Sl.No. Petition No. Subject Date of Order Date of posting Order on website Category

722


873/AT/2025

31.12.2025 31.12.2025 Adoption

721


858/AT/2025

31.12.2025 31.12.2025 Adoption

720


544/TT/2025

31.12.2025 31.12.2025 Transmission

719


485/TT/2025

31.12.2025 31.12.2025 Transmission

718


402/TT/2025

31.12.2025 31.12.2025 Transmission

717


342/TT/2025

31.12.2025 31.12.2025 Transmission

716


265/TT/2025

31.12.2025 31.12.2025 Transmission

715


260/AT/2025

31.12.2025 31.12.2025 Adoption

714


872/TL/2025

31.12.2025 31.12.2025 Licence (Transmission)

713


446/TT/2024

31.12.2025 31.12.2025 Transmission

712


240/MP/2023 & 302/MP/2023

31.12.2025 31.12.2025 Misc.

711


267/MP/2024

31.12.2025 31.12.2025 Misc.

710


107/MP/2021

31.12.2025 31.12.2025 Misc.

709


583/TT/2025

31.12.2025 31.12.2025 Transmission

708


409/TT/2025

30.12.2025 30.12.2025 Transmission

707


267/TT/2025

30.12.2025 30.12.2025 Transmission

706


192/TT/2025

30.12.2025 30.12.2025 Transmission

705


281/TT/2025

30.12.2025 30.12.2025 Transmission

704


481/TT/2025

29.12.2025 30.12.2025 Transmission

703


406/TT/2025

Petition for approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for an asset, namely, - 1x1500 MVA, 765/400 kV ICT (3rd) along with associated bays at Vadodara Substation under “Transmission Network Expansion in Gujarat to increase its ATC from ISTS (Part A)” in the Western Region. Power Grid Corporation of India Limited
29.12.2025 30.12.2025 Transmission

702


268/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under the Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing-up of the transmission tariff for the 2019-24 tariff period under Central Electricity Regulatory Commission (Terms and Condition of Tariff Regulations) 2019 and determination of the transmission tariff for the 2024-29 tariff period Central Electricity Regulatory Commission (Terms and Condition of Tariff Regulations) 2024 for 1x500 MVA, 400/220 kV ICT augmentation along with associated bays at Shujalpur (PG) Sub-station under “ICT augmentation at 2x315 MVA, 400/220 kV Shujalpur (PG) Sub-station” in the Western Region. Power Grid Corporation of India Limited
29.12.2025 30.12.2025 Transmission

701


861/AT/2025

29.12.2025 29.12.2025 Adoption

700


128/GT/2024

26.12.2025 29.12.2025 Generation

699


105/MP/2024

26.12.2025 29.12.2025 Misc.

698


68/AT/2025

26.12.2025 29.12.2025 Adoption

697


390/TT/2025

29.12.2025 29.12.2025 Transmission

696


200/TT/2025

29.12.2025 29.12.2025 Transmission

695


108/TT/2016
(On Remand)

29.12.2025 29.12.2025 Transmission

694


350/MP/2024 along with IA No. 101/2024 and 103/2024

26.12.2025 29.12.2025 Misc.

693


259/MP/2024 along with IA No. 59/2024

26.12.2025 29.12.2025 Misc.

692


10/SM/2025

29.12.2025 29.12.2025 Suo-Motu

691


336/MP/2025

29.12.2025 29.12.2025 Misc.

690


860/TL/2025

26.12.2025 26.12.2025 Licence (Transmission)

689


8/RP/2025 in 87/MP/2024

25.12.2025 26.12.2025 Review

688


4/SM/2025

25.12.2025 26.12.2025 Suo-Motu

687


857/TL/2025

25.12.2025 25.12.2025 Licence (Transmission)

686


IA No. 59/2025 in 282/MP/2023

Petition under Section 79 of the Electricity Act, 2003, and the Power Purchase Agreement dated 6.12.2018 executed between ACME Phalodi Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 6.12.2018 executed between ACME Raisar Solar Energy Pvt. Ltd. and Solar Energy Corporation of India Ltd. and the Power Purchase Agreement dated 7.12.2018 executed between ACME Deoghar Solar Power Pvt. Ltd. and Solar Energy Corporation of India Ltd., the Power Purchase Agreement dated 7.12.2018 executed between ACME Dhaulpur Powertech Pvt. Ltd. and Solar Energy Corporation of India Ltd. seeking declaration that the condition of undergrounding of internal 33 kV transmission lines pursuant to Order dated 19.4.2021 passed by the Hon’ble Supreme Court in WP(c) No. 838 of 2019 is a Change in Law event and directions to SECI to compensate the Petitioners towards the additional cost incurred due to such Change in Law event. 1. ACME Deoghar Solar Power Pvt. Ltd., 2. ACME Dhaulpur Powertech Pvt. Ltd., 3. ACME Phalodi Solar Energy Pvt. Ltd., 4. ACME Raisar Solar Energy Pvt. Ltd., 5. ACME Solar Holdings Pvt. Ltd.
24.12.2025 24.12.2025 Misc.

685


60/TT/2025

22.12.2025 22.12.2025 Transmission

684


588/TT/2025

22.12.2025 22.12.2025 Transmission

683


299/TT/2024

Petition for approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999, and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019, for the determination of the transmission tariff from the COD to 31.3.2024 for the asset: Conversion of existing 50 MVAr Fixed Line Reactors on each circuit of Parli (PG)- Pune (GIS) 400 kV D/C Line at Parli (PG) end into Switchable Line Reactors under “Transmission System for evacuation of power from RE projects in wind energy zones in Osmanabad area of Maharashtra (1 GW): Conversion of 50 MVAr Fixed Line Reactors on each circuit of Parli (PG) – Pune (GIS) 400 kV D/C Line at Parli (PG) end into Switchable Line Reactors” in the Western Region. Power Grid Corporation of India Limited
22.12.2025 22.12.2025 Transmission

682


513/TL/2024

18.12.2025 18.12.2025 Licence (Transmission)

681


73/TL/2025

18.12.2025 18.12.2025 Licence (Transmission)

680


758/AT/2025

18.12.2025 18.12.2025 Adoption

679


789/TL/2025

18.12.2025 18.12.2025 Licence (Transmission)

678


610/TT/2025

17.12.2025 17.12.2025 Transmission

677


869/TL/2025

15.12.2025 15.12.2025 Licence (Transmission)

676


401/TT/2025

15.12.2025 15.12.2025 Transmission

675


567/TT/2025

14.12.2025 15.12.2025 Transmission

674


512/TT/2025

14.12.2025 15.12.2025 Transmission

673


372/TT/2025

14.12.2025 15.12.2025 Transmission

672


22/TT/2025

14.12.2025 15.12.2025 Transmission

671


827/TD/2025

12.12.2025 13.12.2025 Licence

670


452/MP/2025 along with IA.No.75/2025 and IA.No.82/2025

12.12.2025 12.12.2025 Misc.

669


526/TT/2025

11.12.2025 12.12.2025 Transmission

668


270/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under the Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Condition of Tariff Regulations) 2019, and the Central Electricity Regulatory Commission (Terms and Condition of Tariff Regulations) 2024, for truing up of the transmission tariff for the 2019-24 tariff period and the determination of the transmission tariff for the 2024-29 tariff period for the Combined Asset under “East Coast Energy Private Limited and NCC Power Projects Limited LTOA Generation Projects in Srikakulam Area Part-B” in the Eastern, Western and Southern Region. Power Grid Corporation of India Limited
11.12.2025 12.12.2025 Transmission

667


93/TT/2025

11.12.2025 12.12.2025 Transmission

666


587/TT/2025

08.12.2025 09.12.2025 Transmission

665


14/SM/2025

08.12.2025 08.12.2025 Suo-Motu

664


316/MP/2025

06.12.2025 08.12.2025 Misc.

663


209/MP/2017
(On Remand)

08.12.2025 08.12.2025 Misc.

662


263/TT/2025

08.12.2025 08.12.2025 Transmission

661


245/TL/2025

07.12.2025 08.12.2025 Licence (Transmission)

660


597/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing up of the transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for Asset-I: 400 kV S/C line-2 Ramagundam - Hyderabad in Southern Region and Asset-II: Bhadrawati (Chandrapur) HVDC back-to-back station (2x500 MW) between Western Region and Southern Region associated with Chandrapur HVDC back-to-back project (2x500 MW). Power Grid Corporation of India Limited
06.12.2025 07.12.2025 Transmission

659


768/MP/2025 along with IA 76/2025 and 77/2025 & 769/MP/2025 along with 78/2025 and 79/2025

05.12.2025 05.12.2025 Misc.

658


384/TT/2025

05.12.2025 05.12.2025 Transmission

657


376/TT/2025

05.12.2025 05.12.2025 Transmission

656


330/TT/2023

05.12.2025 05.12.2025 Transmission

655


262/TT/2025

05.12.2025 05.12.2025 Transmission

654


202/TT/2025

05.12.2025 05.12.2025 Transmission

653


101/TT/2025

05.12.2025 05.12.2025 Transmission

652


80/TT/2025

05.12.2025 05.12.2025 Transmission

651


59/TT/2025

05.12.2025 05.12.2025 Transmission

650


211/TT/2024

Approval under under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the determination of Transmission Tariff from COD/Proposed COD/Anticipated COD to 31.3.2024 for Asset:1: 420 kV 63 MVAR Lower Subansiri-2 line reactor (to be used as Bus Reactor) along with associated bays & equipment’s at Biswanath Chariyali (POWERGRID), Asset-2: Lower Subansiri – Biswanath Chariyali (POWERGRID) 400 kV D/C line-1 with twin Lapwing conductor along with associated bays & equipment’s at Biswanath Chariyali (POWERGRID), Asset-3: Lower Subansiri - Biswanath Chariyali (POWERGRID) 400 kV D/C line-2 with twin Lapwing conductor along with associated bays & equipment’s at Biswanath Chariyali (POWERGRID) & Asset-4: 420 kV 63 MVAR Lower Subansiri-4 line reactor (to be used as Bus Reactor) along with associated bays & equipment’s at Biswanath Chariyali (POWERGRID) under the transmission system associated with “North East – Northern/Western Interconnector – I Project” in the North-Eastern Region. Power Grid Corporation of India Limited
05.12.2025 05.12.2025 Transmission

649


727/MP/2025 along with IA No. 115/IA/2025

04.12.2025 04.12.2025 Misc.

648


295/MP/2024

30.11.2025 03.12.2025 Misc

647


221/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and the determination of transmission tariff for the 2024-29 tariff period for the Transmission Asset-1: The Bus Splitting Scheme at Moga Sub-station under the Transmission Scheme for Controlling High Loading and High Short Circuit Level at Moga Sub-station in the Northern Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
01.12.2025 02.12.2025 Transmission

646


318/TT/2025

Revision of fees and charges from the COD to 31.3.2014 and for the 2014-19 tariff period for 2 Nos. assets under Fiber Optic Communication System in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave Links in Northern Region as per remand order dated 17.08.2023 in Petition No. 240/TT/2013; - Petition for truing up of fees and charges for the 2019-24 tariff period and determination of fees and charges for the 2024-29 tariff block for 4 Nos. assets under Fiber Optic Communication System in lieu of existing Unified Load Despatch and Communication (ULDC) Microwave Links in Northern Region under Sub-section(4) of Section 28 of the Electricity Act, 2003 and under the Regulation 15 (1) (a) and Regulation 23 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
01.12.2025 01.12.2025 Transmission

645


26/MP/2024 along with IA No. 65/ IA/2024

28.11.2025 29.11.2025 Misc.

644


273/MP/2024 alongwith IA No.120/IA/2025

28.11.2025 29.11.2025 Misc.

643


184/MP/2019 (On remand)

28.11.2025 28.11.2025 Misc.

642


254/AT/2025

27.11.2025 27.11.2025 Adoption

641


827/TD/2025

27.11.2025 27.11.2025 Licence

640


254/MP/2023

26.11.2025 26.11.2025 Misc.

