy and procedures right from the stage of conception of the project for investment, till the choice of the private party, and issue of the license. Though CTU had submitted an initial paper on the procedures, the Commission found the same to be perfunctory, and hence called for more detailed break up of the procedures. Since this process is taking a longer time to finalise, we consider it appropriate to postpone the inclusion of this Chapter in the IEGC for the present. We are, however, of the view that in the ultimate analysis, the whole process of transmission investment along with the details of the Terms of the Transmission Service Agreement (TSA) and other procedures, has to be a transparent one and will have to constitute a part of the IEGC, which is a public document. The Commission will make all endeavours to get the CTU to submit the procedures expeditiously to the Commission so that they can be notified separately. Pending the finalisation of the entire procedure with regard to licensing, keeping in view the objective of promoting private and public investment in the transmission sector, we direct that CTU shall invest on new lines by adopting a transparent process. Accordingly, CTU shall make a public announcement of its intentions to make investment on any new lines, setting out in full the details of such investment including the cost, time and the task involved. The announcement shall be made atleast in two national dailies. It shall also allow atleast a month’s time for objections/alternative proposals to be submitted to it. In case any objections/alternative proposals are received within the prescribed time, the same shall be submitted to the Commission for consideration and final disposal before taking up the new investment. This arrangement shall be in force till a new chapter on transmission licensing is incorporated or announced separately by the Commission. 2.3 Regarding the modification of the definitions and expansion of abbreviations, which are contained in Chapter 1 under the heading `Glossary and Definitions’, we find that CTU has dealt with all these suggestions appropriately in the revised draft. Further in our view the purpose and objective of the Glossary and Definitions is only to make the Code self explanatory and not bind parties based merely on definitions. We also do not find any of the definitions being used in an extra-ordinary sense. Still keeping in view the various suggestions and the amendments carried out by CTU, we direct that the following definitions be reconsidered:
In addition to the above, commonly used terms like Active Power, Reactive Power, Reactive Energy Charge and State to be deleted from the list. With the above observations and directions, Chapter 1 of the revised Grid Code stands approved. |
|
|
ORGANISATIONAL ISSUES - CHAPTER 2 OF THE DRAFT A crucial issue to be
addressed with regard to the smooth integrated grid operation at each region
is the existence of a clear cut organisational set up with duties and
responsibilities neatly delineated. The draft grid code in Chapter 2 has set
for itself the basic task of defining the roles of the concerned
organisations and their linkages so as to facilitate smooth operation of
regional grids and the national grid. Chapter 2 defines the functions of the organisations
whereas the linkages have to be found in Chapters 6 and 7 of the Draft. 3.2 In order to appreciate the above said provisions, it is necessary to set out the organisational arrangements as contemplated by law before and after the Electricity Laws Amendment Act, 1998. In the pre 1998 situation, though both REB and RLDC were on the scene, there was no CTU in existence. The Electricity (Supply) Act of 1948 defined REB under section (2) 9A as "Regional Electricity Board means any of the Boards as constituted immediately before the commencement of the Electricity Laws (Amendment) Act, 1991 by a resolution of the Central Government for ensuring integrated operation of the constituent system in the region." The above definition has to be contrasted with the revised definition as per the Amendment Act of 1998 which reads as follows: "Regional Electricity Board means a Board constituted by a resolution of the Central Government for a specified region for facilitating the integrated operation of the power system in that region." 3.3 The above change in the perception of law with regard to REBs has to be read in the context of further changes in the legal provisions with regard to the role of RLDCs in the integrated operation of the power system. The pre 1998 definition of RLDC as contained in section 2 (9-B) of the Electricity Supply Act of 1948 read as follows: "Regional Load Despatch Centre means the Centre so designated where the operation of each of the Regional Electricity Grid constituting the country’s power system is coordinated." The 1998 Amendment redefines it as follows: "Regional Load Despatch Centre means the Centre so designated for a specified region where the operation of the power system in that region and the integration of the power system with other regions and areas (within the territory of India or outside) are coordinated." Thus the only substantial change is that the scope of co-ordination is extended to interaction outside the Region and the Country. 3.4 Though the description of RLDC has practically remained the same, the status and functions of RLDC in ensuring (which indicates the shifting of onus from REB to RLDC) integrated grid operations have been changed by the Amendment Act. Prior to the amendment, Section 55 of the Electricity (Supply) Act, 1948 contained the following:
3.5 The above Section was totally revamped by the 1998 Amendment Act to provide as follows: (i) The Central Transmission Utility shall
operate the Regional Load Despatch Centres. 3.6 In the background of the legal provisions amended as above by the 1998 Amendment Act, the replies of various respondents who appeared before us during the hearings on the Grid Code and made specific observations relating to the role of REB and RLDCs in the operation of the power system at the regional level have to be considered. The general tenor of submissions made by respondents is that since RLDC is operated by the CTU viz., Powergrid and since the latter has a commercial interest in as much as it is engaged in the business of transmitting power against charges, RLDC or CTU cannot be neutral in the operation of the power system. There is need for a neutral authority to control and give directions for the smooth operation of the integrated power system at the regional level. The above views were also aired during the hearings. These views can be broadly summarised in a nutshell:
3.7 The above views have come from the following Respondents:
3.8 During the hearing, some of the respondents in particular, NTPC argued that since RLDC is obliged to enforce the decision of REB as per Section 55(8) of the Electricity (Supply) Act, 1948 the load despatch centre has no other option. This argument, however, does not hold good in as much as sub-section (7) & (8) contemplate mutually agreed decisions and enforcement of such decisions (see the words in sub-section (8) "shall enforce the decision". Hence RLDCs obligation to enforce any decision of REB can only be confined to mutually agreed decisions. Again, to phrase "mutually agreed decisions" makes it abundantly clear that if there is any decision per se but not a mutually agreed one, such a decision is not contemplated in sub-section (7). Hence a mutually agreed decision has to be necessarily a unanimous decision. |
