Petition No |
Petitioner |
Subject |
Date of Order |
Date of hearing |
|
81/2003 |
Delhi Transco Limited |
Revising/fixing
tariff/tariff norms for purchase of power by Delhi Transco Ltd. from
Badarpur Thermal Power Station (3x95 MW + 2x210 MW). |
22-12-03 |
18-12-03 |
|
78/2001 |
NTPC |
Incentive/Disincentive for
Kawas GPS and Gandhar GPS. |
02-12-03 |
02-04-02 |
|
69/2003 |
NTPC |
Review of order dated 1.8.2003 in Petition No. 77/2002
(Tariff for Vindhyachal STPS Stage II for the period 1.4.2001 to
31.3.2004). |
15-12-03 |
02-12-03 |
|
77/2003 |
TNEB |
Review of order dated 6.8.2003 in Petition No.34/2001
for approval of tariff in respect of Ramagundam Super Thermal Power
Station for the period from 1.4.2001 to 31.3.2004. |
12-12-03 |
02-12-03 |
|
68/2003 |
NTPC |
Review of order dated
6.8.2003 in Petition No. 30/2001 (Tariff for Korba STPS for the period
1.4.2001 to 31.3.2004). |
11-12-03 |
02-12-03 |
|
59/2003 |
NTPC |
Review of order dated 23.7.2003, approving the tariff
for Singrauli STPS for the period 1.4.2001 to 31.3.2004. |
10-12-03 |
02-12-03 |
|
74/2003 |
NTPC |
Review of order dated 6.8.2003 in Petition No. 34/2001 (Tariff for
Ramagundam STPS for the period 1.4.2001 to 31.3.2004). |
11-12-03 |
02-12-03 |
|
54/2003
55/2003
62/2003
63/2003 |
Tamil
Nadu Electricity Board |
Review of order dated 30.6.2003 in Petition No.40/2002
for fixing transmission tariff for 400 kV D/C Kaiga-Sirsi transmission
line for the period 2001-2004 - Award of FERV when no repayment is made
during the tariff period and apportioning the increase due to FERV
between loan and equity instead of to loan only.
Review of order dated 30.6.2003 in Petition No.7/2002
for fixing transmission tariff for the Central Transmission Project A.C.
line System in Southern Region for the period 2001-2004 - Award of FERV
on notional/accrual basis at the beginning of the tariff period when
repayment is made during the tariff period and apportioning the increase
due to FERV between loan and equity instead of to loan only.
Review of order dated 18.7.2003 in Petition No.51/2002
for fixing transmission tariff for 400 kV D/C Jeypore-Gazuwaka
Transmission Line and HVDC back to back station at Gazuwaka for the
period 2001-2004 - Award of FERV upfront when repayment is made during
the tariff period and apportioning the increase due to FERV between loan
and equity instead of to loan only.
Review of order dated 30.6.2003 in Petition No.9/2002
for fixing transmission tariff for 400 kV Ramgundam-Chandrapur D/C line
system between Southern Region and Western Region for the period
2001-2004 - Award of FERV on notional basis at the beginning of the
tariff period when repayment is made during the tariff period and
apportioning the increase due to FERV between loan and equity instead of
to loan only. |
04-12-03 |
18-11-03 |
|
2/2002 |
NTPC |
Tariff for Simhadri Thermal
Power Project (2x500 MW) |
19-11-03 |
14-11-03 |
|
58/2003 |
NTPC |
Approval of Tariff for Unit-II (500 MW) of Talcher Super
Thermal Power Project Stage-II (4x500 MW). |
06-11-03 |
30-10-03 |
|
62/2000 |
NTPC |
Approval of tariff for Talcher Thermal Power Station for
the period from 1.4.2000 to 31.3.2004. |
05-11-03 |
09-09-03 |
|
32/2001 |
NTPC |
Approval of tariff in respect of Vindhyachal Super
Thermal Power Station Stage I for the period from 1.4.2001 to 31.3.2004. |
06-11-03 |
17-03-03 |
|
23/1999 |
NTPC |
Review
of order dated 30.6.2003 |
29-10-03 |
22-10-03 |
|
44/2001 |
NTPC |
Approval of tariff in
respect of Dadri Gas Power Station for the period from 1.4.2001 to 31.3.2004.
