Sl.No. | CERC Regulations on | Gazette No | Notification/ Gazette Date |
---|---|---|---|
192. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024. 1. Gazette 2. Notification 3. Notification - effective date 16.09.2024 4. Gazette - Gazette - effective date 16.09.2024 (Gazette No. 712) 5. Notification - effective date 16.09.2024 (except Regulation 8(8)) |
642 |
21.08.2024 |
191. |
Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2024. 1. Gazette 2. Notification |
588 |
01.08.2024 |
190. |
Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State transmission System) (Second Amendment) Regulations, 2024
1. Gazette 2. Notification 3. Gazette - effective date 15.07.2024 (Gazette No. 518) 4. Notification - effective date 15.07.2024 |
469 |
01.07.2024 |
189. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2024. 1. Gazette 2. Notification |
530 |
16.07.2024 |
188. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2024. 1. Gazette 2. Notification 3. Statement of Reasons |
413 |
14.06.2024 |
187. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the tariff period from 1.4.2024 to 31.3.2029. 1. Gazette 2. Notification 3. Corrigendum (09.04.2024) 4. Annexure-I (Part I) 5. Annexure-I (Part II) 6. Annexure-I (Part III) 7. Annexure-I (Part IV) 8. Statement of Reasons |
468 |
01.07.2024 |
186. |
Procedures/Guidelines on under the Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017. 1. Guidelines Availability of Communication System (Order - date 19.01.2024) 2. Guidelines Interfacing Requirements (Order - date 19.01.2024) 3. Procedure Centralized Supervision of Quick Fault Detection & Restoration (Order - date 19.01.2024) 4. Procedures Maintenance & Testing (Order - date 19.01.2024) |
- |
20.01.2024 |
185. |
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations (First Amendment), 2023. 1. Gazette 2. Amendment 3. Statement of Reasons |
857 |
26.12.2023 |
184. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2023 1. Gazette 2. Notification 3. Statement of Reasons |
858 |
26.12.2023 |
183. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2023 1. Gazette 2. Notification 3. Statement of Reasons |
734 |
27.10.2023 |
182. |
Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2023. 1. Gazette 2. Notification 3. Statement of Reasons |
733 |
27.10.2023 |
181. |
Central Electricity Regulatory Commission (Conduct of Business) Regulations, 2023. 1. Gazette 2. Notification |
51 |
23.01.2024 |
180. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023. 1. Gazette 2. Notification 3. Gazette - effective date 1.10.2023 (Gazette No. 575) 4. Notification - effective date 1.10.2023 5. Detailed Procedure for SRAS & TRAS - date 28.09.2023 6. Suo-Motu (1st Order) - date 30.09.2023 7. Suo-Motu (2st Order) - date 18.12.2023 8. Detailed Procedure for SCUC, USD and SCED - date 16.04.2024 9. Statement of Reasons |
488 |
11.07.2023 |
179. |
Central Electricity Regulatory Commission (Appointment of Consultants) (Fourth Amendment) Regulations, 2023 Gazette |
333 |
19.05.2023 |
178. |
Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023. 1. Gazette 2. Notification 3. Gazette - effective date 5.4.2023 (Gazette No. 230) 4. Notification - effective date 5.4.2023 5. Gazette - effective date 1.10.2023 (Gazette No. 577) 6. Notification - effective date 1.10.2023 7. Suo-Motu (1st Order) - date 22.09.2023 8. Suo-Motu (2nd Order) - date 29.09.2023 9. Detailed Procedure of Allocation of Corridor - date 29.09.2023 10. Suo-Motu (3rd Order) - date 01.10.2023 11. Suo-Motu (4rd Order) - date 07.10.2023 12. Statement of Reasons |
229 |
06.04.2023 |
177. |
Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (First Amendment) Regulations, 2023. 1. Gazette 2. Amendment 3. Gazette - effective date 1.10.2023 (Gazette No. 576) 4. Notification - effective date 1.10.2023 5. Corrigendum (28.09.2023) 6. Corrigendum Gazette (Gazette No. 717) |
149 | 01.03.2023 |
176. |
Central Electricity Regulatory Commission (Terms and Conditions for Dealing in Energy Savings Certificates) (First Amendment) Regulations, 2022. 1. Gazette 2. Amendment 3. Statement of Reasons |
690 | 22.12.2022 |
175. |
Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.