|
|
3.9 Another difficulty in accepting the above arguments is the presence of the phrase "subject to the above provisions of this section" in sub-section (7), which makes the provisions of sub-section 7 conditional upon the provisions of sub-sections (1) to (6). Sub-sections (1) to (6) provide for the status and powers and duties of the RLDC. In other words, the mutually agreed decisions of REBs as contemplated in such-section (7), are subject to, or in other words subordinate to, the status and powers of RLDC. The mutually agreed decisions of REB should be strictly speaking, without prejudice to the status and powers of RLDC as contemplated in sub-sections (1) to (6). This casts a responsibility on REBs to bring about mutually agreed decisions since sub-section (7) of section 55 is subject to sub-sections 1 to 6 without in any way prejudicing the status and powers of the RLDC. Hence, caution has to be exercised while the REB makes mutually agreed decisions. So long as the decisions under sub-section (7) have satisfied the condition for such decisions as set out in that sub-section, the RLDC is obliged to enforce the decisions of REB. 3.10 The Central Electricity Authority, in its reply, has observed that the roles of various organisations in the draft are not quite in line with the provisions of Indian Electricity Act and the Electricity (Supply) Act. The functions of REBs are an important interface between the SEBs, STUs, RLDC and these have not been reflected correctly and some of the functions of REBs have been proposed for being carried out by CTU/RLDC. CEA has also pointed out that REB has to do operational planning and coordination with the sub-Committees of the REB. The decisions taken by REB, TCC and its sub-Committees have to be enforced by RLDC. Similarly, preparation of regional energy accounts has to be within the domain of REB. As regards the role of CEA it has also been pointed out that it is a nodal agency for overall planning of the transmission grid of India including inter-State transmission system. It is also stated that CEA has full role in advising the SEB generating companies and other agencies in improving the operation and control of the power system. It is further pointed out by CEA that the scope of CTU as per the draft has been extended to the entire grid, which is beyond its jurisdiction, and it has to be limited to the operation of inter-State transmission system only. 3.11 We have carefully considered changes brought about in law by the Amendment Act of 1998, submissions made by various respondents, the role played so far by organisations like Regional Electricity Boards, Regional Load Despatch Centre and the Central Electricity Authority. On a consideration of the legal provisions and the submission made by Respondents, the following conclusions with regard to the legal provisions are inevitable:
3.12 The above conclusions have been arrived at on a comprehensive reading of the relevant legal provisions, which is essential in order to interpret the meaning and purpose of the amendment. Any reading of the provisions in disjointed fashion can only lead to compartmental interpretations, which is bound to miss the message conveyed by the amendments. The rule that a statute must be read as a whole is now firmly established. This rule is referred to as a "elementary rule" and "compelling rule" by English courts. This has also been described as a "settled rule" by the Supreme Court in various judgements. 3.13 While recognising the intent and purpose of the law as amended, in the discharge of our responsibilities to regulate the inter-State transmission of Power, we have also to see whether the grid code has contemplated a workable organisational set up for the smooth functioning of system. It is no doubt true that there are a number of players in the power system viz., the generation utilities, the transmission agency, transmission licensees, licensees under the 1910 Act, the Electricity Boards and other persons connected with the operation of the system. The operation does involve a host of functions like –
3.14 While analysing the above functions, it is evident that some of them do constitute an integral part of the operations and has been contemplated as the exclusive role of the RLDC. These functions are –
As regards other functions, which go to facilitate the smooth operation of the system like planning of outages/lines, systems status, coordination of protection system, energy accounting, exploring possibilities of inter-State/Regional transfers etc., these are all functions which go to facilitate the operation of the system. Viewed from the revised definition of REB functions, as per the Amendment Act, the above functions, which go to facilitate smooth operation of the system can and should be assigned to the REBs. This conclusion is in line with the submission of CEA. 3.15 While the above demarcation of the functions between REB and RLDC has been considered appropriate, we are convinced that the two entities viz., REB and RLDC cannot function in exclusive compartments. As has been established in practice so far, the REB and RLDC have been functioning together in a coordinated manner with the objective of smooth functioning of the system. In fact, the two are located in the same premises to facilitate close interaction and coordinated functioning. We are therefore convinced that in future as well, within the framework of the legal provisions the two entities have to function in coordination with each other and in unison, in order to achieve the objectives. 3.16 With the above delineation of functions, all concerned including the CEA should take cognizance of the changed legal provisions and act accordingly. The CTU and RLDCs should be allowed to play the role assigned to them and accept responsibility as per Law. The constructive role played by CEA in operation of ISTS is vested now on the CTU through statutory amendments. Similarly the role of REBs has also been redefined. All concerned should take note and act accordingly. 3.17 We have given our anxious consideration to the apprehensions of the constituents of the regional grids about the neutrality of RLDC, which is to function under CTU. Earlier RLDC was within the fold of the REB since as per law ensuring integrated operation of the grid was of the REB and now is under the CTU, which is, itself engaged in the commercial activity of transmission of power. It is difficult for us to state whether these apprehensions are well founded or not since there is no past experience of this kind of arrangement. We however, consider that any arrangement should be in conformity with the law and should not only be foolproof but should also appear to be so. Since there is a logic in the apprehensions expressed by the various constituents, we consider it appropriate to put in the IEGC a system within the provisions of law which shall be above board and reasonably acceptable to the constituents. It is not a workable proposition for the Commission to interfere on a continuous basis and monitor the working of RLDCs. Commission also recognises that the REB has a key role in the