|
24-10-03 |
28-08-03 |
|
41/2001 |
NTPC |
Approval of tariff in
respect of Feroze Gandhi Unchahar Thermal Power Station Stage I for the period from 1.4.2001 to
31.3.2004. |
24-10-03 |
28-08-03 |
| IA No. 30/2003 in Pet No. 62/2000 |
NTPC |
Tariff
for Talcher TPS for the period 1.4.2000 to 31.3.2004 |
25-09-03 |
09-09-03 |
35/2001 36/2003 |
NTPC |
Approval of tariff of Talcher Super Thermal Power Station (1000 MW) for the period from 1.4.2001 to 31.3.2004.
Approval of two part tariff for Kopili Hydro Electric
Project (4x50 MW) and Khandong Hydro Electric Project (2x25 MW) for the period
from 1.4.2001 to 31.3.2004 |
16-09-03 |
09-09-03 |
| 103/2002 |
NTPC |
Review of order dated 24.6.2002
in Petition No.72/2000 of Talcher STPS
(1000 MW)
|
16-09-03 |
09-09-03 |
| 24/2003 |
NLCL |
Treatment of actual generation over the
declared capacity by generator under the ABT
regime. |
29-08-03 |
07-08-03 |
| 41/2001 44/2001 45/2001 46/2001 |
NTPC |
Approval of
Tariff for FGUTPS, Dadri GPS, Anta GPS, Auraiya GPS for the
period 1.4.2001 to 31.3.2004. |
02-09-03 |
28-08-03 |
| 15/2003 |
TNEB |
Direction to PGCIL to limit transmission
charges to lines actually used for transfer of power to
Southern Region |
03-09-03 |
26-08-03 |
| 78/2001 |
NTPC |
Incentive/Disincentive for Gandhar GPS and
Kawas GPS for period up to 31.3.1998. |
13-08-03 |
11-08-03 |
| 43/2003 |
NTPC |
Removing difficulties in implementation of
ABT order |
29-08-03 |
25-08-03 |
| 34/2003 |
NLCL |
Request for postponement of ABT operation
for Unit No.1 of NLC Thermal Power Station-I Expansion (2x210
MW) |
25-08-03 |
28-08-03 |
| 18/2003 |
TNEB |
Review of order dated 1.11.2002 in
Petition No.68/2000 viz. Approval for final recovery of extra
Rupee Liability due to Foreign Exchange Rate Variation for the
year 1999-2000 |
01-09-03 |
26-08-03 |
| 34/2001 |
NTPC |
Approval of
tariff in respect of Ramagundam Super Thermal Power Station
for the period from 1.4.2001 to 31.3.2004. |
06-08-03 |
27-03-03 |
| 30/2001 |
NTPC |
Approval of
tariff in respect of Korba Super Thermal Power Station for the
period from 1.4.2001 to 31.3.2004. |
06-08-03 |
17-03-03 |
| 24/2003 |
NLCL |
Treatment
of actual generation over the declared capacity by generator
under the ABT regime. |
12-08-03 |
07-08-03 |
| 17/2003 |
NLCL |
Request for
exclusion of NLC Thermal Power Station – II from ABT
implementation. |
11-08-03 |
07-08-03 |
| 16/2003 |
NLCL |
Combining
Stage I & Stage II of TPS II and trading the TPS II as a
single station for the purpose of scheduling and computation
of UI. |
12-08-03 |
07-08-03 |
20/1999 77/2002 |
NTPC |
Approval of tariff in respect of
Vindhyachal Super Thermal Power Station for the period from
1.7.2000 to 31.3.2001 and 1.4.2001 to 31.3.2004 |
01-08-03 |
19-12-02 |
| 39/2001 |
NTPC |
Approval of tariff in respect of Singrauli
Super Thermal Power Station for the period from 1.4.2001 to
31.3.2004 |
23-07-03 |
14-11-02 |
| IA No. 17/2003 in Pet No. 1/2003 |
NTPC |
Provisional Tariff for Unit-I of Talcher
STPS Stage II |
17-07-03 |
10-07-03 |
| Rev. Pet. No. 143/2002 in Pet. No. 35/2002 |
NTPC |
Application for amendment of Review