639


722/AT/2025

22.11.2025 24.11.2025 Adoption

638


45/GT/2016

20.11.2025 20.11.2025 Generation

637


426/TL/2024

19.11.2025 19.11.2025 Licence (Transmission)

636


107/MP/2023, 85/MP/2022, 123/MP/2022, 246/MP/2022, 56/MP/2023, 185/MP/2023, 205/MP/2023

19.11.2025 19.11.2025 Misc.

635


13/SM/2025

04.11.2025 18.11.2025 Suo-Motu

634


908/RC/2025

18.11.2025 18.11.2025 Misc.

633


Corrigendum to 52/TT/2023

18.11.2025 18.11.2025 Transmission

632


789/TL/2025

18.11.2025 18.11.2025 Licence (Transmission)

631


693/MP/2025

17.11.2025 17.11.2025 Misc.

630


755/TL/2025

17.11.2025 17.11.2025 Licence (Transmission)

629


428/MP/2024 along with IA 45/2025

17.11.2025 17.11.2025 Misc.

628


862/MP/2025 along with I. A. No. 108/IA/2025

17.11.2025 17.11.2025 Misc.

627


56/MP/2022

14.11.2025 15.11.2025 Misc.

626


159/TT/2024

14.11.2025 14.11.2025 Transmission

625


271/TT/2025

13.11.2025 14.11.2025 Transmission

624


854/MP/2025

14.11.2025 14.11.2025 Misc.

623


5/RP/2025 In 436/GT/2020

13.11.2025 13.11.2025 Review

622


4/RP/2025 In 440/GT/2020

13.11.2025 13.11.2025 Review

621


55/TT/2023

12.11.2025 12.11.2025 Transmission

620


3/TT/2023

12.11.2025 12.11.2025 Transmission

619


849/TD/2025

08.11.2025 10.11.2025 Licence

618


778/TD/2025

07.11.2025 07.11.2025 Licence

617


756/AT/2025

07.11.2025 07.11.2025 Adoption

616


482/TT/2019 and 676/TT/2020

Petition seeking approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 for revision of transmission tariff for the 2001-04, 2004-09, 2009-14 tariff periods, and truing up of transmission tariff for the 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and the determination of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the Combined Assets consisting of Asset l: 800 kV Kishenpur-Moga Transmission Line-I along with the associated bays; Asset Il: 800 kV Kishenpur-Moga Transmission Line-Il along with the associated bays; Asset Ill: 420 kV, 63 MVAr Bus Reactor at Kishenpur Substation with the associated bays and 420/220 kV, 250 MVA ICT III at Moga Substation with the associated bays for the transmission system associated with Kishenpur-Moga Transmission System in the Northern Region. Power Grid Corporation of India Limited
07.11.2025 07.11.2025 Transmission

615


496/MP/2024

1.11.2025 1.11.2025 Misc.

614


441/TL/2025

30.10.2025 1.11.2025 Licence (Transmission)

613


253/MP/2024

1.11.2025 1.11.2025 Misc.

612


Corrigendum to 11/SM/2025

31.10.2025 31.10.2025 Suo-Motu

611


201/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of transmission tariff for the 2024-29 tariff period for Asset: Meerut-Moga 765 kV S/C Transmission Line along with associated bays at Meerut and Moga 765 /400 kV Sub-stations with 02 Numbers 240 MVAR line reactor (01 Number switchable and 01 Number non-switchable line reactor) each at Meerut and Moga under the Northern Region System Strengthening Scheme-XXVI under Section 62 read with Section 79 (1) (d) of the Electricity Act, 2003 and under Regulation 15 (1) (a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
30.10.2025 31.10.2025 Transmission

610


755/TL/2025

30.10.2025 30.10.2025 Licence (Transmission)

609


780/TD/2025

30.10.2025 30.10.2025 Licence

608


199/TT/2025

30.10.2025 30.10.2025 Transmission

607


181/TT/2024

30.10.2025 30.10.2025 Transmission

606


391/TT/2023

29.10.2025 29.10.2025 Transmission

605


327/TT/2023

29.10.2025 29.10.2025 Transmission

604


195/TT/2025

28.10.2025 29.10.2025 Transmission

603


95/TT/2024

28.10.2025 28.10.2025 Transmission

602


11/SM/2025

28.10.2025 28.10.2025 Suo-Motu

601


38/RP/2023 in 252/MP/2021

27.10.2025 27.10.2025 Review

600


380/TT/2025

27.10.2025 27.10.2025 Transmission

599


689/TL/2025

26.10.2025 27.10.2025 Licence (Transmission)

598


686/TL/2025

Petition under Section 14 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2024 for the grant of a separate RTM Transmission License to POWERGRID Bikaner IV Transmission Limited to implement transmission project “Augmentation of 2x500 MVA (7th & 8th), 400/220 kV ICTs along with 220 kV Sectionalizer bay (1 set), 220 kV BC (1 no.) bay and 220 kV TBC (1 no.) bay at Bikaner-IV PS & Implementation of 3 nos. of 220 kV line bays for interconnection of M/s Furies Solren Private Limited (300 MW) [1 no. bay] & M/s SJVN Green Energy Limited (500 MW) [2 no. bays] RE power projects at 765/400/220 kV Bikaner-IV PS under “Regulated Tariff Mechanism” (RTM) Mode. POWERGRID Bikaner IV Transmission Limited
26.10.2025 27.10.2025 Licence (Transmission)

597


834/MP/2025

24.10.2025 24.10.2025 Misc.

596


725/TL/2025

24.10.2025 24.10.2025 Licence (Transmission)

595


723/AT/2025 along with I.A. No. 66/2025

24.10.2025 24.10.2025 Adoption

594


688/TL/2025

24.10.2025 24.10.2025 Licence (Transmission)

593


678/TL/2025

24.10.2025 24.10.2025 Licence (Transmission)

592


413/MP/2024

24.10.2025 24.10.2025 Misc.

591


24/RP/2023 In 392/GT/2020

22.10.2025 22.10.2025 Review

590


349/MP/2024 with IA Nos. 84 & 85/2024

21.10.2025 22.10.2025 Misc.

589


IA No. 61/2025 in 91/MP/2024

17.10.2025 18.10.2025 Misc.

588


724/AT/2025

17.10.2025 18.10.2025 Adoption

587


162/MP/2022

13.10.2025 13.10.2025 Misc.

586


75/MP/2023

13.10.2025 13.10.2025 Misc.

585


27/RP/2024 in 377/MP/2022

13.10.2025 13.10.2025 Review

584


96/TT/2024

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from COD to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset-1: Phase-I Unified Real Time Dynamic State Measurement (URTDSM) for NLDC, Backup NLDC And NTAMC System-Phase -I Unified Real Time Dynamic State Measurement (URTDSM) for NLDC, Backup NLDC And NTAMC System-Phasor Data Concentrator (PDC) At NLDC, Backup NLDC and NTAMC System, and Asset-2: URTDSM System (Control Center equipment, PMUs and associated equipment integrated and commissioned at ERLDC (7 PMUs) under “Phase-I- Unified Real Time Dynamic State Measurement (URTDSM)”. Power Grid Corporation of India Limited
13.10.2025 13.10.2025 Transmission

583


33/RP/2024 in 328/TT/2023

13.10.2025 13.10.2025 Review

582


780/TD/2025

06.10.2025 06.10.2025 Licence

581


778/TD/2025

06.10.2025 06.10.2025 Licence

580


9/SM/2024

05.10.2025 05.10.2025 Suo-Motu

579


761/MP/2025

03.10.2025 03.10.2025 Misc.

578


672/MP/2025

03.10.2025 03.10.2025 Misc.

577


671/MP/2025

03.10.2025 03.10.2025 Misc.

576


184/TT/2024

03.10.2025 03.10.2025 Transmission

575


234/AT/2025

01.10.2025 01.10.2025 Adoption

574


360/TT/2023

01.10.2025 01.10.2025 Transmission

573


546/MP/2025

30.09.2025 30.09.2025 Misc.

572


204/TT/2025

Petition for true-up of transmission tariff for the 2019-24 tariff period and determination of transmission tariff for the 2024-29 tariff period for Transmission Asset: RAPP – Kota 400 kV D/C line (part of RAPP - Jaipur (South) 400 kV D/C line with one ckt LILOed at Kota), along with associated bay at Kota under Transmission System associated with RAPP 7 and 8, Part-A under Section 62 read with Section 79 (1) (d) of the Electricity Act, 2003, and under Regulation 15 (1) (a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023, read with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019, and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
30.09.2025 30.09.2025 Transmission

571


203/TT/2025

30.09.2025 30.09.2025 Transmission

570


725/TL/2025

30.09.2025 30.09.2025 Licence (Transmission)

569


689/TL/2025

27.09.2025 28.09.2025 Licence (Transmission)

568


688/TL/2025

27.09.2025 28.09.2025 Licence (Transmission)

567


687/MP/2025 along with I.A. No. 65/2025

27.09.2025 28.09.2025 Misc.

566


686/TL/2025

Petition under Section 14 of the Electricity Act, 2003 read with Central Electricity Regulatory Commission (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2024 for grant of separate RTM Transmission License to POWERGRID Bikaner IV Transmission Limited to implement transmission project “Augmentation of 2x500 MVA (7th & 8th), 400/220 kV ICTs along with 220 kV Sectionalizer bay (1 set), 220 kV BC (1 no.) bay and 220 kV TBC (1 no.) bay at Bikaner-IV PS & Implementation of 3 nos. of 220 kV line bays for interconnection of M/s Furies Solren Private Limited (300MW) [1 no. bay] & M/s SJVN Green Energy Limited (500MW) [2 no. bays] RE power projects at 765/400/220kV Bikaner-IV PS under “Regulated Tariff Mechanism” (RTM) Mode. POWERGRID Bikaner IV Transmission Limited
27.09.2025 28.09.2025 Licence (Transmission)

565


377/TT/2025

27.09.2025 28.09.2025 Transmission

564


678/TL/2025

25.09.2025 25.09.2025 Licence (Transmission)

563


679/AT/2025

25.09.2025 25.09.2025 Adoption

562


445/TD/2025

25.09.2025 25.09.2025 Licence

561


13/RP/2025 along with IA No. 81/2025 in 241/AT/2025

24.09.2025 24.09.2025 Review

560


52/TT/2023

23.09.2025 23.09.2025 Transmission

559


173/TT/2013, 111/TT/2015 and 33/RP/2016 (On Remand)

22.09.2025 22.09.2025 Transmission

558


149/TT/2024

19.09.2025 19.09.2025 Transmission

557


192/MP/2023

16.09.2025 16.09.2025 Misc.

556


470/TL/2025

13.09.2025 15.09.2025 Licence (Transmission)

555


137/GT/2024

08.09.2025 09.09.2025 Generation

554


9/TT/2021
(On remand)

09.09.2025 09.09.2025 Misc.

553


244/MP/2024

06.09.2025 08.09.2025 Misc.

552


4/TT/2023

03.09.2025 04.09.2025 Transmission

551


303/MP/2024

01.09.2025 01.09.2025 Misc.

550


324/MP/2025 and 279/MP/2025 along with IA No. 75/2025 and IA No. 256/2025

31.08.2025 31.08.2025 Misc.

549


164/MP/2023 along with 166/MP/2023

31.08.2025 31.08.2025 Misc.

548


162/MP/2024

30.08.2025 31.08.2025 Misc.

547


475/GT/2025

31.08.2025 31.08.2025 Generation

546


668/TD/2025

31.08.2025 31.08.2025 Licence

545


468/TL/2025

31.08.2025 31.08.2025 Licence (Transmission)

544


445/TD/2025

31.08.2025 31.08.2025 Licence

543


186/TT/2025

Approval under Section 62 read with Section 79 (1) (d) of the Electricity Act, 2003 and under Regulation 15 (1) (a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for 400 kV S/C Chamera II Pooling Station Transmission Line, 400/220 kV GIS Pooling Station at Rajera with 400/220 kV 315 MVA ICT-I and ICT-II under Chamera II System and 400 kV S/C Chamera II Pooling Station Transmission Line, 400/220 kV GIS Pooling Station at Rajera with 80 MVAr Bus Reactor at Pooling Point under Chamera II System in the Northern Region. Power Grid Corporation of India Limited
31.08.2025 31.08.2025 Transmission

542


615/MP/2025

30.08.2025 31.08.2025 Misc.