operation of ISTS but at the same time because of its size cannot be a monitoring group. Keeping in mind the subordinate role under REB played by RLDC in the past, we also consider it essential that the RLDC should now be manned by senior functionaries in order to enable it to discharge the independent responsibility shouldered by it. It is also our conviction that the CTU operations and the RLDCs should be under the charge of an independent full time Director of Powergrid so that it can be seen separately within Powergrid. Such Director shall have under him two senior level officers one incharge of CTU functions and the other in over all charge of all the RLDCs in order to view RLDCs separately. Each RLDC shall be manned by a person of the same status as that of a Member-Secretary of Regional Electricity Board who shall be able to inter act with the chief functionary of the REB on equal footing. With the above status of the chief functionary of the CTU and RLDCs we also consider it appropriate that there shall be a Monitoring Committee at the CTU level covering all the 5 RLDCs. The functions of this Committee shall include periodic monitoring of the functions of RLDCs and review of RLDCs directions and their compliance/non-compliance by the agencies. The Committee shall consist of the following members:
The Chairman, Powergrid shall chair the Committee. Director (Operation), Powergrid shall be the Secretary of the Committee. The Members shall attend the meeting personally and no proxies shall be allowed. The quorum for the meeting shall be 5 members. The Committee shall meet at least thrice in a year. The Committee shall function in a transparent manner with Agenda and Minutes to be maintained on a regular basis. The Committee shall draw up its own Agenda of work keeping in view the special features of operations in the concerned region. A qualified auditor shall independently audit the accounts of all RLDCs, which shall be considered as a branch audit for the purposes of Powergrid’s main audit. The auditor’s report shall be made available simultaneously to the Commission and to the Monitoring Committee. There are valid justifications for the above conclusions with regard to the organisational arrangement, which we propose to place in position. A major justification as already stated is that many respondents have questioned the neutral functioning of the CTU in the context of it also being in the business of transmission. In many countries, the arrangement has been that the CTU functions of system operation incorporating those of RLDCs and REBs are performed by a non profit Independent System Operator (ISO). Our present legal frame work does not provide for this. It is therefore necessary to make the RLDCs, which are under the control of the CTU accountable to a collective forum. This is essential as it is observed from the past that no organisation was responsible or accountable for the smooth functioning of the ISTS. Moreover, the monitoring group should comprise of the CTU, which is operating the RLDCs. Considering all the above, it is appropriate to have representatives of the REB and the central generating companies. In addition, in order to generate authentic data for formulating the RLDCs charges, we have put in a position a system of submission of audited accounts to the Monitoring Committee. 3.18 Chapter II of the Draft has been used to define the role of various agencies in the context of regulation and operation of the Inter-State Transmission System. While discussing the Draft at the hearing, many Respondents pointed out the inadequate/inappropriate description and role of various organisations. In view of the comments received from various parties, CTU revised the definitions and reproduced the relevant legal provisions with regard to those organisations. On detailed consideration, we are of the view that in the operation of inter-State transmission system, it is not relevant to set out elaborately the role of the CEA as contained in the Electricity Supply Act, 1948, particularly in view of the changed legal provisions which contemplate specific roles on the operational side only to the RLDC, REB and the CTU. Hence the detailed description and the role of CEA in the Grid Code has no relevance. Similarly, as regards STUS, they have a very limited role in the operation of the ISTS and as such it is unnecessary to set out their role in the intra-State system in the Grid Code which deals with ISTS. As such, it is directed that paras 2.5, 2.8 and 2.9 be deleted. As regards the role of
the CERC the provisions contained in the ERC Act and the Electricity Laws
Amendment Act apply irrespective of whether the same are incorporated or not
in the IEGC. Hence it is unnecessary to repeat the same provisions. As such
we direct that para 2.6 be also deleted. The same analogy
applies as regards para 2.10 that sections 55(3) and 55(4) of the Electricity
(Supply) Act as amended already govern role of licensees etc. Hence they need
not be reproduced. Para 2.10 is also required to be deleted. In the light of the above, conclusions, we direct Powergrid to:
With the above directions, Chapter 2 of the Draft is approved. |
|
|
PLANNING CODE – CHAPTER 3 OF THE DRAFT The Central Electricity Authority in its reply to the petition has questioned the need for including a Chapter on the planning code for Inter-State transmission. It suggested that this Chapter may be excluded from the Grid Code, and a separate code for transmission system planning be brought out which, as per the provisions of the Electricity (Supply) Act, 1948, would be the responsibility of CEA. In its Rejoinder, CTU has justified the Chapter on Planning Code on the ground that it is as per the Commission dated 31.3.1999 and that CEA’s observation for exclusion of this Chapter is not in accordance with the directives. 4.2 We have considered the reply and the Rejoinder on this issue. A reference to directive No. 3(i) of CERC’s directives dated 31.3.1999 shows that there was a direction to include in IEGC the following: "The ISTS planning procedure and information exchange system necessary to identify and promote the requirements of the re-enforcement or extension of ISTS." The implication of the above directive is to spell out in the Code the planning "procedures" as opposed to the planning "policy" with regard to ISTS planning in order to identify and promote the requirements of re-inforcement or extension of the system. In this connection, CEA has drawn the attention of the Commission to section 3(1) of the Electricity (Supply) Act, 1948 to state that it has the jurisdiction to: (a) formulate short term and perspective plans; and (b) advise on operation and maintenance of power systems. CEA has also by implication pointed out that a separate code for transmission system may be brought out under the provisions of the Electricity (Supply) Act, 1948. It also raised the issue of jurisdiction of the Commission under section 13(c) of the ERC Act with regard to the direction for planning. According to it, the Commission’s jurisdiction is confined to regulating the inter-State transmission of energy and does not extend to the power system as a whole. It is further pointed out that the role advising the SEB, generating company or other agency in improving the operation or control of the power system, continues to be with CEA.