1. Gazette 2. Notification 3. Corrigendum (Dated: 18.06.2022) 4. Gazette - effective date 15.10.2022 (Gazette No. 520) 5. Notification - effective date 15.10.2022 6. Detailed Procedure for Connectivity and GNA 7. Corrigendum (Dated: 31.08.2023) 8. Gazette - effective date 1.10.2023 (Gazette No. 577) 9. Notification - effective date 1.10.2023 10. Suo-Motu (1st Order) - date 22.09.2023 11. Suo-Motu (2nd Order) - date 29.09.2023 12. Detailed Procedure of Allocation of Corridor - date 29.09.2023 13. Suo-Motu (3rd Order) - date 01.10.2023 14. Suo-Motu (4rd Order) - date 07.10.2023 |
364 | 19.07.2022 |
174. |
“Detailed Procedure for calculations of specific metrics for Key Performance Indicators” under Regulation 32 of the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 1. Order 2. Annexure |
- | 20.05.2022 |
173. |
Guidelines for Registration and Filing Application for Establishing and Operating Over the Counter (OTC) Platform, 2022 1. Gazette 2. Guidelines 3. Statement of Reasons |
267 | 19.05.2022 |
172. |
Central Electricity Regulatory Commission (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations, 2022. 1. Gazette 2. Notification 3. Statement of Reasons 4. Gazette - effective date 05.12.2022 (Gazette No. 547) 5. Notification - effective date 05.12.2022 |
272 | 24.05.2022 |
171. |
“Procedure for Short Term Open Access in inter-State Transmission System through National Open Access Registry (NOAR)” under Regulation 4 of the Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018. 1. Order 2. Annexure 3. Corrigendum to the order dated 1.4.2022 in Order No.-L-7/105(121)/2007-CERC |
- | 01.04.2022 |
170. |
Central Electricity Regulatory Commission (Payment of Fees) (Third Amendment) Regulations, 2022 1. Gazette 2. Amendment 3. Statement of Reasons |
149 | 24.03.2022 |
169. |
Detailed Procedure on "Methodology of Payment of Certificate Retainer-ship" under Regulation 33 of the Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019. 1. Order 2. Annexure |
- | 15.03.2022 |
168. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2022. 1. Gazette 2. Notification 3. Statement of Reasons 4. Gazette - effective date 05.12.2022 (Gazette No. 545) 5. Notification - effective date 05.12.2022 6. Suo-Motu order (Order Date: 26-12-2022) 7. Suo-Motu order (Order Date: 06-02-2023) |
147 | 22.03.2022 |
167. |
Central Electricity Regulatory Commission (Ancillary Services) Regulations, 2022. 1. Gazette 2. Notification 3. Statement of Reasons 4. Notification - effective date 05.12.2022 5. Gazette - effective date 05.12.2022 (Gazette No. 546) 6. Notification - effective date 01.04.2023 7. Gazette - effective date 01.04.2023 (Gazette No. 100) 8. Notification - effective date 01.05.2023 9. Notification - effective date 01.05.2023 (Gazette No. 219) 10. Notification - effective date 01.06.2023 11. Gazette - effective date 01.06.2023 (Gazette No. 280) |
85 | 12.02.2022 |
166. |
Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010 - Repeal 1. Gazette 2. Notification |
530 | 01.11.2021 |
165. |
Central Electricity Regulatory Commission (Recruitment, Control and Service Conditions of Staff)(Fifth Amendment) Regulations, 2021
1. Gazette |
112 | 16.03.2021 |
164. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2021 1. Gazette 2. Notification 3. Annexure-I(Part IV) 4. Statement of Reasons |
394 | 13.09.2021 |
163. |
Revised procedure for “Grant of connectivity to projects based on renewable sources to inter-state transmission system". 1. Order 2. Annexure |
- | 20.02.2021 |
162. |
Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2021.
Repealed on 26.10.2021 1. Gazette 2. Notification 3. Statement of Reasons |
152 | 12.04.2021 |
161. |
Central Electricity Regulatory Commission (Power Market) Regulations, 2021. 1. Gazette 2. Notification 3. Gazette - effective date 15.08.2021 (Gazette No. 327) 4. Notification - effective date 15.08.2021 5. Statement of Reasons |
241 | 16.06.2021 |
160. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2020. 1. Gazette 2. Notification 3. Statement of Reasons |
53 |
03.02.2021 |
159. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020. 1. Gazette 2. Notification 3. Statement of Reasons Extension of period of applicability of Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 4. Notification - 27.03.2023 (Gazette No. 220) 5. Notification - 06.09.2023 6. Extension of Order (Order date:-08-09-2023) Extension of period of applicability of Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020 7. Notification - 28.03.2024 |
324 |
19.08.2020 |
158. |
Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020. 1. Gazette 2. Notification 3. Notification - effective date 01.11.2020 (Gazette No. 346) 4. Statement of Reasons 5. Removal of Difficulties Order (Order date:-14-02-2021) 6. Removal of Difficulties Order (Order date:-30-12-2022) 7. Removal of Difficulties Order (Order date:-12-06-2023) |
243 | 01.07.2020 |
157. |
Central Electricity Regulatory Commission (Payment of Fees) (Second Amendment) Regulations, 2020. 1. Gazette 2. Notification 3. Statement of Reasons |
462 |
02.11.2020 |
156. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) (First Amendment) Regulations, 2020 1. Gazette 2. Amendment 3. Statement of Reasons 4. Addendum to Statement of Reasons(Dated: 01-04-2020) |
461 |
02.11.2020 |
155. |
Central Electricity Regulatory Commission (Sharing of Revenue Derived from Utilization of Transmission Assets for Other Business) Regulations, 2020 1. Gazette 2. Notification 3. Statement of Reasons |
239 | 01.07.2020 |
154. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, 2020 1. Gazette 2. Notification 3. Statement of Reasons |
43 | 31.01.2020 |
153. |
Framework for Real-Time Market. 1.1 Gazette (Indian Electricity Grid Code Regulations, 2010 (Sixth Amendment)) 1.2 Gazette (Open Access in inter-State Transmission Regulations, 2008 (Sixth Amendment)) 1.3 Gazette (Power Market Regulations, 2010 (Second Amendment)) 1.4 Gazette (Corrigendum to Indian Electricity Grid Code Regulations, 2010 (Sixth Amendment)) 2. Statement of Reasons 3. Indian Electricity Grid Code Regulations, 2010 (Sixth Amendment) 4. Open Access in inter-State Transmission Regulations, 2008 (Sixth Amendment) 5. Power Market Regulations, 2010 (Second Amendment) Real Time Market to be implemented from 1st June 2020. 7. Notification Indian Electricity Grid Code Regulations, 2010 (Sixth Amendment) 8. Notification Open Access in inter-State Transmission Regulations, 2008 (Sixth Amendment) 9. Notification Power Market Regulations, 2010 (Second Amendment) |
495 496 497 322 |
27.12.2019 |
152. |
Methodology of settlement of accounts for bilateral short term and collective transactions, for the period of Grid Disturbance. Order |
- | 09.10.2019 |
151. |
Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019. 1. Gazette 2. Notification 3. Statement of Reasons |
422 | 26.11.2019 |
150. |
Central Electricity Regulatory Commission (Recruitment, Control and Service conditions of Staff) (Fourth Amendment) Regulations, 2019. 1. Gazette |
211 | 14.06.2019 |
149. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Fifth Amendment) Regulations, 2019. 1. Gazette 2. Notification 3. Statement of Reasons 4. Errata 5. Suo-Motu order on Removal of difficulties (Order Date: 27-03-2020) |
178 | 29.05.2019 |
Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019 1. Gazette 2. Notification 3. Statement of Reasons 4. Detailed Procedure on Methodology of Payment of Certificate Retainer-ship (Uploaded on 15.03.2022) 5. Detailed Procedure for calculation of Key Performance Indicators (Uploaded on 20.05.2022) 6. Suo-Motu (Order) - date 30.11.2023 |
169 | 21.05.2019 |
|
147. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Sixth Amendment), Regulations, 2019. 1. Gazette 2. Notification 3. Statement of Reasons |
126 | 08.04.2019 |
146. |
Central Electricity Regulatory Commission (Cross Border Trade of Electricity) Regulations, 2019 1. Gazette 2. Notification 3. Statement of Reasons |
160 | 14.05.2019 |
145. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019 1. Gazette 2. Notification 3. Annexure-I (Part I) 4. Annexure-I (Part II) 5. Annexure-I (Part III) 6. Corrigendum (15-03-2019) 7. Corrigendum II (18-09-2019) 8. Statement of Reasons |
144 | 03.05.2019 |
144. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff) (Second Amendment) Regulations, 2019 1. Gazette 2. Notification 3. Statement of Reasons |
66 | 15.02.2019 |
143. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2019. 1. Gazette 2. Notification 3. Statement of Reasons 4. Corrigendum 5. Corrigendum 2 |
24 | 28.01.2019 |
142. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fifth Amendment) Regulations, 2018 1. Gazette 2. Notification 3. Statement of Reasons 4. Notification - effective date 01.05.2022, (Gazette No. 169) 5. NOAR Procedure (Order date: 01-04-2022) 6. NOAR Corrigendum (Order date: 06-05-2022) |
23 | 28.01.2019 |
141. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Fourth Amendment) Regulations, 2018 1. Gazette 2. Notification 3. Statement of Reasons 4. Erratum |
444 | 26.11.2018 |
140. |
Central Electricity Regulatory Commission (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018. 1. Gazette 2. Notification 3. Statement of Reasons |
323 | 24.08.2018 |
139. |
Detailed procedure for “Grant of connectivity to projects based on renewable sources to inter-state transmission system". 1. Order 2. Annexure |