541


433/TL/2025

30.08.2025 31.08.2025 Licence (Transmission)

540


264/MP/2022

30.08.2025 31.08.2025 Misc.

539


78/TL/2025

30.08.2025 31.08.2025 Licence (Transmission)

538


1/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 period and determination of transmission tariff for the 2024-29 period for Transmission Asset: 02 Nos. 400 kV line Bays at Parli (POWERGRID) Switching Station {for Parli New (TBCB)-Parli (POWERGRID) 400 kV D/C (Quad) line under TBCB} and 2 Nos. 765 kV line Bays at Solapur (POWERGRID) Sub-station {for Parli New (TBCB)-Solapur (POWERGRID) 765 kV D/C line under TBCB route} under "POWERGRID works associated with Western Region Strengthening Scheme XV" in the Western Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
28.08.2025 29.08.2025 Transmission

537


512/TD/2024

28.08.2025 29.08.2025 Licence

536


428/TL/2025

28.08.2025 29.08.2025 Licence (Transmission)

535


75/AT/2025

28.08.2025 29.08.2025 Adoption

534


239/AT/2025

26.08.2025 26.08.2025 Adoption

533


312/AT/2025

26.08.2025 26.08.2025 Adoption

532


345/TT/2025

20.08.2025 20.08.2025 Transmission

531


28/TT/2025

20.08.2025 20.08.2025 Transmission

530


127/TT/2024

18.08.2025 20.08.2025 Transmission

529


714/MP/2025

20.08.2025 20.08.2025 Misc.

528


613/MP/2025

20.08.2025 20.08.2025 Misc.

527


273/MP/2023

20.08.2025 20.08.2025 Misc.

526


77/MP/2024

20.08.2025 20.08.2025 Misc.

525


26/TT/2025

16.08.2025 18.08.2025 Transmission

524


557/TD/2025

17.08.2025 18.08.2025 Licence

523


263/MP/2024

16.08.2025 18.08.2025 Misc.

522


475/TT/2024

12.08.2025 14.08.2025 Transmission

521


395/TT/2024

14.08.2025 14.08.2025 Transmission

520


5/TT/2023

Approval under Reg ulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for truing up the transmission tariff for the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Asset-1: 02 number of 220 kV bays at Alipurduar Sub-station and for determination of transmission tariff from COD to 31.3.2024 for transmission, Asset-2: ±800 kV 3000 MW HVDC Pole-III and LILO of Bishwanath Chariali–Agra HVDC line for parallel operation of the HVDC station at Alipurduar and Earth electrode station and Earth Electrode line at Alipurduar and Agra end and ±800 kV 3000 MW HVDC Pole-IV at Alipurduar and Agra, Asset-3: LILO of Bongaigaon-Binaguri (Siliguri) 400 kV D/C line (quad), LILO of Birpara-Salakati 220 kV D/C line, 315 MVA 400/220 kV ICT-I&II and 125 MVAr 400 kV Bus Reactor-I & II alongwith associated bays at Alipurduar HVDC station and Asset-4: 400 kV D/C Alipurduar-Punatsangchung along with associated bays at Alipurduar Sub-station under “Transmission System for development of Pooling Station in Northern part of West Bengal and transfer of power from Bhutan to NR/WR”. Power Grid Corporation of India Limited
14.08.2025 14.08.2025 Transmission

519


586/MP/2025

14.08.2025 14.08.2025 Misc.

518


460/TL/2025

14.08.2025 14.08.2025 Licence (Transmission)

517


456/TD/2025

14.08.2025 14.08.2025 Licence

516


425/MP/2025

14.08.2025 14.08.2025 Misc.

515


373/MP/2023

14.08.2025 14.08.2025 Misc.

514


176/MP/2023

14.08.2025 14.08.2025 Misc.

513


19/MP/2023

14.08.2025 14.08.2025 Misc.

512


553/TD/2025

13.08.2025 13.08.2025 Licence

511


494/TL/2024

13.08.2025 13.08.2025 Licence (Transmission)

510


443/TD/2025

13.08.2025 13.08.2025 Licence

509


215/TT/2025

13.08.2025 13.08.2025 Transmission

508


187/TT/2025

13.08.2025 13.08.2025 Transmission

507


65/MP/2024

13.08.2025 13.08.2025 Misc.

506


469/AT/2025

12.08.2025 13.08.2025 Adoption

505


370/GT/2025

12.08.2025 12.08.2025 Generation

504


7/TT/2023

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019, for the determination of transmission tariff from COD to 31.3.2024 for Asset-A: 2 Nos. 400 kV line bays at 400 kV Mapusa Sub-station (for termination of Xeldem- Mapusa 400 kV D/C (Quad) Line, (Line under TBCB)), and Asset-B: 1x80 MVAr, 420 kV fixed line reactor along with 500 Ohms NGR and its auxiliaries at Narendra (New) (Kudgi- GIS) Sub-stations [for Narendra (New) –Xeldem 400 kV Quad line formed after LILO of one circuit of Narendra (Existing) – Narendra (New) 400 kV D/c quad line at Xeldem] under “POWERGRID works associated with additional 400 kV feed to Goa”. Power Grid Corporation of India Limited
08.08.2025 08.08.2025 Transmission

503


272/TT/2025

07.08.2025 08.08.2025 Transmission

502


468/TL/2025

07.08.2025 08.08.2025 Licence (Transmission)

501


347/MP/2023

07.08.2025 08.08.2025 Misc.

500


186/MP/2021

07.08.2025 08.08.2025 Misc.

499


392/TT/2023

06.08.2025 06.08.2025 Transmission

498


10/RP/2024 in 391/GT/2020

04.08.2025 06.08.2025 Review

497


78/TL/2025

02.08.2025 04.08.2025 Licence (Transmission)

496


442/TL/2025

02.08.2025 04.08.2025 Licence (Transmission)

495


434/AT/2025

02.08.2025 04.08.2025 Adoption

494


433/TL/2025

02.08.2025 04.08.2025 Licence (Transmission)

493


350/TL/2025

02.08.2025 04.08.2025 Licence (Transmission)

492


141/TT/2025

02.08.2025 04.08.2025 Transmission

491


444/TL/2025

31.07.2025 31.07.2025 Licence (Transmission)

490


633/MP/2020

31.07.2025 31.07.2025 Misc.

489


472/TL/2025

31.07.2025 31.07.2025 Licence (Transmission)

488


466/TL/2025

31.07.2025 31.07.2025 Licence (Transmission)

487


464/TL/2025

31.07.2025 31.07.2025 Licence (Transmission)

486


463/TL/2025

31.07.2025 31.07.2025 Licence (Transmission)

485


262/MP/2024

30.07.2025 31.07.2025 Misc.

484


214/TT/2025

Petition for truing up of transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for transmission asset, namely, 02 numbers 400 kV GIS Line Bays at 765/400 kV Varanasi Sub-station under "Construction of 2 numbers 400 kV Hybrid/GIS Line bays at Varanasi (PG) Sub-station" in the Northern Region under Section 62 read with Section 79 (1) (d) of the Electricity Act, 2003 and under Regulation 15 (1) (a) and Regulation 23 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
29.07.2025 29.07.2025 Transmission

483


8/SM/2025

23.07.2025 23.07.2025 Suo-Motu

482


216/TT/2020 (On Remand)

23.07.2025 23.07.2025 Transmission

481


21/TT/2022

23.07.2025 23.07.2025 Transmission

480


169/TT/2025

Approval under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for Tumkur (Pavagada) Pooling Station-Devanahally (KPTCL) 400 kV D/C (Quad) line along with associated bays and equipment’s at Tumkur (Pavagada) Pooling station & Devanahally (KPTCL) under “Additional ATS for Tumur (Pavagada) under Transmission System for Ultra Mega Solar Power Park at Tumkur (Pavgada), Karnataka - Phase II (Part B)” in the Southern Region. Power Grid Corporation of India Limited
22.07.2025 22.07.2025 Transmission

479


461/TT/2024

22.07.2025 22.07.2025 Transmission

478


45/TT/2023

19.07.2025 19.07.2025 Transmission

477


173/TT/2021 with IA No. 92/2023 and 242/TT/2021 with IA No. 91/2023

19.07.2025 19.07.2025 Transmission

476


447/TT/2024

19.07.2025 19.07.2025 Transmission

475


428/TL/2025

19.07.2025 19.07.2025 Licence (Transmission)

474


553/TD/2025

19.07.2025 19.07.2025 Licence

473


456/TD/2025

19.07.2025 19.07.2025 Licence

472


193/TT/2025

17.07.2025 18.07.2025 Transmission

471


328/TT/2025

17.07.2025 18.07.2025 Transmission

470


307/MP/2023

17.07.2025 17.07.2025 Misc.

469


443/TD/2025

17.07.2025 17.07.2025 Licence

468


229/MP/2016 (On remand)

15.07.2025 15.07.2025 Misc.

467


220/MP/2023

13.07.2025 14.07.2025 Misc.

466


241/AT/2025

09.07.2025 10.07.2025 Adoption

465


06/SM/2025

09.07.2025 09.07.2025 Suo-Motu

464


464/TT/2024

08.07.2025 09.07.2025 Transmission

463


463/TT/2024

08.07.2025 09.07.2025 Transmission

462


217/TT/2025

08.07.2025 09.07.2025 Transmission

461


210/TT/2025

08.07.2025 09.07.2025 Transmission

460


461/AT/2025

07.07.2025 08.07.2025 Adoption

459


460/TL/2025

07.07.2025 08.07.2025 Licence (Transmission)

458


223/MP/2023 along with IA.No.53/2023

07.07.2025 08.07.2025 Misc.

457


557/TD/2025

07.07.2025 07.07.2025 Licence

456


329/MP/2024

04.07.2025 04.07.2025 Misc.

455


71/MP/2021

01.07.2025 04.07.2025 Misc.

454


122/MP/2022

01.07.2025 02.07.2025 Misc.

453


462/AT/2025

30.06.2025 30.06.2025 Adoption

452


353/MP/2025

30.06.2025 30.06.2025 Misc.

451


126/MP/2024

30.06.2025 30.06.2025 Misc.

450


83/MP/2025

30.06.2025 30.06.2025 Misc.

449


465/AT/2025

30.06.2025 30.06.2025 Adoption

448


349/AT/2025

30.06.2025 30.06.2025 Adoption

447


33/TT/2023

30.06.2025 30.06.2025 Transmission

446


444/TL/2025

30.06.2025 30.06.2025 Licence (Transmission)

445


442/TL/2025

30.06.2025 30.06.2025 Licence (Transmission)

444


352/TL/2025

30.06.2025 30.06.2025 Licence (Transmission)

443


300/TL/2025

30.06.2025 30.06.2025 Licence (Transmission)

442


473/AT/2025

30.06.2025 30.06.2025 Adoption

441


471/AT/2025

30.06.2025 30.06.2025 Adoption

440


470/TL/2025

30.06.2025 30.06.2025 Licence (Transmission)

439


467/AT/2025

30.06.2025 30.06.2025 Adoption

438


381/TT/2025

29.06.2025 30.06.2025 Transmission

437


472/TL/2025

28.06.2025 29.06.2025 Licence (Transmission)

436


466/TL/2025

28.06.2025 29.06.2025 Licence (Transmission)

435


464/TL/2025

28.06.2025 29.06.2025 Licence (Transmission)

434


463/TL/2025

28.06.2025 29.06.2025 Licence (Transmission)

433


453/MP/2025 along with 39/IA/2025 and 455/MP/2025 along with 41/IA/2025

27.06.2025 28.06.2025 Misc.