4.4 It is also to be noted that under section 27A of the Electricity Act, 1910 as amended in 1998, all function of planning and coordination as well as overall supervision and control relating to inter-State transmission has been squarely vested in the CTU, whereas CEA has not been vested with the power to supervise and control the inter-State transmission. No doubt Section 3(1)(ii) of the ES Act, 1948 does contemplate functions and duties relating to development of a national power policy and formulation of short term and perspective plans. However, by the 1998 Amendment of Indian Electricity Act, the function of planning and control of ISTS is conferred on the CTU. As a matter of rule, on any issue where there is a conflict of jurisdiction, a subsequent unambiguous legislation prevails over a prior legislation. On this principle also, section 27A of the Indian Electricity Act, 1910 as amended, having vested the jurisdiction with the CTU to discharge all functions of planning and coordination as regards ISTS, has to be given its due weightage. The role of the Commission in regulating, and of the CTU in planning supervision and control of ISTS is therefore established beyond doubt particularly in view of the overriding effect of the ERC Act over any other enactment. The attempt should be to synchronise the functions of both CEA and CTU particularly in view of the expertise and experience of CEA. 4.5 On a closer scrutiny of the contents of the draft planning code, we find that the planning policy contents do not in any way deny the role and prerogative of CEA with regard to Perspective Plans for the inter-State transmission system. It is also found that the provisions contained in the draft do stipulate that any planning by CTU should be in conformity with the Perspective Plan and the planning criteria and guidelines issued by the CEA. Thus it is evident that the prerogative of planning including the criteria and guidelines of CEA would still prevail even under the grid code as proposed. 4.6 We do recognise that CEA is the only organisation which has the expertise and experience in this sector. CEA’s Planning in the past has been the guiding factor for developments in the power sector. Powergrid has been actually engaged in the development of transmission facilities for nearly a decade. In our view it would be ideal if CEA can play a pioneering role in laying down the policies and evolve Plans both on long term and short term basis. It shall be the responsibility of CTU to revalidate on an annual basis the studies in the short term of 5 years by incorporating realistic assessment of generation addition, load growth and delay if any in actual execution of transmission lines etc. The draft Code should and does aim at these complementary roles for CEA and CTU. In view of the above, read with para 3.5(a) of IEGC `CEA’ shall be deleted from para 3.3 of the Draft. 4.7 Some other respondents, particularly WBSEB, have suggested a role for REB in planning and formulation of Annual Plans by CEA. These have been rightly refuted by the CTU in view of the provisions of Section 27A(2)(b) of Indian Electricity Act, 1910 as amended in 1998, which vests the CTU with this function. Planning as per the Code, however, will be a consultative process with all concerned including CEA and REBs. This consultative process which is contemplated under the new section 27A(2) is reflected in clause 3.4(d) of the Draft Grid Code which is in order. MPEB’s suggestion of the concept of `Rolling Plan’ has been accepted by CTU as is evident from 3.4(b), though the term has not been specifically used. Some objections challenging the powers of CTU for calling information for the annual planning as in 3.4(d) have been rightly rejected by CTU as they have been raised without appreciating the amendments in the IE Act. 4.8 Respondents have also objected
to the reference to the Intra-State system in the Draft Code. CTU has not
conceded on this point on the plea that the planning of Inter and Intra State
system cannot be delinked. We are not in full agreement with CTU since its
jurisdiction cannot extend to the intra state systems, for which STUs are
contemplated. However, in view of the definition of inter State transmission
as found in the law, some of the lines of the intra state system would fall
within the definition of the inter State system. All the same, specific
reference to intra state system, per se, needs to be deleted. It is no doubt
true and appropriate that such part of intra State system which constitute a
part of inter state transmission system should fall within the jurisdiction
of the CTU. Accordingly, the Grid Code shall be suitably modified by CTU by
deleting specific references to intra state system per se except where the
intrastate system specifically constitutes a part of the ISTS. 4.9 Both TNEB and WBSEB have made
certain suggestions under clause 3.4(h) which go to restrain the CTU in its
functioning as a dynamic planner of ISTS, which role has been squarely
conferred on it by section 27(A)(2)(b) of the Indian Electricity Act as
amended in 1998. Similarly, DVC has suggested to substitute clause 3.4(i) to
say that each State utility should be free to carry out its own planning.