Petition (Review of Commission’s Order dated 24.10.2002 in
Petition No. 35/2002-Vindhyachal STPS Stage I |
09-07-03 |
03-07-03 |
| 95/2002 |
NTPC |
Approval of tariff for Dadri GPS for the
period from 1.4.1999 to 31.3.2001 |
04-06-03 |
27-05-03 |
| 2/2002 |
NTPC |
Approval of tariff for Unit I & Unit
II (2x500 MW) of Simhadri Thermal Power Project |
04-06-03 |
27-05-03 |
| 31/2001 & 33/2001 |
NTPC |
Approval of generation tariff for Kawas
and Gandhar GPS in Western Region for the period from 1.4.2001
to 31.3.2004 |
16-06-03 |
29-05-03 |
| 128/2002 |
NTPC |
Approval of tariff of National Capital
Thermal Power Station, Dadri (840 MW) from 01.04.1998 to
31.3.2001 dated |
12-06-03 |
27-05-03 |
| RV 125/2002 in 31/2002 |
NTPC |
Tariff of Singrauli Super Thermal Power
Station for the period from 1.11.1997 to
31.3.2001 |
07-05-03 |
03-04-03 |
| RV 126/2002 in 29/2002 |
NTPC |
Tariff of Ramagundam Super Thermal Power
Station for the period from 1.4.1997 to 31.3.2001
|
07-05-03 |
03-04-03 |
| 34/2001 |
NTPC |
Approval of Generation Tariff for
Ramagundam STPS in Southern Region for the period from
1.4.2001 to 31.3.2004 |
05-2003 |
27-03-03 |
| 36/2001 |
NTPC |
Approval of generation tariff for Farrakka
STPS for the period from 1.4.2001 to 31.3.2004 |
06-05-03 |
25-03-03 |
| 98/2002
37/2001 |
NTPC |
Approval of tariff of Kahalgaon STPS for
the period from 1.4.2000 to 31.3.2001
Approval of tariff of Kahalgaon STPS for
the period from 1.4.2001 to 31.3.2004 |
06-05-03 |
25-03-03 |
| RV 103/2002 in 72/2000
35/2001 |
NTPC |
Review of order dated 24.6.2002 of Talcher
STPS (1000 MW) |
22-04-03 |
11-03-03 |
| RV 2/2003 in 77/2001 |
NTPC |
RV for approval of tariff of Tanda Thermal
Power Station |
09-04-03 |
11-03-03 |
| 38/2001 |
NTPC |
Generation Tariff for Rihand STPS in
Northern Region for the period from 1.4.2001 to
31.3.2004 |
22-04-03 |
08-04-03 |
| 30/2001
32/2001 |
NTPC |
Generation
Tariff for Korba STPS in Western Region for the period from
1.4.2001 to 31.3.2004
Generation
Tariff for Vindhyachal STPS in Western Region for the period
from 1.4.2001 to 31.3.2004 |
23-04-03 |
17-03-03 |
| 128/2002 |
NCTPS |
Approval of tariff of National Capital
Thermal Power Station, Dadri (840 MW) from 01.04.1998 to
31.3.2001 |
22-04-03 |
13-03-03 |
| RV 127/2002 in 30/2002 |
NTPC |
Review of order dated 4.10.2002 in
Petition No. 30/2002, approving tariff for Rihand STPS for the
period from 1.4.1997 to 31.3.2001 |
09-04-03 |
03-03-03 |
| IA No. 1/2003
in 1/2003 |
NTPC |
Approval of Tariff for Unit-I (500 MW) of
Talcher Super Thermal Power Project Stage-II (4x500
MW) |
11-03-03 |
27-02-03 |
| RV
No.146/2002 In 29/2002 |
TNEB |
Review of order dated 9.10.2002 in
Petition No.29/2002 for approval of revised fixed charges from
1.4.1997 to 31.10.1997 and tariff from 1.11.1997 to 31.3.2001
of Ramagundam Super Thermal Power Station |
13-02-03 |
07-02-03 |
| IA No.51/2002
in 77/2001 |
NTPC |
Application seeking clarification and/or
reconsideration and/or review and/or modification of the order
dated 28-06-02 in petition no. 77/2001 - Approval of Tariff of
Tanda Thermal Power Station |
06-01-03 |
17-12-02 |