432


251/TL/2025

27.06.2025 27.06.2025 Licence (Transmission)

431


168/MP/2019
(On remand)

20.06.2025 26.06.2025 Misc.

430


344/MP/2020

20.06.2025 25.06.2025 Misc.

429


101/MP/2017
(On remand)

25.06.2025 25.06.2025 Misc.

428


150/TT/2024

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 1999 and determination of the transmission tariff from the COD to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: Conversion of 240 MVAr Non-switchable Line reactor at Raipur Pooling Station (associated with Raipur Pooling Station -Champa Pooling Station 765 kV Ckt-1) into Switchable Line reactor along with NGR bypass arrangement and Asset-2: Conversion of 240 MVAr Non-switchable Line reactor at Raipur Pooling Station (associated with Raipur Pooling Station -Champa Pooling Station 765 kV Ckt-2) into Switchable Line reactor along with NGR bypass arrangement under “Western Region Expansion Scheme- XXIV (WRES-XXIV)” in the Western Region. Power Grid Corporation of India Limited
24.06.2025 24.06.2025 Transmission

427


350/TL/2025

23.06.2025 24.06.2025 Misc.

426


382/MP/2023

23.06.2025 23.06.2025 Misc.

425


182/TT/2024

Approval of transmission tariff under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for determination of Transmission Tariff from proposed COD to 31.3.2024 for Transmission Assets: Asset-1: 4 nos. of 220 kV line bays at Khatkar (Jind) Sub-station for LILO of both circuit of 220 kV Jind HVPNL to PTPS D/C line at 400 kV PGCIL Khatkar (Jind) Sub-station and Asset-2: 2 nos. of 220 kV line bays at Naggal (Panchkula) Sub-station for 220 kV D/C line from 400 kV PGCIL (Panchkula) to proposed 220 kV Sub-station Sadhaura under “220 kV Bays at 400 kV Sub-station PG Khatkar (Jind) & Naggal (Panchkula) Sub-station”. Power Grid Corporation of India Limited
20.06.2025 23.06.2025 Transmission

424


13/MP/2024 and 39/MP/2024

20.06.2025 23.06.2025 Misc.

423


87/AT/2025

19.06.2025 19.06.2025 Adoption

422


240/AT/2025

19.06.2025 19.06.2025 Adoption

421


148/MP/2024

19.06.2025 19.06.2025 Misc.

420


86/AT/2025

19.06.2025 19.06.2025 Adoption

419


20/RP/2023 in 698/GT/2020

18.06.2025 18.06.2025 Review

418


630/MP/2025

18.06.2025 18.06.2025 Misc.

417


Corrigendum to 181/GT/2019

16.06.2025 16.06.2025 Generation

416


9/TT/2023

13.06.2025 13.06.2025 Adoption

415


253/MP/2024

12.06.2025 12.06.2025 Misc.

414


276/MP/2024

12.06.2025 12.06.2025 Misc.

413


242/AT/2025

12.06.2025 12.06.2025 Adoption

412


309/MP/2025

12.06.2025 12.06.2025 Misc.

411


237/TL/2025

11.06.2025 11.06.2025 Licence (Transmission)

410


362/TD/2025

11.06.2025 11.06.2025 Licence

409


252/TL/2025

11.06.2025 11.06.2025 Licence (Transmission)

408


12/RP/2024 in 391/GT/2020

10.06.2025 10.06.2025 Review

407


247/TL/2025

08.06.2025 09.06.2025 Licence (Transmission)

406


424/TL/2024

06.06.2025 06.06.2025 Licence (Transmission)

405


87/MP/2024

05.06.2025 06.06.2025 Misc.

404


187/TT/2024

04.06.2025 04.06.2025 Transmission

403


324/TT/2023

31.05.2025 02.06.2025 Transmission

402


153/MP/2021

02.06.2025 02.06.2025 Misc.

401


185/TT/2024

01.06.2025 02.06.2025 Transmission

400


88/AT/2025

30.05.2025 30.05.2025 Adoption

399


351/AT/2025

30.05.2025 30.05.2025 Adoption

398


500/MP/2024

30.05.2025 30.05.2025 Misc.

397


439/MP/2024

Petition under Section 17 (1) and 17(3) of Electricity Act, 2003 (‘the Act’) for amalgamation/merger of Powergrid Khavda II-B Transmission Limited, Powergrid Khavda RE Transmission System Limited, Powergrid KPS2 Transmission System Limited, Powergrid KPS3 Transmission Limited, Powergrid ERWR Power Transmission Limited, Powergrid Raipur Pool Dhamtari Transmission Limited, Powergrid Dharamjaigarh Transmission Limited, Powergrid Bhadla Sikar Transmission Limited, Powergrid Ananthpuram Kurnool Transmission Limited, Powergrid Neemrana Bareilly Transmission Limited, Powergrid Koppal Gadag Transmission Limited, Powergrid Bidar Transmission Limited and Powergrid Khavda II-C Transmission Limited and assignment/ transfer of Transmission Licences pursuant to amalgamation/merger. 1. POWERGRID KHAVDA II-B Transmission Limited, 2. POWERGRID KHAVDA RE Transmission System Limited, 3. POWERGRID KPS2 Transmission System Limited and others
30.05.2025 30.05.2025 Misc.

396


311/MP/2025

30.05.2025 30.05.2025 Misc.

395


21/TT/2025

30.05.2025 30.05.2025 Transmission

394


243/AT/2025

30.05.2025 30.05.2025 Adoption

393


198/TT/2025

29.05.2025 30.05.2025 Transmission

392


265/MP/2021

30.05.2025 30.05.2025 Misc.

391


183/TT/2024

29.05.2025 30.05.2025 Transmission

390


352/TL/2025

29.05.2025 29.05.2025 Licence (Transmission)

389


246/MP/2024

29.05.2025 29.05.2025 Misc.

388


140/MP/2024

29.05.2025 29.05.2025 Misc.

387


124/MP/2017

29.05.2025 29.05.2025 Misc.

386


319/MP/2025

26.05.2025 29.05.2025 Misc.

385


300/TL/2025

26.05.2025 29.05.2025 Licence (Transmission)

384


299/AT/2025

26.05.2025 29.05.2025 Adoption

383


253/AT/2025

26.05.2025 29.05.2025 Adoption

382


251/TL/2025

26.05.2025 29.05.2025 Licence (Transmission)

381


250/AT/2025

26.05.2025 29.05.2025 Adoption

380


66/MP/2023

29.05.2025 29.05.2025 Misc.

379


391/TT/2025

29.05.2025 29.05.2025 Transmission

378


309/TT/2023 alongwith I.A. No. 87/2023

29.05.2025 29.05.2025 Transmission

377


86/TT/2024

29.05.2025 29.05.2025 Transmission

376


371/MP/2022

26.05.2025 26.05.2025 Misc.

375


494/TL/2024

24.05.2025 25.05.2025 Licence (Transmission)

374


493/AT/2024

24.05.2025 25.05.2025 Adoption

373


237/TL/2025

24.05.2025 25.05.2025 Licence (Transmission)

372


236/AT/2025

24.05.2025 25.05.2025 Adoption

371


326/TT/2023

23.05.2025 25.05.2025 Transmission

370


252/TL/2025

23.05.2025 25.05.2025 Licence (Transmission)

369


362/TD/2025

24.05.2025 24.05.2025 Licence

368


161/MP/2022

22.05.2025 23.05.2025 Misc.

367


205/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and determination of the transmission tariff for the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for transmission asset 400/220/33 kV, 500 MVA ICT-4 along with associated bays at Amritsar (PG) Sub-station under Additional 1X500 MVA, 400/220 kV (4th) transformer at Amritsar (Balachak) Sub-station under ISTS. Power Grid Corporation of India Limited
22.05.2025 23.05.2025 Transmission

366


57/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for Asset-1: Conversion of existing 2x63 MVAR line reactors at Bhachau end of Bhachau- EPGL 400 kV D/C line to Switchable Line Reactor along with Western Region Strengthening Scheme – 21 and Asset-2: 1 No. 220 kV GIS Line bays at Bhuj Substation associated with Part-B: Extension works at Bhuj Pooling Station for interconnection of RE projects in the Western Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
19.05.2025 20.05.2025 Transmission

365


263/MP/2023

19.05.2025 19.05.2025 Misc.

364


62/AT/2025

19.05.2025 19.05.2025 Adoption

363


306/MP/2022 With IA Nos. 20/2023, 85/2023 & 16/2024

19.05.2025 19.05.2025 Misc.

362


246/AT/2025

15.05.2025 15.05.2025 Adoption

361


247/TL/2025

14.05.2025 15.05.2025 Licence (Transmission)

360


248/AT/2025

15.05.2025 15.05.2025 Adoption

359


322/TL/2024

13.05.2025 14.05.2025 Licence (Transmission)

358


319/AT/2024

13.05.2025 14.05.2025 Adoption

357


19/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of transmission tariff for the 2024-29 tariff period for Combined Assets under “Transmission System associated with Substation works associated with System Strengthening in the Southern Region for Import of Power from Eastern Region” in the Southern Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
13.05.2025 13.05.2025 Transmission

356


17/TT/2025

13.05.2025 13.05.2025 Transmission

355


187/MP/2022 along with 70/IA/2022

08.05.2025 09.05.2025 Misc.

354


353/TT/2023

07.05.2025 07.05.2025 Transmission

353


498/TD/2024

05.05.2025 06.05.2025 Licence

352


174/MP/2024

05.05.2025 05.05.2025 Misc.

351


184/TT/2025

Approval under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for Asset-I: 400 kV D/C Lara STPS-I to Raigarh (Kotra) Pooling Station Transmission Line along with associated bays at Raigarh (Kotra) Pooling Station and Asset-II: 400 kV D/C (Quad) Lara STPS-I - Champa Transmission Line along with associated bays at Champa Pooling Station under “Transmission System associated with Lara STPS-I (2x800 MW) Generation Project of NTPC” in the Western Region. Power Grid Corporation of India Limited
02.05.2025 05.05.2025 Transmission

350


281/GT/2020

02.05.2025 02.05.2025 Generation

349


457/TT/2024

01.05.2025 02.05.2025 Transmission

348


132/TT/2023

Approval under Regulation 86 of CERC (Conduct of Business) Regulations,1999 and CERC (Terms and Conditions of Tariff) Regulations, 2019 for the determination of transmission tariff from COD to 31.3.2024 for Asset-I: Combined Asset of (1) LILO of one circuit of Bamnauli-Jattikalan 400 kV D/C line along with associated bays at Dwarka-I Sub-station, (2) 400/200 kV, 500 MVA ICT-I, II & III along with associated bays at Dwarka-I Sub-station, (3) 400 kV, 125 MVAR bus reactor along with associated bay at Dwarka-I Sub-station; Asset-II: 400/200 kV, 500 MVA ICT-IV along with associated bays at Dwarka-I Sub-station; Asset-III: LILO of circuit-2 of 400 kV D/C Bawana-Mandola line at Maharanibagh Sub-station along with associated bays; Asset-IV: LILO of circuit-1 of 400 kV D/C Bawana-Mandola line at Maharanibagh Sub-station along with associated bays; and Asset-V: By passing of LILO of one circuit of 400 kV Dadri–Ballabhgarh D/C line at Maharanibagh (existing) (to be used during emergency) under “Creation of 400/220 kV Sub-stations in NCT of Delhi during 12th plan period (Part-A)” in the Northern Region. Power Grid Corporation of India Limited
01.05.2025 02.05.2025 Transmission