Though doing their own planning is essential, such planning has to be
dovetailed with the plans made by CTU. WBSEB has stated that CTU should
formulate its plans based on the plans by STU. In the rejoinder, it has been
rightly stated that the CTU’s plans are in accordance with the long term
plans of CEA, and coordinated with the plans of ISTS, and hence, the plans of
STUs have to fall in line with the above. We agree with this contention of
the CTU and hence no amendments are needed in this regard. 4.10 TNEB has proposed that in
clause 3.5(b) which states that the ISTS shall be capable of withstanding the
last of the most severe single system infeed transmission or generation, the
responsibility has to be precisely defined. We do not consider the necessity
of defining this in the Code. However, on any complaint, the Commission has
the jurisdiction to fix the responsibility in any eventuality. 4.11 Nuclear Power Corporation has proposed that as regards 3.6 (b)(iii) the standard formats for submission of data for planning should be got approved from the Review Panel. This has not been accepted by CTU. We uphold the contention of CTU in as much as the review panel has a specific task of review of IEGC, which should not be extended. However, it may be open to Commission to seek the views of the review panel, if considered necessary. 4.12 In general, regarding the
planning code, NTPC has proposed that provision be made for Central
Generating Stations building up the transmission system to its direct
consumers if the same are not available/envisaged in the ISTS. This
suggestion has not been accepted by CTU on the plea that though building of
transmission lines is not banned, any such line shall normally require an
approval in the Standing Committee of CEA and would normally be
constructed/got constructed by CTU. In view of CTU accepting such a
possibility and in view of the lack of clarity in the rejoinder as to how
such situation has to be dealt with, we consider it appropriate to make
suitable provision in the IEGC itself. Accordingly, we direct CTU to suitably
modify the IEGC. In the final analysis the Draft submitted by CTU as regards Planning Code is approved subject to the modifications as contained in para (4.8) and (4.12) above. |
|
|
CONNECTION CONDITIONS – CHAPTER 4 OF
THE DRAFT There has been no comment from any of the Respondents on the "introduction" part of this Chapter and as such this part would remain as per the draft submitted by CTU. 5.2 The objectives of the connection conditions have also not been commented upon by any of the Respondents excepting NTPC, which proposed the inclusion of one more objective viz., that the connection conditions are designed "to ensure that the entire power from CGS is evacuated to the beneficiaries as a first priority". The justification given for this amendment is that ISTS has been primarily envisaged and set up for the combined benefit of central sector generation and regional constituents. In the reply, CTU had originally stated that the Indian Electricity Act, 1910 does not provide for any priority in respect of the evacuation of the generation of any generating station on the ISTS and hence the suggestion was not acceptable. In the final rejoinder, however, CTU has modified the reply to state that the proposal of NTPC to give first priority for evacuation of CGS power is already covered in Clauses 7.4.9 and 7.4.10. However, a reference to the above referred two sub-clauses shows that they do not contemplate any priority for evacuation of CGS power on a permanent assured basis. These clauses talk of the authority of RLDC to direct SLDCs/ISGCs to increase/decrease their drawal/generation in case of contingencies. They also talk of cooperation of all constituents in case of outages of generation and transmission system for best optimisation. Thus, no amendment based on NTPC’s suggestion has been made. Irrespective of the reasons adduced by CTU, we are convinced that in accordance with the policy of liberalisation launched since 1991 and the consequent need to aim for open access for transmission, it can no longer be the prerogative of any particular generator to get priority in evacuation of its power. In fact, we should aim for a complete open access system. Further it is the intention of CERC to encourage and implement merit order despatch. No priority or exclusivity can therefore be allowed to any constituent. CTU must ensure that they do not permit any constraints that restrict merit order despatch and if there are such, they must be removed. 5.3 There have been a large number of comments on the `scope’ of the connection conditions, particularly with regard to their applicability to generating units embedded in the intra State systems. Suggestions have been received from AP Transco, PSEB, RSEB, WBSEB, DVC and GRIDCO. CTU in the reply has stated that it accepts these suggestions that the connection conditions of the generating units embedded in the intra state system should be finalised by the SEB/STUs. Accordingly, it has modified the earlier proposal of applicability of connection conditions to generating units of 50 MW (10MW for NER) and above. In the revised draft, as regards applicability, it is stated that "the connection conditions for generating units embedded in the intra State systems shall be finalised by the respective STU/SEBs. Though we are partly in agreement with the modification carried out by CTU, it should be explicitly made clear that the exemption is applicable so long as such generating units are not connected to the ISTS. Accordingly, a proviso should be added to this effect in clause 4.3 of the Draft Code. The scope of the connection code extends to the CTU as well in as much as it is also required to comply with various obligations contained herein. As such the clause shall also include CTU, apart from others. 5.4 The procedure for connection as
contained in the draft Code has attracted comments from CEA, NLC, NPC, UPSEB,
GRIDCO and WBSEB. UPSEB has suggested that the time limit by which the CTU
shall normally make a formal offer to an Agency seeking connection/modification
should be spelt out precisely instead of `a reasonable time’ as in the Draft.
We are in agreement with this suggestion since the distinct feature of the
regulatory regime is that institutions should function with self-discipline.
As such CTU should modify the draft so as to put a specific time limit on
itself. In our view, taking into account similar provisions at the
distribution level in Orissa as in the Orissa State Electricity Regulatory
Commission’s regulations, a limit of one month from the date of receipt of
all the details should be specified. The Draft shall be amended accordingly.