- |
15-05-2018 |
138. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) Regulations (5th Amendment), 2017. 1. Gazette 2. Notification 3. Statement of Reasons |
12 |
11.01.2018 |
137. |
Central Electricity Regulatory Commission (Payment of fees) (First Amendment), Regulations-2017. 1. Gazette 2. Notification 3. Statement of Reasons |
246 |
22.06.2017 |
136. |
Central Electricity Regulatory Commission (Communication System for inter-State transmission of electricity) Regulations, 2017. 1. Gazette 2. Notification 4. Statement of Reasons 5. Guidelines Availability of Communication System (Order - date 19.01.2024) 6. Guidelines Interfacing Requirements (Order - date 19.01.2024) 7. Procedure Centralized Supervision of Quick Fault Detection & Restoration (Order - date 19.01.2024) 8. Procedures Maintenance & Testing (Order - date 19.01.2024) |
218 |
29.05.2017 |
135. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016 were notified on 29.4.2016 in the Gazette of India, Extraordinary (Part-III, Section IV No. 162). 1. Gazette 2. Notification |
201 |
16.05.2017 |
134. |
- |
05.05.2017 |
|
133. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017. 1. Gazette 2. Notification 3. Statement of Reasons 4. Related Orders Extension of period of applicability of Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017 5. Notification – 24.03.2020 |
147 |
19.04.2017 |
132. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fifth Amendment) Regulations, 2017. 1. Gazette 2. Notification 3. Corrigendum 4. Erratum 5. Statement of Reasons |
148 |
19.04.2017 |
131. |
Central Electricity Regulatory Commission (Appointment of Consultants) (Third Amendment) Regulations, 2017. Gazette |
46 |
10.02.2017 |
130. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2017 1. Gazette 2. Notification 3. Statement of Reasons |
98 |
10.03.2017 |
129. |
Central Electricity Regulatory Commission (Sharing of Inter-State Tranmission Charges and Losses) Regulations, 2010 (Principal Regulation). Gazette |
280 |
05.07.2016 |
128. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Fourth Amendment) Regulations, 2016. 1. Gazette 2. Notification 3. Statement of Reasons |
279 |
05.07.2016 |
127. |
The Central Electricity Regulatory Commission (Terms and Conditions for Dealing in Energy Savings Certificates) Regulations, 2016. 1. Gazette 2. Notification 3. Statement of Reasons 4. Procedures for Transaction of Energy Savings Certificatess |
237 |
30.05.2016 |
126. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters)(Third Amendment) Regulations, 2016. 1. Gazette 2. Notification 3. Statement of Reasons |
201 |
16-05-2016 |
125. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations,
2016. 1. Gazette 2. Notification (06-04-2016) 3. Statement of Reasons 4. DOP on Reserve Shutdown and Compensation Mechanism 5. Corrigendum (29-01-2020) |
162 |
29-04-2016 |
124. |
111 |
30-03-2016 |
|
123. |
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2016. 1. Gazette 2. Notification 3. Statement of Reasons |
112 |
30-03-2016 |
122. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fifth Amendment) Regulations, 2016. 1. Gazette 2. Notification 3. Statement of Reasons |
117 |
31-03-2016 |
121. |
Central Electricity Regulatory Commission (Recruitment, Control and Service Conditions of Staff) (Third Amendment) Regulations, 2016. Gazette |
110 |
28-03-2016 |
120. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (First Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
379 |
24-11-2015 |
119. |
Central Electricity Regulatory Commission (Indoor/outdoor Medical Facilities) (First Amendment) Regulation, 2015. Gazette |
385 |
04-12-2015 |
118. |
Central Electricity Regulatory Commission (Recruitment, Control and Service Conditions of Staff) (Second Amendment) Regulations, 2015. Gazette |
384 |
04-12-2015 |
117. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
355 |
23-10-2015 |
116. |
Central Electricity Regulatory Commission (Ancillary Services Operations) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons 4. Detailed Procedure For Ancillary Services Operations 5. Revised Detailed Procedure For Ancillary Services Operations. Dated 21-11-2016 - Corrigendum |
281 |
19-08-2015 |
115. |
Procedure for implementation of the framework On Forecasting, scheduling and imbalance handling for renewable energy generating stations including power parks based on wind and solar At inter-state level: Procedure
Framework on Forecasting, Scheduling and Imbalance Handling for Variable Renewable Energy Sources (Wind and Solar): Statement of Reasons
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015.