347


85/TT/2025

29.04.2025 30.04.2025 Transmission

346


132/TT/2025

29.04.2025 30.04.2025 Transmission

345


89/MP/2024

29.04.2025 30.04.2025 Misc

344


73/TT/2024

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 for truing-up of the transmission tariff for the 2009-14 tariff period, the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 for truing-up of the transmission tariff for the 2014-19 tariff period, and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for determination of the transmission tariff for the 2019-24 tariff period in respect of: Asset-I: 132 kV D/C Umtru- Sarusajai 17.72 km, Double Circuit-Single Conductor (COD: 1.4.1990), Asset-II: 132 kV D/C Kahelipara-Umtru 11.68 km, Double Circuit- Single Conductor (COD: 1.4.1960), Asset-III: 132 kV Panchgram-Lumshnong 23.80 km, Single Circuit-Single Conductor (COD: 1.4.1960), Asset-IV: 220 kV D/C Misa-Killing, 113.42 km, Double Circuit- Single Conductor (COD: 25.1.2011), and Asset-V: LILO of the 400 kV D/C Pallatana-Bongaigaon at 400/220 kV Killing Sub-station, 2.324 km (COD:22.2.2015). Meghalaya Power Transmission Corporation Limited
28.04.2025 29.04.2025 Transmission

343


6/TT/2025

Petition for truing up of transmission tariff for the 2019-24 tariff period and determination of transmission tariff for the 2024-29 tariff block for Asset-A: 1 number 765 kV line bay at 765/400 kV Bilaspur Pooling Station for Sipat STPS (NTPC) - Bilaspur PS (PG) 765 kV 3rd S/C) and Asset-B: 2 Numbers 765 kV line bays at 765/400 kV Bilaspur Pooling Station (POWERGRID) for Bilaspur PS (PG)-Rajnandgaon(TBCB) 765 kV D/C line along with 2 Numbers 240 MVAR, 765 kV Switchable Line Reactors at 765/400 kV Bilaspur Pooling Station end under “POWERGRID Works associated with Additional System Strengthening for Sipat STPS” in Western Region under Section 62 read with Section 79 (1) (d) of the Electricity Act, 2003 and under Regulation 15 (1) (a) and Regulation 23 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
28.04.2025 29.04.2025 Transmission

342


175/TL/2025

28.04.2025 28.04.2025 Licence (Transmission)

341


63/TL/2025

28.04.2025 28.04.2025 Licence (Transmission)

340


8/SM/2024

28.04.2025 28.04.2025 Suo-Motu

339


297/TD/2025

26.04.2025 26.04.2025 Licence

338


313/TD/2025

26.04.2025 26.04.2025 Licence

337


298/TL/2025

26.04.2025 26.04.2025 Licence (Transmission)

336


518/RC/2024

26.04.2025 26.04.2025 Misc.

335


460/TT/2024

21.04.2025 23.04.2025 Transmission

334


176/AT/2025

22.04.2025 23.04.2025 Adoption

333


1/TT/2022

21.04.2025 21.04.2025 Transmission

332


Corrigendum to 94/TT/2024

Corrigendum to the order dated 25.10.2024 in Petition No. 94/TT/2024 - Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for the determination of transmission tariff from COD to 31.3.2024 for Asset 1- Reconductoring of 400 kV Kolhapur (PG) - Kolhapur (MSETCL) TL - Ckt 1 along with upgradation of 400 kV bays at Kolhapur (MSETCL) substation and Asset 2- Reconductoring of 400 kV Kolhapur (PG)- Kolhapur (MSETCL) TL - Ckt 2 along with upgradation of 400 kV bays at Kolhapur (MSETCL) substation under “Transmission system strengthening beyond Kolhapur for export of power from Solar & Wind energy zones in Southern Region - Re-conductoring of Kolhapur (PG) - Kolhapur 400 kV D/c line”. Power Grid Corporation of India Limited
21.04.2025 21.04.2025 Adoption

331


131/MP/2024

20.04.2025 21.04.2025 Misc.

330


202/MP/2024

17.04.2025 17.04.2025 Misc.

329


11/RP/2024 in 23/GT/2017

17.04.2025 17.04.2025 Review

328


Corrigendum to 349/TT/2023

17.04.2025 17.04.2025 Transmission

327


35/TT/2025

16.04.2025 16.04.2025 Transmission

326


5/SM/2025

11.04.2025 15.04.2025 Suo-Motu

325


Corrigendum to 323/TT/2023

Corrigendum to the order dated 18.12.2024 in Petition No. 323/TT/2023 - Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and truing up of transmission tariff of 2014-19 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and determination of transmission tariff of 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 for Asset 1: OPGW link for Betul-Khandwa under Central Sector, Asset 2: OPGW link (125 km) for Mauda-Wardha under Central Sector, Asset 3: 6 numbers OPGW link (92.66 km) under State Sector, Asset 4A: 3 numbers OPGW link (656.926 km) under Central Sector, Asset 4B: OPGW link for Korba-Birsinghpur under Central Sector, Asset 5A: OPGW link (15.462 km) for 400 kV Xeldom-Madgaon under State sector, Asset 5B: OPGW link for 400 kV Vapi–Magarwada under Central Sector and Asset 6: 9 numbers of OPGW link under State Sector-OPGW link (169 km) associated with “Establishment of Fibre Optic Communication System in the Western Region under Master Communication Plan (Additional Requirement)” in the Western Region. Power Grid Corporation of India Limited
15.04.2025 15.04.2025 Transmission

324


459/TT/2024

13.04.2025 15.04.2025 Transmission

323


297/TD/2025

11.04.2025 15.04.2025 Licence

322


136/TT/2025

11.04.2025 13.04.2025 Transmission

321


289/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Assets comprising of Asset-A1 : 765 kV Line bay & 3x80 MVAR line reactor at 765 kV Vadodara GIS for Vadodara-Dhule transmission line (IPTC) and Asset-B1 : 765 kV line Bays & 3*80 MVAR Switchable line Reactor at 765 kV Jabalpur Pooling Substation (for 765 kV S/C Jabalpur-Bhopal line), Asset-B2: 765 kV Line BAYS & 3*80 MVAR line reactor at 765 kV Indore S/S (for 765 kV S/C Bhopal-Indore line) and Asset-B3: Extension of 765 kV Aurangabad Sub-station for 765 kV S/C line bay under “Line bays and Reactor Provisions at POWERGRID Sub-stations associated with System Strengthening in the Western Region”. Power Grid Corporation of India Limited
11.04.2025 13.04.2025 Transmission

320


298/TL/2025

11.04.2025 11.04.2025 Licence (Transmission)

319


175/TL/2025

11.04.2025 11.04.2025 Licence (Transmission)

318


313/TD/2025

09.04.2025 09.04.2025 Licence

317


394/MP/2025

09.04.2025 09.04.2025 Misc.

316


292/TT/2025

09.04.2025 09.04.2025 Transmission

315


33/TT/2025

09.04.2025 09.04.2025 Transmission

314


418/MP/2024

07.04.2025 07.04.2025 Misc.

313


376/GT/2020

07.04.2025 07.04.2025 Generation

312


295/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for the “Unified Load Despatch & Communication Scheme (POWERGRID portion i.e. Communication System portion and SLDC System retained by the Petitioner after formation of POSOCO)” in the Western Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
06.04.2025 07.04.2025 Transmission

311


34/TT/2025

06.04.2025 07.04.2025 Transmission

310


207/TT/2025

06.04.2025 07.04.2025 Transmission

309


285/TT/2025

Approval under sub section (4) of Section 28 and Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 period and determination of the transmission tariff for the 2024-29 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 period for the assets under “Fibre Optic Communication System (847.124 km) in lieu of existing Unified Load Dispatch and Communication (ULDC) Microwave links” in the Southern Region. Power Grid Corporation of India Limited
06.04.2025 07.04.2025 Transmission

308


29/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for asset “ 2 nos. 400 kV line bays at Muzaffarpur Sub-station for termination of Muzaffarpur (PG)-Darbhanga (TBCB) 400 kV D/C (Triple snowbird) line under "Eastern Region Strengthening Scheme VI Project" in Eastern Region. Power Grid Corporation of India Limited
06.04.2025 07.04.2025 Transmission

307


107/TT/2025

02.04.2025 03.04.2025 Transmission

306


152/MP/2024

31.03.2025 31.03.2025 Misc.

305


294/TT/2025

30.03.2025 31.03.2025 Transmission

304


286/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for the “Unified Load Dispatch & Communication Scheme (POWERGRID portion i.e. Communication System portion and SLDC System retained by the Petitioner after the formation of POSOCO)” in the Southern Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
30.03.2025 30.03.2025 Transmission

303


3/TT/2025

30.03.2025 30.03.2025 Transmission

302


357/MP/2023
66/GT/2024

30.03.2025 30.03.2025 Misc.

301


305/MP/2024 along with IA No. 76/2024
306/MP/2024 along with IA No. 77/2024

Petition under Sections 79 & 94 of the Electricity Act read with applicable provisions of the Central Electricity Regulatory Commission (Connectivity and General Network Access to the Inter-State Transmission System) regulations, 2022, along with Regulation 65-69 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations 2023, seeking the humble indulgence of this Commission concerning the limited directions issued vide the Order dated 21.04.2024 in Petition No. 291/MP/2023 read with Order dated 04.05.2024 passed in IA (Diary) No. 230 of 2024 in Petition No. 291/MP/2023 in relation to achieving the Financial Closure and Scheduled Commissioning of the Gadag 300 MW project and consequentially to seek an extension of time for compliance with the said limited direction(s). SolarOne Energy Private Limited
30.03.2025 30.03.2025 Misc.

300


333/MP/2024 along with IA 82/2024

30.03.2025 30.03.2025 Misc.

299


497/MP/2024

30.03.2025 30.03.2025 Misc.

298


361/RC/2025

30.03.2025 30.03.2025 Misc.

297


306/RC/2025

30.03.2025 30.03.2025 Misc.

296


181/TT/2025

29.03.2025 30.03.2025 Transmission

295


274/TT/2025

28.03.2025 30.03.2025 Transmission

294


291/TT/2025

29.03.2025 30.03.2025 Transmission

293


83/MP/2024

29.03.2025 30.03.2025 Misc.

292


9/RP/2015 in 68/MP/2013

29.03.2025 29.03.2025 Review

291


2/SM/2025

29.03.2025 29.03.2025 Suo-Motu

290


468/TT/2024

28.03.2025 28.03.2025 Transmission

289


372/MP/2023

28.03.2025 28.03.2025 Misc.

288


455/TT/2024

28.03.2025 28.03.2025 Transmission

287


282/MP/2024, along with IA.No.70/2024

27.03.2025 27.03.2025 Misc.

286


288/TT/2025

27.03.2025 27.03.2025 Transmission

285


287/TT/2025

27.03.2025 27.03.2025 Transmission

284


222/TT/2025

27.03.2025 27.03.2025 Transmission

283


103/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 period and determination of the transmission tariff for the 2024-29 period for Combined Assets: 765/400 kV ,1500 MVA ICT-1 & ICT-2 along with associated bays at Dharamjaygarh substation under Supplementary Transmission Scheme of IPP Projects in Chhattisgarh in the Western Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
27.03.2025 27.03.2025 Transmission

282


293/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for Asset-I: New EMS/SCADA at SLDCs of UPPTCL, RRVPNL, DTL, HVPNL, BBMB, PSPTCL, HPSEBL and J&K PDD, Asset-II: New EMS/SCADA at SLDCs of UPPTCL and J&K PDD under “Expansion and Replacement of existing SCADA/EMS System at SLDC’s of the Northern Region (NRULDC Phase-II)”. Power Grid Corporation of India Limited
27.03.2025 27.03.2025 Transmission

281


290/TT/2025

27.03.2025 27.03.2025 Transmission

280


361/GT/2020

27.03.2025 27.03.2025 Generation

279


465/TT/2024

27.03.2025 27.03.2025 Transmission

278


487/TL/2024

27.03.2025 27.03.2025 Licence (Transmission)

277


471/TT/2024

27.03.2025 27.03.2025 Transmission

276


470/TT/2024

27.03.2025 27.03.2025 Transmission

275


69/TL/2025

26.03.2025 26.03.2025 Licence (Transmission)

274


71/TL/2025

26.03.2025 26.03.2025 Licence (Transmission)

273


498/TD/2024

26.03.2025 26.03.2025 Licence

272


507/TL/2024

26.03.2025 26.03.2025 Licence (Transmission)

271


509/TL/2024

26.03.2025 26.03.2025 Licence (Transmission)

270


89/MP/2025

25.03.2025 26.03.2025 Misc.