5.5 NPC has suggested that the application for connection should be made to REB instead of CTU. Similarly, NLC has suggested that formal offer for connection should be given by REB instead of the CTU. This suggestion, however, has not been accepted. We are in agreement with CTU since the Electricity Laws (Amendment) Act of 1998 has vested the authority to exercise supervision and control of ISTS on CTU. However, CTU could ably discharge this function only in consultation and coordination with all concerned, particularly REBs, but the responsibility would be that of CTU. This being an inevitable mode of effective functioning it need not be spelt out at each and every stage. 5.6 The procedure for connections contemplates a separate dispensation for compliance of the conditions in respect of existing agencies already connected. In this context, the original draft contemplated relaxation for existing users upto five years, whereas CEA has suggested that the relaxation may be granted for a period of one year within which time, the connection agreements have to be finalised with them. The final draft has contemplated that the Commission may allow relaxation upto three years. NLC and WBSEB have proposed that the cost of any modifications which may be required to be carried out by existing parties for the purpose of the new agreement should be at the cost of CTU/Central funding. TNEB has suggested relaxation and continuation of existing connections as they are. A similar suggestion has been made by NTPC as well. NPC as well as WBSEB have also suggested total condonation of connection agreement instead of relaxation. NLC has suggested review of connection agreement at the end of five years. We have considered all the above suggestions. We are in agreement with CEA, which is a national level technical body familiar with the power systems in the country, that it is possible for the existing connections to be renegotiated within one year’s time. Further, we are also convinced that in the interest of grid discipline, there should not be discrimination between the users of the system, though time may be allowed to the existing users for conforming to the discipline. Hence total relaxation is not justifiable. We also would not like each case of relaxation to be considered by the Commission individually and as such we consider an outer limit of one year from the date of coming into force of the Grid Code as appropriate for existing parties to renegotiate and finalise arrangements. In case of any hardship, further relaxation beyond one year’s time may be considered by the Commission on the recommendation of the CTU. As regards the cost of modification, if any, it is only fair and just, in order to be non-discriminatory between the users, that the cost of any modifications should be borne by the utilities concerned. Accordingly, CTU is directed to suitably modify the draft to allow a period of one year for re-negotiation, and providing for a petition to the Commission in case of any hardship. |
|
|
5.7 UPSEB has suggested a clause prescribing penalty for noncompliance of the conditions. CEA and NHPC have suggested inclusion of a draft agreement in the IEGC. CEA has further suggested specification of obligations of the constituents towards security of ISTS and for achieving maximum efficiency and economy in the operation. There have also been suggestions for working out a mutual agreement with the involvement of the Commission. CTU has accepted that the draft of the Agreement would be approved by the Commission. However, considerable work and consultation may be required in making the draft, which will be annexed later, as an amendment. Taking into account the views of the respondents, as well as the reply of the CTU, we direct that a draft of the agreement be prepared on the lines suggested by CEA, and got approved from the Commission, which shall be annexed to the IEGC before its final release. CTU shall also suitably modify clause 4.5 to the effect that the draft of the Agreement is available in the annexure to the IEGC. 5.8 Clause 4.6(c)(ii) which deals
with the responsibility of agencies connected in sub-transmission and
distribution requiring that they do not depend upon ISTS for reactive
support, has evoked some adverse comments. AP Transco has proposed the
installation of SVC by CTU to take care of ICT losses. WBSEB has stated that
full reactive compensation is not required in the AC net work, and that
generating units should provide the reactive power. NLC has preferred that
the agreement with regard to reactive power requirement should be with REB
instead of CTU. In the reply, CTU has stated that it is not pragmatic for CTU
to provide reactive support. More over, SVCs are costly and sophisticated and
meant for special applications. However, in view of section 27(A)(2)(b) an
agreement for reactive power requirement could be entered into with CTU. We
find considerable logic in the reply of CTU and hence there is no need to
modify this clause as suggested by respondents. NLC has also suggested a new
clause under 4.6(d) to state that normal frequency of the operation of the
system shall be 50 Hz with a tolerance of ± 0.5 %. In this connection, we are
of the view that the prescription as per Indian Electricity Rules, 1956, may
be followed with the flexibility that this shall "normally"
prevail. 5.9 The System Planning Studies carried out by CEA and CTU and finalised by the Standing Committee on transmission planning as detailed in Chapter 3 of the Draft will bring about the requirement of installation of reactors and capacitors by CTU in the desired time-frame. The actual programme of implementation of transmission lines, reactors and capacitors will be determined by CTU. It is essential that the completion of these works in the required time-frame be ensured by CTU so that the reactive requirement of the system to this extent is not adversely affected. A clause to this effect defining the responsibility of CTU shall be incorporated, particularly as the obligation of ISGS in this context is included in Clause 7.6.6 of Draft IEGC. The suggestion regarding installation of SVCs is dealt with hereinafter under para 5.15. 5.10 Clause 4.7 of the draft deals with the equipment at connection points of both agency and CTU. In this connection, NLC and NPC have suggested for the specifications/short ckt capability to be specified by REB/CEA. CTU has replied that these are to be worked out through system studies and are to be specified by CTU in the connection agreement. Since these views have been taken note of by CTU and shall provide for the same in the connection agreement, we do not find any need for re-drafting. It was pointed out
during the hearing that the specified fault clearance times in clause 4.7(b)
were not likely to be met in several installations particularly at 132 KV. It
may not be necessary also to insist upon such stringency in relatively less important
lines. The existing specified conditions for 220 KV and 132 KV lines falling
within the purview of ISTS will be reviewed by CTU in consultation with REB