1. Gazette 2. Notification Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015. 1. Gazette 2. Notification |
272 |
10-08-2015 |
114. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Third Amendment) Regulations, 2015. 1. Notification 2. Statement of Reasons |
250 |
10-07-2015 |
113. |
Central Electricity Regulatory Commission (Power System Development Fund) (First Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
238 |
08-07-2015 |
112. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
239 |
03-07-2015 |
111. |
- |
05-06-2015 |
|
110. |
Central Electricity Regulatory Commission (Miscellaneous Provisions) Order, 2015. 1. Gazette 2. Notification |
201 |
01-06-2015 |
109. |
Central Electricity Regulatory Commission (Fees and Charges of Regional Load
Despatch Centre and other related matters) Regulations, 2015. 1. Gazette 2. Notification |
269 |
06-08-2015 |
108. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fifth Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
171 |
19-05-2015 |
107. |
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) (First Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
170 |
19-05-2015 |
106. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons |
165 |
15-05-2015 |
105. |
The Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) (Third Amendment) Regulations, 2015. 1. Gazette 2. Notification 3. Statement of Reasons 4. Appendix-I 5. Appendix-II |
118 |
07.04.2015 |
104. |
The Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Second Amendment) Regulations, 2014. 1. Gazette 2. Notification 3. Statement of Reasons |
06 |
05.01.2015 |
103. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2014. . 1. Gazette 2. Notification 3. Statement of Reasons |
381 |
31.12.2014 |
102. |
The Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014. . 1. Gazette 2. Corrigendum 3. Order 4. Notification 5. Statement of Reasons 6. REC Procedures |
380 |
31.12.2014 |
101. |
Central Electricity Regulatory Commission (Appointment of Consultants) (Second Amendment) Regulations, 2014. Notification |
286 |
07.10.2014 |
100. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2014. . 1. Gazette 2. Notification 3. Detailed Procedure 4. Statement of Reasons |
245 |
21-08-2014 |
99. |
Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 . 1. Gazette 2. Notification |
171 |
10-06-2014 |
98. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.
3. Annexure-I Thermal 1. Notification 2. Statement of Reasons 4. Annexure-I Hydro 5. Annexure-I Transmission |
92 |
21-02-2014 |
97. |
Central Electricity Regulatory Commission (Power Market) (First Amendment) Regulations, 2014.
1. Gazette 2. Notification 3. Statement of Reasons |
111 |
09-04-2014 |
96. |
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2014.
1. Gazette 2. Notification 3. Statement of Reasons |
92 |
21-03-2014 |
95. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Second Amendment) Regulations, 2014.
1. Gazette 2. Notification 3. Corrigendum 4. Methodology of settlement of accounts for bilateral short term and collective transactions, for the period of Grid Disturbance. Dated:- 09-10-2019 |
08 |
06-01-2014 |
94. |
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2014. 1. Gazette 2. Notification 3. Corrigendum |
06 |
07-01-2014 |
93. |
Central Electricity Regulatory Commission (Conduct of Business) (Amendment) Regulations, 2013.
1. Gazette 2. Notification 3. Statement of Reasons |
291 |
14-11-2013 |
92. |
Central Electricity Regulatory Commission (Open Access in inter-State Transmission)(Second Amendment) Regulations, 2013.
1. Gazette 2. Notification |
237 |
11-09-2013 |
91. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) (Second Amendment) Regulations, 2013.
1. Gazette 2. Notification 3. Statement of Reasons |
230 |
03-09-2013 |
90. |
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2013. 1. Gazette 2. Notification 3. Statement of Reasons |
192 |
11-07-2013 |
89. |
CERC (Recruitment, Control and Service Conditions of Staff) (Amendment) Regulations, 2007 Gazette |
94 |
03-04-2013 |
88. |
- |
- |
|
87. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Third Amendment) Regulations, 2013.
1. Gazette 2. Notification 3. Statement of Reasons |
86 |
26-03-2013 |
86. |
Central Electricity Regulatory Commission (Indian Electricity Grid Code) (First Amendment) Regulations, 2012.
1. Gazette 2. Notification 3. Statement of Reasons 4. Writ Petition No. 8510/2012 filed by TANGEDCO Challenging the above Regulation dismissed by Honble High Court of Madras vide judgment dated 14/09/2012 |
60 |
06-03-2012 |
85. |
Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Third Amendment) Regulations, 2012. 1. Gazette 2. Notification 3. Statement of Reasons |