269


122/TT/2025

25.03.2025 26.03.2025 Transmission

268


16/RP/2023 in 392/GT/2020

24.03.2025 26.03.2025 Review

267


29/RP/2023 in 441/GT/2020

24.03.2025 26.03.2025 Review

266


491/TL/2024

25.03.2025 25.03.2025 Licence (Transmission)

265


377/MP/2023

24.03.2025 25.03.2025 Misc.

264


129/MP/2024

24.03.2025 25.03.2025 Misc.

263


275/MP/2024 along with IA 64/2024

24.03.2025 25.03.2025 Misc.

262


196/MP/2024

24.03.2025 25.03.2025 Misc.

261


452/TT/2024

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset-A consisting of Combined Element-1: (i) 400 kV D/C RAPP-Kankroli Transmission Line along with associated bays, (ii) 50 MVAR Bus Reactor along with associated bays at Kankroli Sub-station, and (iii) 400 kV S/C RAPP-Kota Transmission Line along with 80 MVAR Bus Reactor and Combined Element-2: (i) 400/220 kV 315 MVA ICT-II along with associated bays & two nos. 220 kV line bays at Kankroli Sub-station, (ii) 400/220 kV 315 MVA ICT-I along with associated bays & 2 nos. 220 kV line bays at Kankroli Sub-station, and (iii) 400/220 kV 315 MVA ICT-I and ICT-II at Kota Sub-station and 400/220 kV 315 MVA ICT-III at Kankroli Sub-station along with associated bays at Kota and Kankroli Sub-stations respectively under “Transmission System associated with RAPP 5&6” in the Northern Region. Power Grid Corporation of India Limited
24.03.2025 24.03.2025 Transmission

260


472/TT/2024

24.03.2025 24.03.2025 Transmission

259


429/MP/2024

Petition for approval under Section 17 (3) and Section 17 (4) of the Electricity Act, 2003 read with the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2024 for creation of security interest by way of hypothecation, charge or assignment over rights, title, interest, claims, demands, benefits under, clearance, project documents (except fixed assets), agreements and approvals of Kohima Mariani Transmission Limited in favour of the Debenture Trustee, i.e., Axis Trustee Services Limited and for approval of documents creating security and of other documents in relation to the financing of the Transmission Project build, owned, operated and maintained by Kohima Mariani Transmission Limited. Kohima-Mariani Transmission Limited
24.03.2025 24.03.2025 Misc.

258


205/MP/2022

24.03.2025 24.03.2025 Misc.

257


346/GT/2023

23.03.2025 24.03.2025 Generation

256


134/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset consisting of Asset-1: 315 MVA 400/220 kV Spare Inter-Connecting Transformer at 400/220 kV Hisar Sub-station, Asset-2: 315 MVA 400/220 kV Spare Inter-Connecting Transformer at 400/220 kV Lucknow Substation; and Asset-3: 315 MVA, 400/220 kV ICT at Bhiwadi in the Northern Region under “Provision of spare ICTs and reactors in the Eastern, Northern, Southern and Western Regions”. Power Grid Corporation of India Limited
24.03.2025 24.03.2025 Transmission

255


213/TT/2025

24.03.2025 24.03.2025 Transmission

254


402/AT/2024

24.03.2025 24.03.2025 Adoption

253


175/GT/2024

20.03.2025 24.03.2025 Generation

252


224/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for the Combined Asset comprised of (i) 765 kV S/C Bina-Gwalior transmission line, (ii) 315 MVA, 400/220/33 kV ICT-I along with associated bays at Gwalior Substation, (iii) LILO of 400 kV S/C Korba-Raipur line at Bhatapara Substation along with associated bays, (iv) 400 kV Khandwa Rajgarh Circuit-II along with associated bays and 765/400 kV ICT-III at Seoni Substation, (v) 400 kV Khandwa-Rajgarh Circuit-I along with associated bays and 63 MVAR bus reactor at Bina Substation, Asset-II: 400 kV ICT-II at Gwalior Substation; and Asset-III: 400/220 kV ICT-II at Bhatapara Substation under the “Sipat-II transmission system” in the Western Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
22.03.2025 24.03.2025 Transmission

251


338/MP/2022 Alongwith I.A. No. 57/2023

22.03.2025 24.03.2025 Misc.

250


326/MP/2025

23.03.2025 23.03.2025 Misc.

249


473/TT/2024

23.03.2025 23.03.2025 Transmission

248


158/TT/2025

23.03.2025 23.03.2025 Transmission

247


2/TT/2025

23.03.2025 23.03.2025 Transmission

246


179/MP/2016

22.03.2025 22.03.2025 Misc.

245


64/AT/2025

22.03.2025 22.03.2025 Adoption

244


6/RP/2024 in 223/GT/2021

22.03.2025 22.03.2025 Review

243


118/TT/2025

22.03.2025 22.03.2025 Transmission

242


63/TL/2025

22.03.2025 22.03.2025 Licence (Transmission)

241


451/TT/2024

Approval under Section 62 read with Section 79 (1) (d) of the Electricity Act, 2003, and under Regulation 15 (1) (a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Condition of Tariff Regulations) 2019 and the Central Electricity Regulatory Commission (Terms and Condition of Tariff Regulations) 2024 for truing up of transmission tariff for the 2019-24 and determination of transmission tariff for the 2024-29 tariff period for Combined Asset comprising Asset-I: 1x315 MVA, 400/220 kV Transformer at Nalagarh; Asset-II: 1x315 MVA, 400/220 kV Transformer at Abdullahpur; Asset III: 1x500 MVA, 400/220 kV Transformer at Amritsar; and Asset IV: 4x105 MVA, 400/220 kV Single Phase Transformers at Kishenpur under “Augmentation of Transformation Capacity (Part-I) in Northern and Eastern Region” . Power Grid Corporation of India Limited
22.03.2025 22.03.2025 Transmission

240


506/MP/2024

21.03.2025 22.03.2025 Misc.

239


489/TL/2024

21.03.2025 22.03.2025 Licence (Transmission)

238


361/TT/2018 and
93/TT/2020 (Remand back from APTEL)

21.03.2025 21.03.2025 Transmission

237


38/MP/2023

20.03.2025 21.03.2025 Misc.

236


227/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for the “Combined Asset consisting of Asset-I: 315 MVA, 400/220/33 kV 3-Phase Spare ICT at Raipur Sub-station; Asset-II: 315 MVA, 400/220/33 kV 3-Phase Spare ICT at Pune Sub-station; Asset-III: 420 kV, 80 MVAR 3-Phase Shunt Reactor at Wardha Sub-station; Asset-IV: 315 MVA, 400/220/33 kV 3-Phase Spare Transformer at Dehgam Sub-station; Asset-V: 315 MVA, 400/220/33 kV 3-Phase Spare Transformer at Jabalpur; Asset-VI: 400 kV, 125 MVAR 3-Phase Spare Reactor at Itarsi under provision of Spare ICTs and Reactors” in the Western Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
20.03.2025 21.03.2025 Transmission

235


148/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset consisting of Asset-I: Ckt-III of 400 kV D/C Vindhyachal-Satna Transmission Line alongwith associated bays; Asset-II: 400/220 kV, 315 MVA ICT-II at Satna Sub-station; Asset-III: Ckt-IV of 400 kV D/C Vindhyachal-Satna line along with associated bays; Asset-IV: LILO of 400 kV Satna-Bina Ckt-I & II at Bina (POWERGRID) Sub-station; Asset-V: Circuit IV of 400 kV D/C Satna-Bina Transmission Line; Asset-VI: Circuit III of 400 k V D/C Satna-Bina Transmission Line; Asset-VII: LILO of 400 kV D/C Raipur-Rourkela Transmission Line alongwith associated bays; Asset-VIII: 400/220 kV, 315 MVA ICT-II along with associated bay equipment at Raigarh Sub-station under “Vindhyachal-III Transmission System”” in the Western Region. Power Grid Corporation of India Limited
20.03.2025 21.03.2025 Transmission

234


138/TT/2025

20.03.2025 21.03.2025 Transmission

233


125/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for the “Combined Asset: 400 kV D/C Twin Conductor Kanpur-Ballabgarh transmission line along with its associated bays; and 40% FSC at Ballabgarh on 400 kV D/C Kanpur-Ballabgarh transmission line covered under the Northern Region System Strengthening Scheme-IX” in the Northern Region” under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
20.03.2025 21.03.2025 Transmission

232


404/AT/2024

20.03.2025 21.03.2025 Adoption

231


174/MP/2025

21.03.2025 21.03.2025 Misc.

230


264/MP/2024

20.03.2025 21.03.2025 Misc.

229


111/TT/2025

20.03.2025 20.03.2025 Transmission

228


223/TT/2025

20.03.2025 20.03.2025 Transmission

227


366/AT/2024

20.03.2025 20.03.2025 Adoption

226


486/TL/2024

20.03.2025 20.03.2025 Licence (Transmission)

225


237/MP/2023

19.03.2025 20.03.2025 Misc.

224


508/AT/2024

19.03.2025 20.03.2025 Adoption

223


125/MP/2024 with IA 21/2024

20.03.2025 20.03.2025 Misc.

222


181/GT/2019

20.03.2025 20.03.2025 Generation

221


110/TT/2025

20.03.2025 20.03.2025 Transmission

220


160/MP/2015

17.03.2025 20.03.2025 Misc.

219


230/TT/2025

20.03.2025 20.03.2025 Transmission

218


450/TT/2024

19.03.2025 20.03.2025 Transmission

217


277/MP/2025

20.03.2025 20.03.2025 Misc.

216


228/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for “125 MVAR Bus Reactor at 400/220 kV Rajgarh Sub-station along with associated Bays at Rajgarh” under “Installation of 125 MVAR Bus Reactor at 400 kV Rajgarh Sub-station” in the Western Region. Power Grid Corporation of India Limited
19.03.2025 19.03.2025 Transmission

215


32/TT/2025

18.03.2025 19.03.2025 Transmission

214


220/TT/2025

19.03.2025 19.03.2025 Transmission

213


229/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset comprising of “400 kV D/C Ranchi-Sipat Transmission Line with associated bays at Ranchi and Sipat Sub-stations and 40% FSC on 400 kV Ranchi-Sipat Transmission Line at Ranchi Sub-station under Kahalgaon-II, Phase II Transmission System” in the Western Region. Power Grid Corporation of India Limited
19.03.2025 19.03.2025 Transmission

212


209/TT/2025

19.03.2025 19.03.2025 Transmission

211


218/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset comprising of Asset-1: Kalpakkam PFBR-Sirucheri 230 kV D/C Line and Asset-2: Kalpakkam PFBR-Arani 230 kV D/C Line, and Asset-3: Kalpakkam PFBR-Kanchipuram 230 kV D/C Line under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in the Southern Region. Power Grid Corporation of India Limited
19.03.2025 19.03.2025 Transmission

210


278/MP/2025

19.03.2025 19.03.2025 Misc.

209


510/AT/2024

19.03.2025 19.03.2025 Adoption

208


120/TT/2025

18.03.2025 19.03.2025 Transmission

207


76/TT/2025

18.03.2025 19.03.2025 Transmission

206


20/TT/2025

18.03.2025 19.03.2025 Transmission

205


24/TT/2025

18.03.2025 19.03.2025 Transmission

204


226/TT/2025

18.03.2025 19.03.2025 Transmission

203


109/TT/2025

18.03.2025 19.03.2025 Transmission

202


420/AT/2024

18.03.2025 18.03.2025 Adoption

201


220/MP/2019
and 267/MP/2019

18.03.2025 18.03.2025 Adoption

200


182/TT/2025

18.03.2025 18.03.2025 Adoption

199


223/AT/2024

18.03.2025 18.03.2025 Adoption

198


388/GT/2023

18.03.2025 18.03.2025 Generation

197


119/GT/2023

18.03.2025 18.03.2025 Generation

196


108/TT/2025

17.03.2025 18.03.2025 Transmission

195


262/TL/2023

17.03.2025 17.03.2025 Licence (Transmission)

194


132/MP/2024 along with IA.No.95/2024

17.03.2025 17.03.2025 Misc.