accordingly. 5.11 As regards back up protection, NLC had suggested that in the provision for the generator, it should be mentioned that the generator shall withstand the fault within permissible limits of operation. CTU, however, has not modified the clause as suggested by NLC with the remark that "the intent is to enable the generating units to be adequately specified so that they can withstand without damage, power system faults". We are satisfied that the provision in this clause should remain as such. As regards protection systems, the draft clause viz., 4.7(c), spells out the general characteristics of the system without going into the standards, specifications etc. A number of comments have been made, ranging from a suggestion for a separate Chapter (GRIDCO) to inclusion of general philosophy, standards etc., (CEA), and relay setting coordination by REB (NPC, UPSEB and TNEB). CTU, in reply has agreed to the suggestion of CEA to spell out the general philosophy, standards and guidelines. However, it proposed the same be included in the IEGC at a later date as an amendment. In view of the details to be considered and spelt out, we concur with the contention of CTU that the same may be set out in detail subsequently. However, since the contents of the connection agreement are to be approved by the Commission we direct CTU to include now in the IEGC to be issued a reference that the details of protection system will be spelt in the draft agreement so that it will come within the purview of the Commission before execution. We have also noted that CTU has accepted the suggestion of NLC and APTRANSCO that relay setting coordination shall be done at regional level by REB instead of the CTU. 5.12 Clause 4.8(a) states that a generating unit should be capable of continuously supplying its normal rated active/reactive output within the system frequency and voltage variation range indicated in para 4.6. NLC, NTPC and NHPC have stated that the provision should be subject to technical/design limitations, capability curve. CTU, in rejoinder, has stated that IEGC requires all generating units to utilise this capacity as may be considered necessary. According to NTPC, the reason for the suggestion for amendment is that generating units have design limitations stipulated by their manufacturers. In fact in the earlier rejoinder, CTU did agree that the clause would be suitably modified as per the suggestion of NTPC. Such a counter reply also appears against the reply of NLC. In the final rejoinder, however, CTU has not accepted the suggestion. We find logic in the suggestion of the respondents that design limitations stipulated by manufacturers have to be taken into account. Accordingly, we direct the CTU to modify this clause to accommodate provision for design limitations, if stipulated by manufacturers. As regards provision of AVR, protective and safety devices as contained in clause 4.8(b), NTPC and NPC have suggested the deletion on the plea that CGS need not enter into connection agreement. CTU has replied that all agencies including NTPC shall enter into connection agreements and the details of the devices will be spelt out in the connection agreement. The deletion of this clause is not warranted. We would like to reiterate that all existing utilities shall negotiate and finalise connection agreements within prescribed time limits as per IEGC. 5.13 The question of operating each generating unit with turbine speed governor was considered by us with the support of our technical experts. A number of suggestions have been made by various respondents like (a) free governor shall be "normally in operation" in place of "always in operation"; (b) it may not be possible in existing units; (c) special treatment to nuclear units; and (d) exclusion of units embedded in the intra-State transmission system. We are convinced that provision for free governor action in generating units is desirable for overall grid control. Though frequency control in the present conditions of the power system operation may not be possible with governor action alone and other means like load shedding, manual intervention etc. may also be necessary, yet the necessity of invoking the free governor action cannot be undermined. We also understand that governor is always an integral part of the turbine supplied to the generating unit. The problem really is that these governors have not been put to use by generating units. It is also understood that the problem of such discontinuation of use will be more pronounced in turbines of older vintage. Hence, activating existing governors in turbines of older vintage is a task for which suitable time may have to be allowed. We also understand that there should be no difficulty in activating the governor function on units of recent vintage. It is understood from CEA’s publication of compendium of power generation plants - July 99 that the plants which are 200 MW size and above constitute about 46% of the total installed capacity. Most of these units have been installed in 1980s and later and shall have no problem in activating governors for frequency control. Accordingly we direct that to begin with the stipulation regarding free governor shall apply to thermal units with a capacity of 200 MW and above, with immediate effect. This condition will also apply to all reservoir based hydro stations. For N.E. region, this condition will apply to units of 10 MW capacity and above. Keeping in view the time required to activate free governors, CTU may separately announce the time limit by which all other units should put free governors in action. We also grant liberty to any particular unit to approach the Commission to get exempted from the provisions regarding free governor for valid reasons. As regards the plea of Nuclear Power Corporation to provide a separate dispensation in view of safety considerations and special characteristics of Nuclear Plants, we have considered the matter and it is appropriate that Nuclear Units be permitted to continue operating in `turbine follow reactor’ mode. Since Nuclear capacity is small compared to regional capacity, such special dispensation will not make any significant difference. CTU is directed to accordingly modify clause 4.8.c so that (a) thermal generating units of 200 MW and above (10 MW and above for N.E. region) and reservoir based hydro stations need only to be covered by this clause immediately; (b) for all other units CTU may separately announce time limits for putting free governor in action. As regards suggestion of substituting the words "always in operation" by the words "normally in operation", keeping in view the purpose of this provision and to get the advantage of governor action for frequency control, the words `always’ is more appropriate than the words `normally in operation.’ 5.14 Clause 4.8 (d) stipulates that
each generating unit must be capable of instantaneously increasing the output
by 5% for a minimum of 5 minutes when the frequency falls and when operating
at any loading up to 105 % MCR, limiting to 105 % MCR. NLC has suggested that
the words `whenever possible’ be included in this clause. We consider that
there is no need for change, as any constraints in delivering full output may
be mentioned by the generator during operation. As regards separate treatment
for nuclear power stations in this connection, the contention of Nuclear
Power Corporation was considered. According to it since the Nuclear Power
Stations are basically base load stations, due to complexity of nuclear fuel
plant design, instantaneous increase of output by 5 % for a minimum of 5
minutes will not be possible. It may adversely affect the performance of
Nuclear fuel and reactor components due to undesired transients. Keeping in