01 |
01-01-2013 |
84. |
Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of trading licence and other related matters) (First Amendment) Regulations, 2012.. 1. Gazette 2.Notification 3.Statement of Reasons |
224 |
11-10-2012 |
83. |
The Central Electricity Regulatory Commission (Standards of Performance of inter-State transmission licensees) Regulations, 2012. 1. Gazette 2. Notification 3. Statement of Reasons |
204 |
21-09-2012 |
82. |
Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Second Amendment) Regulations, 2012. 1. Gazette 2. Notification 3. Statement of Reasons 4. Corrigendum to Second Amendments 5. Writ Petition No. 8509/2012 filed by TANGEDCO Challenging the above Regulation dismissed by Honble High Court of Madras vide judgment dated 14/09/2012 |
59 |
06-03-2012 |
81. |
Central Electricity Regulatory Commission (Payment of Fees) Regulations, 2012. 1. Gazette 2. Notification 3. Statement of Reasons |
79 |
30-03-2012 |
80. |
Central Electricity Regulatory Commission (Sharing of inter-State Transmission Charges and Losses) (Second Amendment) Regulations, 2012 1. Gazette 2. Notification 3. Statement of Reasons |
76 |
29-03-2012 |
79. |
Central Electricity Regulatory Commission (Grant of Connectivity, Long-Term Access and Medium-Term Open Access in Inter-State Transmission and related matters) (Second Amendment) Regulations, 2012 1. Gazette 2. Notification 3. Statement of Reasons (14-03-2012) |
72 |
22-03-2012 |
78 |
CERC(Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. 1. Gazette 2. Notification 3. Statement of Reasons (06-02-2012) |
20 |
07-02-2012 |
77. |
CERC (Sharing of inter-State Transmission Charges and Losses)(First Amendment) Regulations, 2011 1. Gazette 2. Notification 3. Statement of Reasons (21-11-2011) |
229 |
25-11-2011 |
76. |
Corrigendum of CERC (Regulation of Power Supply) Regulations, 2010
Repealed on 26.10.2021 1. Gazette 2. Corrigendum |
185 |
06-09-2011 |
75. |
CERC (Terms and Conditions of Tariff) (Second Amendment) Regulation, 2011 1. Gazette 2. Notification 3. Statement of Reasons (21-06-2011) |
129 |
22-06-2011 |
74. |
CERC (Terms and Conditions of Tariff) (First Amendment) Regulation, 2011 1. Gazette 2. Notification |
92 |
02-05-2011 |
73. |
Fees and charges of Regional Load Despatch Centre and other related matters (First Amendment) Regulations, 2011 2. Notification 3. Statement of Reasons (22-03-2011) |
62 |
28-03-2011 |
72. |
Extension of the date of operation of Clauses 5 and 7 of Annexure-I of the CERC (Indian Electricity Grid Code) Regulations, 2010 1. Gazette 2. Notification |
10 |
19-01-2011 |
71. |
CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010. 1. Gazette 2. Notification 3. Order |
349 |
30-12-2010 |
70. |
Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation (First Amendment) Regulations, 2010 1. Gazette 2. Notification 3. Statement of Reasons(27-09-2010) |
249 |
01-10-2010 |
69. |
CERC (Regulation of Power Supply) Regulations, 2010 Repealed on 26.10.2021 1. Gazette 2. Notification 3. Statement of Reasons (17-09-2010) 4. Corrigendum (05-09-2011) |
248 |
30-09-2010 |
68. |
CERC Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters(Amendment) Regulations, 2010 1. Gazette 2. Notification |
225 |
07-09-2010 |
67. |
CERC (Appointment of Consultants) (Amendment) Regulation, 2010 1. Gazette 2. Notification |
225 |
06-09-2010 |
66. |
Guidelines for vetting of capital cost of hydro electric projects by Designated Independent Agencies/Experts. 1. Gazette 2. Notification 3. Statement of Reasons |
200 |
07-08-2010 |
65. |
"Procedure for the Implementation of the Mechanism of Renewable Regulatory Fund under Regulation 6.1 (d) of CERC (Indian Electricity Grid Code), Regulation 2010 Gazette |
168 |
03-07-2010 |
64. |
CERC (Rates, Charges and Terms and Conditions for use of Intervening Transmission Facilities) Regulations, 2010 1. Gazette 2. Notification 3. Statement of Reasons (September-2010) |
245 |
24-09-2010 |
63. |
CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010. 1. Gazette 2. Notification 3. Statement of Reasons (11-06-2010) |
162 |
16-06-2010 |
62. |
Procedure, Terms and Conditions for grant of trading licence and other related matters (First Amendment) Regulations, 2010. 1. Gazette 2. Notification 3. Statment of Reasons |
152 |
07-06-2010 |
61. |
CERC Payment of Fees (Amendment) Regulations, 2010. 1. Gazette 2. Notification |
153 |
07-06-2010 |
60. |
Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility Regulations, 2010 1. Gazette 2. Notification 3. Statement of Objects and Reasons (31-05-2010) |
154 |
07-06-2010 |
59. |