193


46/MP/2024

17.03.2025 17.03.2025 Misc.

192


25/RP/2024 in
387/GT/2020

17.03.2025 17.03.2025 Review

191


72/AT/2025

17.03.2025 17.03.2025 Adoption

190


11/TT/2025

17.03.2025 17.03.2025 Transmission

189


479/TT/2024

17.03.2025 17.03.2025 Transmission

188


156/TT/2025

17.03.2025 17.03.2025 Transmission

187


212/TT/2025

17.03.2025 17.03.2025 Transmission

186


249/MP/2025

16.03.2025 17.03.2025 Adoption

185


77/MP/2025

17.03.2025 17.03.2025 Misc.

184


167/MP/2025
172/MP/2025

17.03.2025 17.03.2025 Misc.

183


136/GT/2024

16.03.2025 17.03.2025 Generation

182


84/TD/2025

16.03.2025 17.03.2025 Licence

181


211/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the “Combined Asset of 1X125 MVAr Bus Reactor at Khandwa along with associated bays and 1X125 MVAr Bus Reactor at Dehgam along with associated bays” under “Western Region System Strengthening Scheme VII” in the Western Region. Power Grid Corporation of India Limited
16.03.2025 17.03.2025 Transmission

180


81/TT/2025

16.03.2025 17.03.2025 Transmission

179


13/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and Regulations 15(1)(a) and 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the determination of transmission tariff of the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the asset 400 kV D/C Kota-Merta Transmission Line (Ckts.-I and II) along with associated bays under System Strengthening in South West Part of Northern Grid (Part-A) Transmission System in Northern Region. Power Grid Corporation of India Limited
16.03.2025 17.03.2025 Transmission

178


130/TT/2025

16.03.2025 17.03.2025 Transmission

177


361/MP/2024

17.03.2025 17.03.2025 Misc.

176


Corrigendum to 256/GT/2020

17.03.2025 17.03.2025 Generation

175


241/MP/2024 along with IA 10 of 2025

16.03.2025 16.03.2025 Misc.

174


35/MP/2024

15.03.2025 16.03.2025 Misc.

173


137/TT/2025

15.03.2025 16.03.2025 Transmission

172


135/TT/2025

15.03.2025 16.03.2025 Transmission

171


155/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the “Combined Asset consisting of Asset-I: Koldam Nalagarh 400 kV D/C (Quad) line along with bays at Nalagarh Sub-station and Asset-II: 400 kV line bays at Ludhiana Sub-station covered under “Transmission System associated with Koldam Hydro-electric Project” in the Northern Region. Power Grid Corporation of India Limited
15.03.2025 16.03.2025 Transmission

170


183/TT/2025

15.03.2025 16.03.2025 Transmission

169


495/TT/2024

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the “Combined Asset consisting of Asset-1: Two number bays at Nalagarh Extension, Asset-2: Two number bays at Kota Extension, Asset-3: 400 kV D/C Bahadurgarh-Sonepat Line along with its associated bays at Bahadurgarh and Sonepat, Asset-4: 315 MVA ICT-II at Sonepat, Asset-5: 315 MVA ICT-I at Sonepat, Asset-6: Two number of bays at Bhiwadi Extension and Asset-7: 125 MVAR 400 kV Bus-Reactor at Sonepat along with its associated bay covered under “Northern Region System Strengthening Scheme-XII” in the Northern Region. Power Grid Corporation of India Limited
13.03.2025 16.03.2025 Transmission

168


147/MP/2025

15.03.2025 16.03.2025 Misc.

167


394/MP/2019

15.03.2025 16.03.2025 Misc.

166


61/TL/2025

14.03.2025 16.03.2025 Licence (Transmission)

165


133/TT/2025

13.03.2025 13.03.2025 Transmission

164


232/TT/2025

13.03.2025 13.03.2025 Transmission

163


71/TL/2025

12.03.2025 13.03.2025 Licence (Transmission)

162


222/AT/2024

13.03.2025 13.03.2025 Adoption

161


509/TL/2024

12.03.2025 13.03.2025 Licence (Transmission)

160


507/TL/2024

12.03.2025 13.03.2025 Licence (Transmission)

159


225/TL/2024

12.03.2025 13.03.2025 Licence (Transmission)

158


231/TT/2025

12.03.2025 12.03.2025 Transmission

157


124/TT/2025

12.03.2025 12.03.2025 Transmission

156


121/TT/2025

12.03.2025 12.03.2025 Transmission

155


25/TT/2025

12.03.2025 12.03.2025 Transmission

154


206/TT/2025

12.03.2025 12.03.2025 Transmission

153


56/TT/2025

Approval under Section 62 read with Section 79 (1) (d) of Electricity Act, 2003 and under the Regulation 15 (1) (a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2024 for truing up of transmission tariff for 2019-24 and determination of transmission tariff for 2024-29 tariff block for Combined Asset comprising Asset-I: Extension of 400/220 kV Kolhapur (MSEB) Sub-station, Asset-II: 220 kV D/C Vapi-Magarwada Transmission Line along with associated bays and Asset-III: 220 kV D/C Vapi-Khardpada Transmission Line along with associated bays) under WRSS-III Transmission System in Western Region. Power Grid Corporation of India Limited
12.03.2025 12.03.2025 Transmission

152


141/MP/2016 with
IA No.888/2024

12.03.2025 12.03.2025 Misc.

151


149/TT/2025

11.03.2025 12.03.2025 Transmission

150


27/TT/2025

11.03.2025 12.03.2025 Transmission

149


225/TT/2025

11.03.2025 12.03.2025 Transmission

148


128/TT/2025

11.03.2025 12.03.2025 Transmission

147


123/TT/2025

11.03.2025 12.03.2025 Transmission

146


36/TT/2025

11.03.2025 12.03.2025 Transmission

145


208/TT/2025

11.03.2025 12.03.2025 Transmission

144


490/AT/2024

11.03.2025 11.03.2025 Adoption

143


487/TL/2024

10.03.2025 11.03.2025 Licence (Transmission)

142


95/TT/2025

11.03.2025 11.03.2025 Transmission

141


150/TD/2025

10.03.2025 11.03.2025 Licence

140


179/MP/2023

10.03.2025 11.03.2025 Misc.

139


291/RC/2024

10.03.2025 11.03.2025 Misc.

138


8/RP/2024 in 238/GT/2020

10.03.2025 10.03.2025 Review

137


373/MP/2022

10.03.2025 10.03.2025 Misc.

136


106/TT/2025

10.03.2025 10.03.2025 Transmission

135


23/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for for Assets under LILO of both the circuit of Patratu - Hatia - Chandil 220 kV D/C line at Ranchi Sub-station associated with 220 kV Inter-connection with Jharkhand State Electricity Board (JSEB) System at Ranchi Sub-station in the Eastern Region. Power Grid Corporation of India Limited
10.03.2025 10.03.2025 Transmission

134


94/TT/2025

10.03.2025 10.03.2025 Transmission

133


96/TT/2025

10.03.2025 10.03.2025 Transmission

132


97/TT/2025

10.03.2025 10.03.2025 Transmission

131


119/TT/2025

10.03.2025 10.03.2025 Transmission

130


114/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset consisting of Asset-I: 400 kV D/C Chamera Pooling Station-Jalandhar Transmission Line along with bays and Line Reactor at Jalandhar, Asset-II: 220 kV D/C Transmission Line from GIS Pooling Station Chamba-Chamera-III HEP under “Transmission System associated with Chamera-III HEP” in the Northern Region. Power Grid Corporation of India Limited
10.03.2025 10.03.2025 Transmission

129


104/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the combined elements comprising of Kaiga - Narendra 400 kV D/C Transmission Line, 400/220 kV Sub-station at Narendra with one 315 MVA ICT and 2nd 315 MVA ICT at Narendra Sub-station under “Kaiga-Narendra Transmission System” in the Southern Region. Power Grid Corporation of India Limited
10.03.2025 10.03.2025 Transmission

128


283/AT/2024

06.03.2025 10.03.2025 Adoption

127


312/AT/2024

03.03.2025 06.03.2025 Adoption

126


161/MP/2024

06.03.2025 06.03.2025 Misc.

125


14/TT/2025

05.03.2025 06.03.2025 Transmission

124


142/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for “Combined Asset : Asset-1: 400 kV D/C Raigarh-Raipur transmission line along with associated bays; Asset-2: 400 kV D/C Ranchi-Rourkela transmission line and extension of Ranchi Sub-station; Asset-3: Provision of 40% fixed series compensation package at Raipur Sub-station; Asset-4: 400 kV D/C Rourkela-Raigarh transmission line and associated bays at Raigarh and Rourkela under “East-West Transmission Corridor Strengthening Scheme in Western Region”. Power Grid Corporation of India Limited
05.03.2025 06.03.2025 Transmission

123


140/TT/2025

05.03.2025 06.03.2025 Transmission

122


105/TT/2025

05.03.2025 06.03.2025 Transmission

121


90/TT/2025

05.03.2025 06.03.2025 Transmission

120


131/TT/2025

05.03.2025 06.03.2025 Transmission

119


492/AT/2024

05.03.2025 05.03.2025 Adoption

118


478/TL/2024

05.03.2025 05.03.2025 Licence (Transmission)

117


70/AT/2025

05.03.2025 05.03.2025 Adoption

116


98/TT/2025

04.03.2025 04.03.2025 Transmission

115


139/TT/2025

03.03.2025 04.03.2025 Transmission

114


32/RP/2024 in
110/MP/2019

04.03.2025 04.03.2025 Review

113


92/TT/2025

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of the transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the “Combined Assets consisting of Asset-I: 400 kV 125 MVAr Bus Reactor with associated bays at Abdullapur and Asset-II: 400 kV D/C Abdullapur Sonepat Transmission Line alongwith 400 kV associated bays at Abdullapur and Sonepat Sub-station under “System Strengthening in Northern Region Grid for Karcham Wangtoo HEP” in the Northern Region. PGCIL
03.03.2025 03.03.2025 Transmission

112


91/TT/2025

03.03.2025 03.03.2025 Transmission

111


3/RP/2025

03.03.2025 03.03.2025 Review

110


69/TL/2025

03.03.2025 03.03.2025 Licence (Transmission)

109


ADDENDUM in 9/SM/2024

03.03.2025 03.03.2025 Suo-Motu

108


31/MP/2024

03.03.2025 03.03.2025 Misc

107


37/RC/2024

01.03.2025 01.03.2025 Misc.

106


11/MP/2024

01.03.2025 01.03.2025 Misc.

105


491/TL/2024

28.02.2025 28.02.2025 Licence (Transmission)

104


414/MP/2024

26.02.2025 27.02.2025 Misc

103


486/TL/2024

26.02.2025 27.02.2025 Licence (Transmission)

102


354/TT/2024

26.02.2025 27.02.2025 Transmission

101


288/TT/2023

26.02.2025 27.02.2025 Transmission

100


481/TT/2024

26.02.2025 27.02.2025 Transmission

99


157/TT/2025

25.02.2025 25.02.2025 Transmission

98


311/AT/2024

24.02.2025 25.02.2025 Adoption

97


84/TD/2025

24.02.2025 24.02.2025 Licence

96


82/MP/2025

24.02.2025 24.02.2025 Misc.

95


22/RP/2024
in
96/GT/2020

24.02.2025 24.02.2025 Review

94


226/AT/2024

24.02.2025 24.02.2025 Adoption

93


63/MP/2020

24.02.2025 24.02.2025 Adoption

92


85/TT/2024

20.02.2025 24.02.2025 Transmission

91


38/TT/2025

21.02.2025 24.02.2025 Transmission

90


489/TL/2024

21.02.2025 22.02.2025 Licence (Transmission)

89


436/TL/2024

21.02.2025 22.02.2025 Licence (Transmission)

88


61/TL/2025

21.02.2025 22.02.2025 Licence (Transmission)

87


240/MP/2023

20.02.2025 21.02.2025 Misc.