view the special characteristics of nuclear plants, we accept the suggestion
of Nuclear Power Corporation. Accordingly, CTU shall modify clause 4.8(d) to
provide for exception to nuclear plants. 5.15 NTPC, MPEB, KEB and ASCI have suggested suitable line reactors whereas AP Transco suggested installation of SVC. WBSEB suggested mutual agreement between CTU and constituents. According to CTU, switchable line reactors cannot control dynamic over voltage when they are switched off. The line reactors have therefore to be fixed type for control of dynamic over voltage. SVCs are costly equipments meant for special applications. These suggestions are therefore not acceptable. However, CTU has deleted the word "fixed" from clause 4.9(b) to indicate that the line reactors need not be fixed ones in order to enable provision of switchable line reactor in case there is no requirement of control of dynamic over voltages. With this amendment, we consider that CTU has taken care of the suggestions of utilities as well as ASCI. 5.16 Clause 4.9 on reactive compensation has evoked considerable reaction from respondents. CEA has suggested that the reactive compensation be decided by the REB whereas the draft contemplates reactive compensation to be provided by CTU in the connection agreement. WBSEB has suggested mutual agreement between CTU and the constituents, NLC has suggested the requirement to be indicated by REB. UPSEB has suggested the deletion of the words `by CTU’ so that in the reactive compensation CTU will have no role while TNEB has proposed fixing of responsibilities, if desired results are not achieved. The substance of all the suggestions is that CTU should not have a free hand in the determination of the compensation. We are of the view that since the quantum of reactive compensation requirement will vary depending upon the growth of the power system, the same should be reviewed at regular intervals, say on an yearly basis through studies to be carried out by CTU in association with the constituents and REB. A provision to this effect may be added after clause 4.9(c). 5.17 The earlier draft on communication lacked clarity. NLC, NTPC and NPC have suggested that communication facilities be provided by CTU at its own cost. WBSEB and NGC have proposed two way communication between RLDC and SLDC. No justification has been provided for the above suggestions regarding cost. The responsibility for communication should lie on both the CTU and the agency. The details of the facilities at the respective ends are proposed to be specified in the Connection Agreement, which shall come before the Commission in due course. Grid operation is a collective effort in which all the participants have to play their assigned roles; hence there should be no reservation for establishing the facilities at their respective ends by the parties concerned. As rightly observed by some respondents, it is a two way process, which has to be appreciated by all the participants in the Grid. Northern Railway, as one of the Respondents, have proposed communication between traction control centres and RLDC/SLDC. Since Railways are a consumer of SEBs, their suggestion falls within the purview of SEB/STU. Hence no amendment in the draft is required as regards this clause. 5.18 Clause 4.11 deals with system
recording instruments. On this clause there were basically two comments viz.,
that the system should be provided at the cost of CTU and that the
requirements shall be specified by REB. These two comments are commonly found
in other clauses as well. As already stated, the responsibility is joint but
the prerogative of supervision and control being with CTU, clause needs no
amendment. However, in the revised draft, provision has been made for
specification of the instruments in the connection agreement, which shall
come before the Commission in due course. We are also confident that CTU
would finalise the contents of the agreement in consultation with the REBs.
One important point to be considered is that for purposeful analysis of the
information recorded by these instruments it is essential to achieve time
synchronisation at all power stations, sub-stations, etc. There is no mention
of this aspect in the IEGC. We direct CTU to include a clause on the scheme
envisaged to provide time synchronisation and its plan of implementation in
the Grid Code. 5.19 The most critical content of this Chapter relates to Operational Safety and the Responsibilities in this connection. In this clause responsibilities have been assigned on regional constituents/agency as well as assumed by CTU as proposed to be indicated in the site responsibilities schedules. This schedule is proposed to be produced by CTU and agency for which the format etc., shall be formulated by CTU. In this connection, NLC has suggested that the schedule as proposed should be finalised by REB. NTPC has suggested that the schedule be jointly prepared. CTU has stated in its reply that REB has no such role. Though strictly this may be the legal position, CTU should adopt the consultation process. In the counter reply finally submitted, CTU has stated that mutual discussions would be ensured and are implied to ensure transparency. With this statement of intent by CTU on the `Consultation Process’, we consider that there is no need for any further amendment on Site Responsibility schedules. 5.20 As regards site common drawings, NTPC has suggested that the Site Common Drawings will be prepared by CTU based on the detailed drawings for the agency portion at each connection point which will be furnished by the agency. This suggests an unilateral process of finalisation for Site Common Drawings whereas, the draft submitted by CTU reflects collaborative process in preparation and finalisation of the drawings. As such, we do not consider it appropriate to amend the draft any further. However, as suggested by the NTPC the draft has been amended to state that the necessary details shall be provided by the agencies to CTU. No other significant comments have been received with regard to clause 4.13, 4.14 and 4.15 and as such there is no need for any amendment to these clauses. With the various modification as stated above, the Chapter on Connection Conditions’ is approved. |
|
|
OPERATING CODE FOR REGIONAL GRIDS – CHAPTER 6 OF THE DRAFT The Chapter on `Operating Code for Regional Grids’ constitutes Chapter 6 of the Draft. This contains:
6.2 We have already observed under "Organisational Issues" that the linkages between the various entities can be found in the Chapter on `Operating Code for Regional Grids’. This part of the draft code along with Chapter 7, constitutes the heart of the entire Code in as much as it describes the duties and obligations of all concerned, including of RLDCs in the actual day to day operation. One feature of the operating Code is that it prescribes the basic framework whereas the detailed procedures for each Regional Grid are contemplated as separate operating procedures. We understand that already there are certain operating procedures. RLDC shall in consultation with the REBs ensure that these internal operating procedures are consistent with the IEGC. We are in agreement that it is not necessary to set out detailed operating procedures in this Code, as suggested by CEA. However, maintaining uniformity, shall be the responsibility of the CTU in coordination with the RLDCs. It shall also e |