Central Electricity Regulatory Commission (Power system Development Fund) Regulations, 2010. 1. Gazette 2. Notification 3. Statement of Reasons |
155 |
07-06-2010 |
58. |
Procedure, Terms and Conditions for grant of Transmission Licence and other related matters (Amendment) Regulations, 2010 1. Gazette 2. Regulations 3. Statement of Reasons |
145 |
26-05-2010 |
57. |
Indian Electricity Grid Code Regulations, 2010 1. Gazette 2. Notification 3. Order (26-04-2010) 4. Statement of Reasons (18-06-2010) 5. Corrigendum (28-06-2010) 6. Addendum (28-06-2010) [Gazette No. 168] Dt.03-07-2009] 7. Detailed Procedure (18-02-2011) |
115 |
28-04-2010 |
56. |
CERC Unscheduled Interchange charges and related matters (Amendment) Regulations, 2010 1. Gazette 2. Notification 3. Order (26-04-2010) 4. Statement of Reason (26-05-2010) 5. Corrigendum (28-06-2010) [Gazette No. 167] Dt.03-07-2009] |
114 |
28-04-2010 |
55. |
Procedures for calculating the expected revenue from tariffs and charges Regulations, 2010 1. Gazette 2. Notification 3. Statement of Reasons (12-04-2010) |
96 |
16-04-2010 |
54. |
Central Electricity Regulatory Commission (Salary, Allowances and other Condition of Service of Chairperson and Members) Amendment Rules, 2004 Gazette |
120 |
19-03-2010 |
53. |
CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2010 1. Gazette 2. Notification 3. Order 4. Statement of Reasons (27-04-2010) |
58 |
25-02-2010 |
52. |
Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 1. Gazette 2. Notification 3. Order |
40 |
01-02-2010 |
51. |
Power Market Regulations, 2010 1. Gazette 2. Notification 3. Order 4. Statement of Objects and Reasons (28-01-2010) |
33 |
21-01-2010 |
50. |
Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010. 1. Gazette 2. Notification 3. Statement of Reasons(14-01-2010) |
26 |
18-01-2010 |
49. |
Fixation of Trading Margin Regulations, 2010. 1. Gazette 2. Notification 3. Statement of Reasons (11-01-2010) |
19 |
12-01-2010 |
48. |
Measures to relieve congestion in real time operation Regulations, 2009 1. Gazette 2. Notification 3. Corrigendum (04-02-2010) |
252 |
24-12-2009 |
47. |
Procedure, Terms and Conditions for grant of trading licence and other related matters (Second Amendment) Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (16-10-2009) |
197 |
23-10-2009 |
46. |
Furnishing of Technical Details by the Generating Companies Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (14-10-2009) |
198 |
23-10-2009 |
45. |
Fees and charges of Regional Load Despatch Centre and other related matters Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (27-11-2009) |
186 |
26-09-2009 |
44. |
CERC Tariff Regulations for Renewable Energy Sources Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (07-10-2009) |
176 |
17-09-2009 |
43. |
CERC Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (07-08-2009) 4. Statement of Reasons (30-10-2009) 5. Procedure for making application for Grant of connectivity in ISTS 6. Revised procedure for “Grant of connectivity to projects based on renewable sources to inter-state transmission system". I. Order II. Annexure |
140 |
10-08-2009 |
42. |
CERC Payment of fees (Amendment) Regulations, 2009 1. Gazette 2. Notification |
128 |
24-07-2009 |
41. |
CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009. 1. Gazette 2. Notification 3. Statement of Reasons (26-05-2009) |
94 |
02-06-2009 |
40. |
CERC (Conduct of Business) (Amendment) Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (26-05-2009) |
93 |
02-06-2009 |
39. |
CERC Notification re.CERC (Open Access in inter-state Transmission) (Amendment) Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (01-07-2009) 4. Corrigendum (10-07-2009) |
129 |
24-07-2009 |
38. |
CERC Unscheduled Interchange charges and related matters Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (08-06-2009) 4. Corrigendum (03-07-2009) [Gazette No. 127] Dt.24-07-2009] |
43 |
30-03-2009 |
37. |
Procedure, Terms and Conditions for grant of trading licence and other related matters Regulations, 2009 1. Gazette 2. Notification 3. Statement of Reasons (25-05-2009) |
28 |
24-02-2008 |
36. |
Terms and Conditions of Tariff, Regulations for 2009-14 1. Gazette 2. Notification 3. Appendix-I 4. Appendix-II 5. Appendix-III 6. Appendix-IV 7. Statement of Reasons (03-02-2009) 8. Corrigendum (10-06-2009) [Gazette No. 100] Dt.17-06-2009] 9. Addendum (10-06-2009) [Gazette No. 101] Dt.17-06-2009] |
11 |
20-01-2009 |
35. |
CERC revises payment of fees Regulations, 2008 1. Gazette 2. Regulations 3. Statement of Reasons (13-10-2008) |
174 |
27-10-2008 |
34. |
CERC Notification re. (Appointment of Consultants) Regulations, 2008 1. Gazette 2. Notification |