86


30/MP/2023

19.02.2025 20.02.2025 Misc.

85


480/TT/2024

20.02.2025 20.02.2025 Transmission

84


268/AT/2024

18.02.2025 19.02.2025 Adoption

83


436/GT/2020

17.02.2025 17.02.2025 Generation

82


329/TT/2023

17.02.2025 17.02.2025 Transmission

81


154/TT/2025

17.02.2025 17.02.2025 Transmission

80


9/TT/2025

17.02.2025 17.02.2025 Transmission

79


316/TL/2024

14.02.2025 14.02.2025 Licence (Transmission)

78


313/TL/2024

14.02.2025 14.02.2025 Licence (Transmission)

77


150/TD/2025

14.02.2025 14.02.2025 Licence

76


477/TL/2024

14.02.2025 14.02.2025 Licence (Transmission)

75


225/TL/2024

14.02.2025 14.02.2025 Licence (Transmission)

74


Corrigendum to 7/RP/2024

13.02.2025 13.02.2025 Review

73


10/TT/2025

11.02.2025 12.02.2025 Transmission

72


7/TT/2025

11.02.2025 12.02.2025 Transmission

71


5/TT/2025

11.02.2025 12.02.2025 Transmission

70


4/TT/2025

11.02.2025 12.02.2025 Transmission

69


37/TT/2025

11.02.2025 12.02.2025 Transmission

68


8/TT/2025

Petition for truing up of the transmission tariff for the 2019-24 tariff period and determination of the transmission tariff for the 2024-29 tariff period for the Combined Asset: Comprising Asset-1: 315 MVA ICT-III at Ludhiana Sub-station; and Asset-2: Bay extension work at Wagoora Sub-station under “Northern Region System Strengthening Scheme-VII (NRSS-VII)” in Northern Region under Section 62 read with Section 79 (1)(d) of the Electricity Act, 2003 and under Regulation 15 (1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. Power Grid Corporation of India Limited
11.02.2025 12.02.2025 Transmission

67


100/MP/2021 with IA No. 94/2023, 102/MP/2021 with IA No. 97/2023, 308/MP/2023 with IA Nos. 77/2023, 78/2023, 95/2023 & 96/2023

12.02.2025 12.02.2025 Misc.

66


317/TL/2024

08.02.2025 11.02.2025 Licence (Transmission)

65


189/GT/2020

10.02.2025 10.02.2025 Generation

64


89/GT/2023

07.02.2025 07.02.2025 Generation

63


433/MP/2024

06.02.2025 07.02.2025 Misc.

62


112/MP/2025

07.02.2025 07.02.2025 Misc.

61


453/TT/2024

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset: 400 kV D/C Gorakhpur-Lucknow transmission line along with its associated bays; and 30% FSC on 400 kV D/C Gorakhpur-Lucknow transmission line at Lucknow along with bays under “Northern Region System Strengthening Scheme-X” in the Northern Region”. Power Grid Corporation of India Limited
06.02.2025 07.02.2025 Transmission

60


24/RP/2024
in
563/GT/2020

06.02.2025 07.02.2025 Review

59


376/TT/2024

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and Regulations 15(1)(a) and 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of the transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the determination of transmission tariff of the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the Combined Asset comprising of Asset-I: LILO of both circuits of 400kV D/C Gazuwaka-Vijayawada Transmission Line at Vemagiri and Asset-II: Extension of 400/220 kV Sub-station at Vijayawada under System Strengthening-VI of Southern Region Grid in the Southern Region. Power Grid Corporation of India Limited
06.02.2025 07.02.2025 Transmission

58


350/TT/2023

04.02.2025 06.02.2025 Transmission

57


437/TL/2024

31.01.2025 31.01.2025 Licence (Transmission)

56


423/AT/2024

31.01.2025 31.01.2025 Adoption

55


387/AT/2024

31.01.2025 31.01.2025 Adoption

54


365/AT/2024

31.01.2025 31.01.2025 Adoption

53


346/AT/2024

31.01.2025 31.01.2025 Adoption

52


324/TL/2024

31.01.2025 31.01.2025 Licence (Transmission)

51


189/MP/2024

29.01.2025 29.01.2025 Misc.

50


90/TT/2024

27.01.2025 27.01.2025 Transmission

49


381/TT/2024

Petition for the truing up of transmission tariff for the 2019-24 period and the determination of transmission tariff for the 2024-29 period for 765 kV Single Circuit Kurnool-Raichur Transmission Line along with associated bay extensions at 765/400 kV Kurnool Sub-station and 765/400 kV Raichur Sub-station under the “System Strengthening Scheme-XXII” in Southern Region under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 read with the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024. PGCIL
27.01.2025 27.01.2025 Transmission

48


17/MP/2023

Petition under Section 79(1)(b) and Section 79(1)(f) of the Electricity Act, 2003 read with Article 13 and Article 17 of the Power Purchase Agreement dated 7.8.2008 (as amended vide amendment agreements dated 17.9.2008 and 27.5.2022) executed between the Petitioner and Uttar Haryana Bijli Vitran Nigam Limited & Dakshin Haryana Bijli Vitran Nigam Limited; as well as Article 13 and Article 17 of the Power Purchase Agreement dated 20.1.2009 (as amended vide amendment agreement dated 21.10.2010) between the Petitioner and Tata Power Trading Company Limited inter alia seeking approval of Change in Law event, i.e., enactment of the Integrated Goods and Services Tax Act, 2017, the Central Goods and Services Tax Act, 2017, the State Goods And Services Tax Act, 2017, and the Union Territory Goods and Services Tax Act 2017; and compensation for additional expenses incurred by the Petitioner with respect to operation and maintenance of the Project on account of the same along with carrying cost. Jhajjar Power Limited
22.01.2025 23.01.2025 Misc.

47


119/AT/2024

22.01.2025 23.01.2025 Adoption

46


400/TT/2024

21.01.2025 22.01.2025 Transmission

45


399/TT/2024

20.01.2025 22.01.2025 Transmission

44


394/TT/2024

20.01.2025 22.01.2025 Transmission

43


393/TT/2024

20.01.2025 22.01.2025 Transmission

42


377/TT/2024

20.01.2025 22.01.2025 Transmission

41


356/TT/2024

20.01.2025 22.01.2025 Transmission

40


93/TT/2023

20.01.2025 22.01.2025 Transmission

39


264/GT/2021

22.01.2025 22.01.2025 Generation

38


478/TL/2024

20.01.2025 22.01.2025 Licence (Transmission)

37


7/RP/2024

20.01.2025 21.01.2025 Review

36


375/TT/2024

20.01.2025 21.01.2025 Transmission

35


397/TT/2024

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for truing up of transmission tariff for the 2019-24 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 and determination of transmission tariff for the 2024-29 tariff period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for Thermal Powertech Corporation India Ltd. Switchyard to Nellore Pooling Station 400 kV D/C (quad) Line along with associated bay extensions at Nellore Pooling Station under “Transmission System for connectivity of Thermal Powertech Corporation India Ltd.” in the Southern Region. Power Grid Corporation of India Limited
19.01.2025 21.01.2025 Transmission

34


401/TT/2024

18.01.2025 21.01.2025 Transmission

33


349/TT/2023

20.01.2025 20.01.2025 Transmission

32


427/AT/2024

18.01.2025 20.01.2025 Adoption

31


424/TL/2024

18.01.2025 20.01.2025 Licence (Transmission)

30


426/TL/2024

18.01.2025 20.01.2025 Licence (Transmission)

29


477/TL/2024

17.01.2025 20.01.2025 Licence (Transmission)

28


503/MP/2024

16.01.2025 18.01.2025 Misc.

27


281/TD/2024

14.01.2025 17.01.2025 Licence

26


340/TL/2024

14.01.2025 17.01.2025 Licence (Transmission)

25


432/MP/2024

14.01.2025 17.01.2025 Misc.

24


342/AT/2024

14.01.2025 17.01.2025 Adoption

23


343/TL/2024

14.01.2025 15.01.2025 Licence (Transmission)

22


34/RP/2023 in 237/GT/2020

12.01.2025 13.01.2025 Review

21


15/TT/2023

Approval under Regulation 86 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 and determination of transmission tariff from COD to 31.3.2024 under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 in respect of Asset-1: Bypassing of 400 kV D/C Farakka - Kahalgaon (Ckt-3 & Ckt-4) and 400 kV S/C Farakka - Durgapur (Ckt-1 & Ckt-2) existing transmission line from NTPC, Farakka so as to form 400 kV D/C Kahalgaon - Durgapur along with upgraded bays at Durgapur Sub-station and Kahalgaon Sub-station, Asset-2: 01 No. 500 MVA, 400/220 kV Transformer (4th ICT) along with 01 No. 400 kV ICT bay (AIS) and 01 No. 220 kV ICT bay (GIS) along with 220 kV cable from ICT to GIS bay at Muzaffarpur (POWERGRID) 400/220 kV Sub-station and Asset-3: LILO of both circuits of Kishanganj (POWERGRID) -Darbhanga (DMTCL) 400 kV D/C (Quad) Line at Saharsa New (POWERGRID) Sub-station along with associated 04 nos. 400 kV line bays at Saharsa New (POWERGRID) Sub-station under “Eastern Region Strengthening Scheme-XXIII" in the Eastern Region. Power Grid Corporation of India Limited
11.01.2025 13.01.2025 Transmission

20


390/TT/2023

11.01.2025 13.01.2025 Transmission

19


370/TT/2024

11.01.2025 13.01.2025 Transmission

18


369/TT/2024

Approval under Section 62 read with Section 79(1)(d) of the Electricity Act, 2003 and under Regulation 15(1)(a) and Regulation 23 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023 for the truing-up of transmission tariff for the 2019-24 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff Regulations, 2019 and for the determination of transmission tariff for the 2024-29 period under the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 and for Combined Asset comprising of Asset-I comprising of Combined Elements of: (a) 30% FSC on 400 kV Bareilly-Mandola Ckt. 1 and Ckt. 2 at Bareilly, (b) 45% FSC on 400 kV D/C Unnao-Bareilly Ckt. 1 and Ckt. 2 at Unnao and (c) 30% FSC on 400 kV Gorakhpur-Lucknow Ckt. 1 at Lucknow and Asset-II: 30% FSC on 400 kV Gorakhpur-Lucknow Ckt. 2 at Lucknow under “System associated with Enhancement of Transmission Capacity of East-West Corridor of the Northern Region”. Power Grid Corporation of India Limited
11.01.2025 13.01.2025 Transmission

17


434/MP/2024

11.01.2025 13.01.2025 Misc.

16


29/RP/2024 in 113/MP/2020 along with IA No. 89/2024

06.01.2025 09.01.2025 Review

15


01/SM/2025

08.01.2025 08.01.2025 Suo-Motu

14


374/TT/2024

08.01.2025 08.01.2025 Transmission

13


10/SM/2024

02.01.2025 06.01.2025 Suo-Motu

12


382/TT/2024

03.01.2025 06.01.2025 Transmission

11


358/TT/2024

03.01.2025 06.01.2025 Transmission

10


437/TL/2024

03.01.2025 06.01.2025 Licence (Transmission)

09


337/GT/2014

05.01.2025 06.01.2025 Generation

08


340/GT/2014

05.01.2025 06.01.2025 Generation

07


21/RP/2024 in 54/MP/2024

03.01.2025 06.01.2025 Review

06


92/MP/2024 with IA.No.36/2024

03.01.2025 06.01.2025 Misc.

05


204/MP/2023

03.01.2025 06.01.2025 Misc.

04


347/TL/2024

02.01.2025 03.01.2025 Licence (Transmission)

03


383/TT/2024

02.01.2025 03.01.2025 Transmission

02

280/GT/2014
02.01.2025 03.01.2025 Generation

01

138/AT/2024
02.01.2025 03.01.2025 Adoption