160 |
14-10-2008 |
33. |
CERC (Leased Accommodation) (First Amendment) Regulations, 2008 1. Gazette 2. Notification |
59 |
15-04-2008 |
32. |
CERC Notification re.CERC (Open Access in inter-State Transmission) Regulations, 2008 1. Gazette 2. Notification 3. Statement of Reasons (04-03-2008) |
10 |
07-02-2008 |
31. |
CERC Notification re.CERC(Terms and Conditions of Tariff)(Fourth Amendment) Regulations, 2007 1. Gazette 2. Notification |
235 |
31-12-2007 |
30. |
Sharing of revenue derived from utilisation of transmission assets for other business, 2007 1. Gazette 2. Notification |
236 |
31-12-2007 |
29. |
CERC Notification re.CERC(Terms and Conditions of Tariff)(Third Amendment) Regulations, 2007 Notification |
196 |
07-09-2007 |
28. |
CERC (Leased Accommodation)Regulations, 2007 1. Gazette 2. Notification |
236 |
17-08-2007 |
27. |
CERC (Recruitment, Control and Service Conditions of Staff) Regulations, 2007 1. Gazette 2. Notification | 156 |
31-07-2007 |
26. |
CERC Notification re.CERC(Terms and Conditions of Tariff)(Second Amendment) Regulations, 2007 1. Gazette 2. Notification |
98 |
27-04-2007 |
25. |
CERC Notification re.CERC(Terms and Conditions of Tariff) (Amendment) Regulations, 2007 1. Gazette 2. Notification |
60 |
14-03-2007 |
24. |
CERC Notification re.CERC(Procedure for making of Application for Determination of Tariff, Publication of the Application and Other Related Matters)(Amendment)Regulations, 2006 1. Gazette 2. Notification |
185 |
13-12-2006 |
23. |
CERC Notification re.CERC (Open Access in inter-state Transmission)(Amendment) Regulations, 2006 1. Gazette 2. Notification |
23 |
13-12-2006 |
22. |
CERC Notification re.CERC (Terms and Conditions of Tariff)(First Amendment) Regulations, 2006 1. Gazette 2. Notification |
27 |
01-06-2006 |
21. |
CERC Medical Regulations - Nov 2005 1. Gazette 2. Notification 3. List of Authorised Medical Practitioners (AMPs)/Hospitals 4. Old list of Empanelled Hospitals 5. CERC Empanelled Diagnostic Centres 6. Current list of Empanelled Hospitals |
149 |
17-11-2005 |
20. |
CERC Notification re.CERC (Terms and Conditions of Tariff)(first Amendment) Regulations, 2005 1. Gazette 2. Statement of Reasons (11-08-2005) |
120 |
25-08-2005 |
19. |
CERC Notification re.CERC (Open Access in inter-state Transmission)(First Amendment) Regulations, 2005 Gazette |
23 |
23-02-2005 |
18. |
CERC Notification re.CERC (Terms and Conditions of Tariff)(First Amendment) Regulations, 2004 Gazette |
28 |
09-09-2004 |
17. |
CERC Notification re.CERC(Procedure for making of Application for Determination of Tariff, Publication of the Application and Other Related Matters) Regulations, 2004 Gazette |
135 |
03-08-2004 |
16. |
CERC Notification re.CERC (Terms and Conditions of Tariff) Regulations, 2004 1. Gazette 2. Notification 3. Appendix-I Part-I(Thermal) 4. Appendix-I Part-II(Hydro) 5. Appendix-I Part-III(Transmission) 6. Appendix-II 7. Appendix-III |
68 |
29-03-2004 |
15. |
Central Electricity Regulatory Commission (Salary, Allowances and other Condition of Service of Chairperson and Members) Rules, 2004. Gazette |
119 |
08-03-2004 |
14. |
CERC Notification re.CERC (Open Access in Inter-State Transmission)Regulations, 2004 1. Gazette 2. Notification |
27 |
06-02-2004 |
13. |
Terms and Conditions of Tariff (Second Amendment) Regulation-2003 Gazette |
87 |
02-06-2003 |
12. |
CERC (Terms & Conditions of Tariff) (First Amendment) Regulations, 2003 Gazette |
65 |
02-05-2003 |
11. |
Terms and Condition of tariff Regulation - First Amendment- 2002 Gazette |
147 |
18-07-2002 |
10. |
Terms and conditions of Tariff L-25(1)/2001-CERC dt.21-09-01 Gazette |
252 |
24-09-2001 |
09. |
Terms and conditions of Tariff L-25(1)/2001-CERC dt.26-03-01 Gazette |
75 |
26-03-2001 |
08. |
Filing of Annual Report by Transmission Utility L-7/20(1)/99-CERC dt.10-07-00 Gazette |
91 |
15-07-2000 |
07. |
Filing of Annual Report by Thermal Generating Companies L-7/20(1)/99-CERC dt.28-04-00 Gazette |
63 |
25-05-2000 |
06. |
Conduct of Business Regulation (First Amendment) 8/1(1)/99-CERC dt 28-04-00 Gazette |
55 |
10-05-2000 |
05. |
Appointment of Consultants -1999 1/18(28)/99-CERC dt.29-12-99 Gazette |
114 |
31-12-1999 |
04. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 24-11-99 Gazette |
100 |
26-11-1999 |
03. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 27-08-99 Gazette |
70 |
30-08-1999 |
02. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 31-05-99 Gazette |
48 |
31-05-1999 |
01. |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 12-05-99 Gazzette |
48 |
31-05-1999 |
00 |
Conduct of Business Regulation-1999 8/1/99-CERC dt. 23-04-99 Gazette |
27 |
26-04-99 |